DOCUMENT GSC 15 PLEN69 GSC 15 GRSC 8

  • Slides: 21
Download presentation
DOCUMENT #: GSC 15 -PLEN-69; GSC 15 -GRSC 8 -10 FOR: Presentation SOURCE: ARIB

DOCUMENT #: GSC 15 -PLEN-69; GSC 15 -GRSC 8 -10 FOR: Presentation SOURCE: ARIB AGEND ITEM: OPENING PLEN 12. 2; GRSC 7. 1 CONTACT(S): Kohei Satoh (satoh@arib. or. jp) GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration (GSC) GSC-15

Highlight of Current Activities n GSC Task Force on IMT standardization was created under

Highlight of Current Activities n GSC Task Force on IMT standardization was created under the GRSC by Resolution of GSC-12 (Resolution GSC-12/01). n An objective of the Task Force is to exchange information and views on candidate radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard. n Activities would be expected to be carried out during the ITU-R WP 5 D, 3 GPPs and other regional meetings (e. g. , IMT-WG of AWF, CJK IMT WG meeting, etc. ). 2

Strategic Direction n The Task Force should be encouraged to actively help in the

Strategic Direction n The Task Force should be encouraged to actively help in the exchange of information and views with the goal of consensus building for the radio interfaces of IMTAdvanced and finalization of the Preliminary Draft New Recommendation on “Detailed radio interface specifications for IMT-Advanced [IMT. RSPEC]”. n Activities of the Task Force should be continued to develop the Preliminary Draft New Recommendation/ Report on “Analysis and assessment of global broadband wireless services and marketplace for IMT [IMT. UPDATE]”. 3

Next Steps/Actions n The Task Force proposes that GSC • endorses the further continuation

Next Steps/Actions n The Task Force proposes that GSC • endorses the further continuation of the IMT Task Force to exchange information and views with goal of finalization of the Preliminary Draft New Recommendation [IMT. RSPEC] and Preliminary Draft New Recommendation/Report [IMT. UPDATE], and • requests its PSOs to review their national/regional activities and to report on their progress to the Task Force and at the next GSC meeting. 4

Proposed Modification of Resolution GSC-14/01 n Considering recent activities in ITU-R WP 5 D,

Proposed Modification of Resolution GSC-14/01 n Considering recent activities in ITU-R WP 5 D, 3 GPP, PSOs and others on IMT-Advanced, Resolution GSC-14/01 (Continuing Cooperation on IMT Standardization) should be updated and modified as follows: èTo update “Recognizing part” as appropriate èTo add issues on the Preliminary Draft New Recommendation [IMT. RSPEC] and Preliminary Draft New Recommendation/Report [IMT. UPDATE] in “Resolves part” 5

Supplementary Slides 6

Supplementary Slides 6

Schedule for Development of IMT-Advanced Radio Interface in ITU-R WP 5 D meetings 2008

Schedule for Development of IMT-Advanced Radio Interface in ITU-R WP 5 D meetings 2008 #1 #2 2009 #3 #4 We are here! 2010 #5 #6 #7 #8 #9 2011 #10 Step 1 and 2 (0) (20 months) Step 3 (8 months) (1) Step 4 (16 months) (2) Steps 5, 6 and 7 (20 months) (3) Steps 8 (12 months) • Steps in radio interface development process: Step 1: Issuance of the Circular Letter Step 2: Development of candidate RITs Step 3: Reception of the submissions and issuance of an acknowledgement for RIT Step 4: Evaluation of candidate RITs by evaluation groups (4) Step 5: Review and coordination of outside evaluation activities Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Step 8: Development of Radio Interface Recommendation(s) • Critical milestones in radio interface development process: (0): Issue an invitation to propose RITs (1) : ITU proposed cut off for submission of candidate RIT and SRIT proposals March 2008 October 2009 (2): Cut off for evaluation report to ITU June 2010 (3) : WP 5 D decides framework and key October 2010 characteristics of IMT-Advanced RIT and SRIT (4): WP 5 D completes development of radio February 2011 interface specification Recommendations 7

IMT-Advanced Radio Interface Development Process ITU-R Outside ITU-R Step 1 Issuance of a Circular

