doc. : IEEE 802. 11 -17/0496 r 0 March 2017 TGba March 2017 Closing

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 TGba March 2017 Closing Report Date: 2017 -03 -15 Authors: Submission Slide 1 Minyoung Park (Intel Corp. )

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Abstract • This document

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Abstract • This document is the TGba closing report for March 2017 Submission Slide 2 Minyoung Park (Intel Corp. )

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Work Completed • TG

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Work Completed • TG elected 2 Vice-Chairs – 1 st VC: Yunsong Yang (Huawei): Y/N/A = 62/0/1 – 2 nd VC: Eunsung Park (LG Electronics): Y/N/A = 60/0/1 • Reviewed technical presentations (17 out of 35 submissions) – Started to reach consensus on high-level technical PHY/MAC concepts – TGba Spec Framework Document will be created based on the passed motions • Updated TGba task group documents – Functional Requirements Document – Simulation Scenarios and Evaluation Methodology Document • Reviewed the TG timeline • Set goals for the May 2017 meeting and teleconference schedule • Agenda: see doc. : IEEE 802. 11 -17/193 r 7 Submission Slide 3 Minyoung Park (Intel Corp. )

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Goal for May 2017

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Goal for May 2017 • Review technical presentations – Reach consensus on high-level PHY and MAC designs • Work on TGba task group documents – Use case document (editor: Ross Yu) – Functional requirement document (editor: Ming Gan) – Evaluation methodology and simulation scenario document (editor: Shahrnaz Azizi) – Spec framework document (editor: TBD) • Review TG timeline Submission Slide 4 Minyoung Park (Intel Corp. )

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Teleconference Call Schedule •

doc. : IEEE 802. 11 -17/0496 r 0 March 2017 Teleconference Call Schedule • 3 teleconference calls (each 2 hours) • April 03 (Monday), 10: 00 ET • April 17 (Monday), 17: 00 ET • May 01 (Monday), 23: 00 ET Submission Slide 5 Minyoung Park (Intel Corp. )