Digi Vinyl InCar PC Mentor Derek Anderson Team

  • Slides: 10
Download presentation
Digi. Vinyl In-Car PC Mentor: Derek Anderson Team: Ben Griffith Dustin Withrow Alex Osterlind

Digi. Vinyl In-Car PC Mentor: Derek Anderson Team: Ben Griffith Dustin Withrow Alex Osterlind

Current Market In-car PC is a new area of development l Spawn forums and

Current Market In-car PC is a new area of development l Spawn forums and stores such as: l l Mp 3 car. com http: //mp 3 car. com Smaller hardware is making it possible l Flux Media l http: //www. fluxmedia. net/centrafuse. aspx l Road Runner http: //www. guino. home. insightbb. com/roadrunner. html

Flux Media: Centrafuse

Flux Media: Centrafuse

Road Runner

Road Runner

Goals and Objectives UML 2 standard iterative process l Minimal driver distraction l Automated

Goals and Objectives UML 2 standard iterative process l Minimal driver distraction l Automated wireless synchronization between home and car media library l Multiplatform player l Full integration of PC into car’s audio system l

Literature Review: GUI l l l Driver distraction trends and issues Interacting with Big

Literature Review: GUI l l l Driver distraction trends and issues Interacting with Big Interfaces on Small Screens: a Comparison of Fisheye, Zoom, and Panning Techniques Software for the Next-Generation Automobile Spatial Interactive Visualization on Small Screen Applying user-centered design to mobile application development

Literature Review: Networking A UDP-based file transfer protocol with flow control using fuzzy logic

Literature Review: Networking A UDP-based file transfer protocol with flow control using fuzzy logic approach l Implementation of Bluetooth ftp under Windows CE l TCP in a wireless world l Attacking automatic wireless network selection l Efficient wireless link bandwidth detection for IEEE 802. 11 networks l

Literature Review: Audio/Hardware Designing Leisure Applications for the Mundane Car-Commute l Bass Enhancement for

Literature Review: Audio/Hardware Designing Leisure Applications for the Mundane Car-Commute l Bass Enhancement for Automobile Multimedia Using Active Noise Equalizer l A Context-Aware Middleware for Applications in Mobile Ad Hoc Environments l How to Power a Computer from a Car l Designing an Internet Radio Interface Prototype l

System Diagram

System Diagram

Gantt Chart

Gantt Chart