IMT-Advanced Radio Interface Development Process ITU-R Outside ITU-R Step 1 Issuance of a Circular Letter to invite proposals for radio interface technologies and evaluations Step 2 Development of candidate radio interface technologies Step 3 Reception of the submissions and issuance of an acknowledgement for RIT Step 5 Review and coordination of outside evaluation activities of sion io s i m Sub ate rad id cand terface in ies olog n h c te Step 4 Evaluation of candidate radio interface technologies by independent evaluation groups, grouping or compromise of the technologies through consensus building Coordination between evaluation groups Step 6 Review to assess compliance with minimum requirements Descriptions of proposed radio interface technologies and evaluation reports Step 7 Consideration of evaluation results, consensus building, and decision Radio interface specifications (RSPECs), sufficiently detailed to enable worldwide compatibility Step 8 Development of radio interface Recommendation(s) Step 9 Implementation of Recommendation(s) 8

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (1) n Six proposals based

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (1) n Six proposals based on the IEEE 802. 16 m or 3 GPP LTE-Advanced technology were submitted for candidate radio interface technologies for IMT-Advanced at the 6 th meeting of ITU-R WP 5 D in Dresden, Germany. n WP 5 D determined that each submission was “complete”, and issued acknowledgement to all proponents. • The Step 3 of IMT-Advanced development process was completed. n Following the completion of the Step 3 of the IMT-Advanced development process, WP 5 D initiated evaluation of the six candidate technology submissions. • Correspondence Groups were established as a tool to augment communication and to facilitate the evaluation work of WP 5 D and the Independent Evaluation Groups on the candidate IMT-Advanced technologies. n The 3 rd workshop on IMT-Advanced was held on 15 th October 2009 in conjunction with the 6 th meeting of WP 5 D. • Proponents of IMT-Advanced candidate radio interface technology and external evaluation groups were invited to join and make presentations. 9

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (2) n WP 5 D

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (2) n WP 5 D received the final evaluation reports and relevant contributions on the candidate technologies at the 8 th meeting of WP 5 D in Da Nang, Viet Nam. • WP 5 D reviewed all the contributions in the administrative aspects and agreed that the Step 4 and Step 5 of the IMT-Advanced development process were completed. n WP 5 D performed review of the all final evaluation reports with a focus on technical aspects. • WP 5 D developed IMT-ADV documents for every final evaluation reports, each of which includes a summary of the final evaluation report. n WP 5 D started the Step 6 of IMT-Advanced development process at the 8 th meeting of WP 5 D. n WP 5 D developed IMT-ADV document addressing the process for the completion of the Preliminary Draft New Recommendation ITU-R M. [IMT. RSPEC]. • • The detailed workplan on [IMT. RSPEC] was updated, and a first draft of working document for [IMT. RSPEC] was developed. The update procedure for [IMT. RSPEC] was also addressed. 10

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (3) n WP 5 D

Standardization Activities of IMT-Advanced in ITU-R WP 5 D (3) n WP 5 D developed a working document for the Preliminary Draft New Recommendation/Report ITU-R M. [IMT. UPDATE] on “Analysis and assessment of global broadband wireless services and marketplace for IMT based on input contributions at the 8 th meeting of WP 5 D. • The [IMT. UPDATE] will be expected to be finalized in the 12 th meeting of WP 5 D. n In order to get the view on the future IMT, the workshop during the 9 th meeting of WP 5 D was proposed in the 7 th meeting of WP 5 D in Turin, Italy. • There were various views on the timing of the workshop in the 8 th meeting of WP 5 D. • It was decided to discuss issues on the workshop further in the 9 th meeting of WP 5 D to be held in Chongqing, China. 11

Recent Activities on IMT-Advanced in ARIB n The IMT-Advanced Subcommittee under the Advanced Wireless

Recent Activities on IMT-Advanced in ARIB n The IMT-Advanced Subcommittee under the Advanced Wireless Communications Study Committee is conducting technical studies on IMT-Advanced and promotes its standardization through contributions to ITU-R and other activities n The Radio Interface Technology Study Group and its Evaluation Group established under the IMT-Advanced Subcommittee prepared two draft proposals based on the IEEE 802. 16 m and 3 GPP LTEAdvanced for IMT-Advanced radio interface technologies, and they were submitted to the 6 th meeting of ITU-R WP 5 D through Japan’s national process n ARIB Evaluation Group was actively participated in IMT-Advanced evaluation activities to cooperate with other Independent Evaluation Groups through activities such as ITU-R Correspondence Groups and workshops/coordination meetings 12

Recent Activities on IMT-Advanced in ATIS WTSC along with TIA TR-45. 3 submitted the

