doc IEEE 802 15 180056 r 00 January

  • Slides: 9
Download presentation
doc: IEEE 802. 15 -18/0056 r 00 January 2018 Project: IEEE P 802. 15

doc: IEEE 802. 15 -18/0056 r 00 January 2018 Project: IEEE P 802. 15 Working Group for Wireless Specialized Networks (WSNs) • • • Submission Title: [Liaison Report on 802. 18 for Jan 2018] Date Submitted: [18 January 2018] Source: [Jay Holcomb 802. 18] Company [Itron, Inc. ] Address [Liberty Lake (Spokane), WA 99019] Voice: [+1 -509 -891 -3281], FAX: [509 -891 -3896], E-Mail: [jay. holcomb@itron. com ] • Re: [Liaison Report on 802. 18 for Jan, 2018] • Abstract: [Liaison Report on 802. 18 for Jan, 2018] • Purpose: [Informative] • Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. • Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. Submission Slide 1 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG • Americas updates • New spectrum bill proposed (S. 1682) • Includes a section on rule making on the unlicensed use of 5925 to 7125 MHz. • Has gone no where. • ISED consultation on harmonizing TVWS with the US • Nothing of note to comment on. • ISED consultation on Spectrum Outlook 2018 - 2022 • Walked though the 23 questions and ID'd ones we may want to comment on. • No mention of the 6 GHz band • Comments due 16 February 2018 Submission Slide 2 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-2

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-2 • EMEA updates • 6 GHz activity • EC mandate, RSCOM 17 -53 rev 1, now final and is limited to 5925 -6425 MHz. • ERM SR Doc, TR 103 524 has some opposition, still expecting to get published end of January. • 3 GPPP RAN#78 (RP-172804) study item, looking at 5925 – 7125 GHz also. • CEPT ECC SE 45 and FM 57 had their first meetings. • SE 45 Introduced RLAN parameters as contained in the SRDoc ETSI TR 103 524. • FM 57 discussed the opportunity to prepare a questionnaire and obtain information on the actual deployment and technical and operational parameters of FS in the 6 GHz range. Submission Slide 3 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-3

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-3 • EMEA updates cont. : • 60 GHz activity • ETSI SR doc, TR 103 583 being worked on with some points on ITS channelization • Ofcom fixed wireless consultation looking at 6 and 60 GHz • Fixed wireless links could change over the next 5 -10 years. • Asking different things for 57 -66, 64 -66 and 66 -81 GHz bands. • And looking to move 1. 4 GHz users to the 6 GHz band. • Walked though the 11 questions and ID'd ones we may want to comment on. Refined at Ad Hoc on Wednesday. • Approved on Thursday. Submission Slide 4 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-4

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Items Reviewed/Discussed in the RR-TAG-4 • ETSI standards • EN 301 893 has a new work item looking at several things. • Including, Energy Detection Threshold, Receiver requirements with the blocking, and general text clarity • EN 302 567, 60 GHz, not in OJEU yet, possibly by end of February • Including OOB/Mask, Rx performance and test methods. • APAC updates • ACMA LIPD class licensing consultation • One of note is alignment with FCC in 57 -66 GHz • HKCA: Performance specification for radio equipment operating in the 920 -925 MHz band for the provision of public tele services Submission Slide 5 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Additional • IEEE SA •

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Additional • IEEE SA • Reviewed/commented on recent draft of the IEEE SA Board of Governors Position Statement on Additional Spectrum Needed (for IEEE). • This is a continuation of reviewing/commenting an earlier draft at the November 2017 Plenary. • Ofcom Presentation • Andy Gowans from Ofcom had a presentation on what is going on at Ofcom. • https: //mentor. ieee. org/802. 18/dcn/18/18 -18 -0012 -01 -0000 -ofcomupdate-for-ieee-802. pptx Submission Slide 6 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Documents Approved • Documents Approved

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Documents Approved • Documents Approved – Agenda for the week • https: //mentor. ieee. org/802. 18/dcn/18/18 -18 -0008 -02 -0000 -rr-tag-irvineinterim-meeting-agenda-january-2018. pptx – Orlando minutes • https: //mentor. ieee. org/802. 18/dcn/17/18 -17 -0140 -01 -0000 -meeting-minutesnov-2017 -orlando. docx – Teleconference minutes – Ofcom Fixed Wireless Consultation • https: //mentor. ieee. org/802. 18/dcn/18/18 -18 -0009 -02 -0000 -ofcom-questionsand-answers-fixed-wireless-spectrum-strategy. ppt – IEEE SA BOG Additional Spectrum Needed Position Statement • https: //mentor. ieee. org/802. 18/dcn/18/18 -18 -0010 -01 -0000 -sa-use-of-spectrumdraft-position-06 dec 17. docx Submission Slide 7 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Next • Americas - Work

January 2018 doc: IEEE 802. 15 -18/0056 r 00 Next • Americas - Work on ISED consultation for Spectrum Outlook 2018 - 2022 • EMEA – 6 GHz license exempt sharing – 60 GHz SR Doc. etc. • APAC – Anything new that comes up. • Ongoing: – Monitor / support ITU contributions, FCC comments, etc. Submission Slide 8 Jay Holcomb (Itron)

January 2018 doc: IEEE 802. 15 -18/0056 r 00 802. 18 Meeting Close •

January 2018 doc: IEEE 802. 15 -18/0056 r 00 802. 18 Meeting Close • The RR-TAG adjourned in AM 1 on Thursday. • Will hold weekly, as needed, teleconferences, 14: 30 ET Thursdays. – Scheduled through 26 April 2018 – Next teleconference planed for 25 January 2018, 1430 et/1130 pt • Call in information: 18 -16/0038 -08 (or latest) • All notices are sent through the 802. 18 listserver reflector. • The next face to face meeting of the 802. 18 RR-TAG will be the Plenary 06 -08 March 2018, Hyatt Regency O’Hare, Rosemont, Illinois, USA Submission Slide 9 Jay Holcomb (Itron)