Recent Activities on IMT-Advanced in ATIS WTSC along with TIA TR-45. 3 submitted the GCS and update package for TDMA-SC toward M. 1457 -10 to ITU-R WP 5 D. n ATIS as OP of 3 GPP submitted its letter of conveyance for CDMA-DS and CDMA-TDD toward M. 1457 -10 to ITU-R WP 5 D. n ATIS as OP proponent of 3 GPP IMT-Advanced submission provided its endorsement to ITU-R WP 5 D. n ATIS WTSC, as a registered Independent Evaluation Group, submitted interim and final IMT-Advanced evaluation reports on both IMT-Advanced proposals. n ATIS WTSC Evaluation Group actively participated in IMT-Advanced evaluation ITU-R Correspondence Groups and workshops/coordination meetings. n ATIS intends to be identified as a GCS Proponent and Transposing Organization for IMT-Advanced LTE-Advanced Radio Interface. 13

Recent Activities on IMT-Advanced in CCSA,the 3 GPP Organizational Partner,joined with 3 GPP in

Recent Activities on IMT-Advanced in CCSA,the 3 GPP Organizational Partner,joined with 3 GPP in providing the technology submission of LTE-Advanced as a candidate SRIT (includes an FDD RIT component and a TDD RIT component), for IMT-Advanced to ITU-R WP 5 D. n Through national process, China conducted the IMT-Advanced candidate submission of TD-LTE-Advanced technology which is the TDD RIT component of LTE-Advanced. n Chinese Evaluation Group actively participated in IMT-Advanced evaluation activities including ITU meetings, workshops, coordination meetings etc. CHEG’s final evaluation report was submitted to the 8 th meeting of ITU-R 5 D. It confirmed that both FDD RIT and TDD RIT of LTE-Advanced meet the ITU IMT-Advanced requirements. 14

Recent Activities on IMT-Advanced in ETSI has endorsed LTE-Advanced (as developed within 3 GPP)

Recent Activities on IMT-Advanced in ETSI has endorsed LTE-Advanced (as developed within 3 GPP) and submitted that technology to ITU-R as an IMT-Advanced candidate (together with all 3 GPP OPs) n ETSI has registered as an Evaluation Group for the purposes of IMT-Advanced and has followed the activities of other Evaluation Groups (by participating in IMT-Advanced workshops organized by the proponents). n ETSI continues to be proactive in ensuring that LTEAdvanced fully meets the requirements for IMTAdvanced and satisfies the needs of industry. 15

Recent Activities on IMT-Advanced in TIA TR-45. AHIMT registered with ITU-R WP 5 D

Recent Activities on IMT-Advanced in TIA TR-45. AHIMT registered with ITU-R WP 5 D as an Independent Evaluation Group for IMT-Advanced. n Conducted a complete evaluation according to ITU-R Recommendation M. 2135 -1. n Addressed all aspects of the evaluation of the technologies described in IMT ADV/4 and IMT ADV/8. n Monitored and participated in ITU-R Correspondence Forum n Maintained a web site to facilitate communication n Attended the industry sponsored workshops in Beijing and San Diego. n Discovered no cases where either IMT ADV/4 or IMT ADV/8 fail to meet the minimum requirements. n Submitted an interim report to the seventh meeting of ITU-R WP 5 D in Italy. n Submitted a final report to the eighth meeting of WP 5 D in Vietnam. n Ready to act as independent evaluation group in future. 16

Recent Activities on IMT-Advanced in TTA n IMT-Advanced Project Group (TTA PG 701) •

Recent Activities on IMT-Advanced in TTA n IMT-Advanced Project Group (TTA PG 701) • Actively participating in ITU-R WP 5 D IMT-Advanced Standardization • Preparing for the transposition on the revision of M. 1457 -9 • Collaboration with China, Japan through CJK IMT (ex. B 3 G) Meeting n IMT Wi. Bro PG (TTA PG 702) • Continue the close collaboration with IEEE 802. 16 WG • Currently focus on Standardization of “Wi. Bro Femto cell” and “Enhanced Wi. Bro” etc. n IMT Evaluation PG (TTA PG 707) • As an IEG of ITU-R, TTA PG 707 submitted two preliminary and two final evaluation reports on candidate RITs for IMT-Advanced • As the result of evaluation of TTA PG 707, two candidate technologies meet the minimum requirements of IMT-Advanced of ITU-R 17

Activities of the Asia-Pacific Telecommunity Wireless Forum (AWF) (1) n A major objective of

Activities of the Asia-Pacific Telecommunity Wireless Forum (AWF) (1) n A major objective of the Asia-Pacific Telecommunity Wireless Forum (AWF) is to promote new wireless applications in the Asia-Pacific region and in this regard: • The AWF Spectrum Working Group (WG-SPEC) identifies the spectrum requirements for new radio technologies and develops plans for harmonized spectrum usage for radiocommunication systems in the region. Studies are proceeding on frequency arrangements for the 698 -806 and 2300 -2400 MHz bands. ü The Correspondence Group (CG) activity on Frequency Arrangement(s) for the band 698 -806 MHz is continuing, with substantial input contributions to the latest phase of that work having already been received. This correspondence work is continuing and will be reviewed and fine-tuned at a face-to-face meeting of the CG on 12 th September in Seoul. We have the objective to seek to complete the work at the 9 th meeting of AWF, using the material from the CG as the major input to the discussions. ü With respect to Frequency Arrangements for the band 2300 -2400 MHz, the “APT REPORT on APT Frequency Arrangement on 2300 -2400 MHz for IMT/BWA (No. APT/AWF/REP-12) was adopted by the 8 th meeting of AWF. It remains to be seen if there is interest in developing an APT Recommendation based on this material, and this could be a discussion point at the 9 th meeting of AWF. 18

Activities of the Asia-Pacific Telecommunity Wireless Forum (AWF) (2) • • • WG-SPEC also

Activities of the Asia-Pacific Telecommunity Wireless Forum (AWF) (2) • • • WG-SPEC also develops optimum sharing methodologies between radio services and methods ensuring compatibility between systems. Studies are about to commence on Software Defined Radio and Cognitive Radio Systems. The AWF IMT Working Group (WG-IMT) reviews the activities on the future development of IMT-2000 and IMT-Advanced developed in the relevant ITU-R Working Parties WG-IMT develops views on issues arising from the review of the service and technology related aspects and the progress of the enhancement and evolution of IMT-2000 and IMT-Advanced by these ITU-R Working Parties and ascertains their applicability to the region n The 7 th and 8 th meetings of the AWF were held from 23 rd 26 th September 2009 in Phuket, Thailand, and from 29 th March to 1 st April 2010 in Tokyo, Japan, respectively. n The 9 th meeting of the AWF will be held from 13 th 16 th September 2010 in Seoul, Korea. 19

Resolution GSC-14/01 on IMT Standardization (1) Continuing Cooperation on IMT Standardization Recognizing: a) that

Resolution GSC-14/01 on IMT Standardization (1) Continuing Cooperation on IMT Standardization Recognizing: a) that Resolution ITU-R 56 describes a naming scheme for International Mobile Telecommunications whereby “IMT-Advanced” applies to those systems, system components, and related aspects that include new radio interface(s) that support the new capabilities of systems beyond IMT-2000; b) that Resolution ITU-R 57 outlines the essential criteria and principles that will be used in the process of developing the Recommendations and Reports for IMT-Advanced, including Recommendation(s) for the radio interface specification; c) that ITU-R Study Group 5 and ITU-T Study Group 13 are continuing studies on IMT (encompassing both IMT-2000 and IMT-Advanced); d) that ITU-R Study Group 5 has initiated a process for the development of terrestrial radio interface technologies that will meet the technical and operational requirements of IMTAdvanced; e) that core network(s) are increasingly becoming access technology agnostic; f) that IMT and other rapidly emerging wireless broadband access technologies will make highspeed wireless access services available where this was not previously possible, thereby enabling access to advanced telecommunication, computing and entertainment services and capabilities, not only for urban but also for rural and other low density environments; g) that WRC-07 identified some additional spectrum for the implementation of IMT systems; h) that work on evolution of the radio technologies may converge to use similar techniques; and i) that there are related international, regional and national research activities in this area. 20

Resolution GSC-14/01 on IMT Standardization (2) Continuing Cooperation on IMT Standardization Resolves: 1) 2)

Resolution GSC-14/01 on IMT Standardization (2) Continuing Cooperation on IMT Standardization Resolves: 1) 2) 3) 4) 5) 6) to encourage 3 GPP, 3 GPP 2, IEEE, Participating Standards Organizations (PSOs) and others to continue to work on enhancing the IMT standards as an essential part of future telecommunication, computing and entertainment standards; to encourage the harmonization of candidate proposals for the radio interface technologies for IMT and related networking standards; to invite 3 GPP, 3 GPP 2, PSOs and others to take care of the evolution of the current systems and the long-term evolution for such systems taking into account copyrights, working procedures, IPR aspects etc. and report to the next meeting for review; to exchange information and views on candidate radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard; to encourage the Task Force under the GRSC to actively help in the exchange of information and views mentioned in 4), with the goal of consensus building; and to review this Resolution at future GSC meetings as required. 21