DESIGN OF A COMMERCIAL SHOPPING CENTER BY TAYLOR
DESIGN OF A COMMERCIAL SHOPPING CENTER BY: TAYLOR STILES, TIMOTHY COLOMB, & LEIGHTON WEBRE INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE’
OBJECTIVE • To design a commercial shopping center consisting of 3 retail units in an area of commerce.
MAP LOCATION OF PROPERTY
AERIAL VIEW
SURVEY OF SITE
DRONE PICTURES OF SITE
DRONE PICTURES OF SITE
LOCATION • 0 S Airport Road, HAMMOND, LA 70403 • Price $1, 306, 800 • Lot Size 3 Acres • Commercial Property • Sewer Type: City • Water Type: Public • Electricity Provided By: Entergy
SHOPPING CENTER DETAILS • 59, 020 Square Ft. • 3. 00 Acre Lot • Price per Square ft. to build is estimated at $99. 69 • Total Estimated cost of construction of Shopping Center is $5, 883, 726. 14
PRELIMINARY FLOOR PLAN
RENTAL UNIT 1 • 15, 075 Sq. Ft. • Building Cost per Sq. Ft. = $99. 00 -$100. 00 • The preliminary cost for construction will be $1, 492, 425. 00. • Loan for $1, 492, 425. 00 with a 7% interest rate for 5 years or 60 months will be approximately $29, 551. 80/month. • Building Uptake cost ($2. 70 per square feet per year) estimate to be $40, 702. 5 • In respect to the location, buildings are rented at an average of $4. 67 per Sq. Ft. , which would contribute to around $70, 400. 00/monthly. • Estimated Profit Monthly – $37, 456. 325
RENTAL UNIT 2 • 9, 938 Sq. Ft. • Building Cost per Sq. Ft. = $99. 00 -$100. 00 • The preliminary cost for construction will be $983, 862. 00. • Loan for $983, 862. 00 with a 7% interest rate for 5 years or 60 months will be approximately $19, 481. 65/month. • Building Uptake cost ($2. 70 per square feet per year) estimate to be $26, 832. 6 • In respect to the location, buildings are rented at an average of $4. 67 per Sq. Ft. , which would contribute to around $46, 410. 00/monthly. • Estimated Profit Monthly - $24, 692. 35
RENTAL UNIT 3 • 34, 000 Sq. Ft. • Building Cost per Sq. Ft. = $99. 00 -$100. 00 • The preliminary cost for construction will be $3, 366, 000. • Loan for $3, 366, 000. 00 with a 7% interest rate for 5 years or 60 months will be approximately $66, 650. 83/month. • Building Uptake cost ($2. 70 per square feet per year) estimate to be $91, 800 • In respect to the location, buildings are rented at an average of $4. 67 per Sq. Ft. , which would contribute to around $311, 255. 00/monthly. • Estimated Profit Monthly - $236, 954. 17
STRUCTURAL COMPONENTS • Poured Concrete Slab • Steel Columns • Steel Beams • Brick Veneer • Concrete Masonry Walls • Bar Joists • Steel Beam Joist Roofing
F. E. M. A • Flood Zone ”X” • Not Flood Prone
PRELIMINARY BUILDING CODE REVIEW • Article 2. Administration • 2. 4. 2 Building Permit Required • Article 3. Permits and Final Plat Approval • 3. 1. 2 Permit Required • 3. 4. 3 METAL BUILDING FACADES • Article 4. Site Conditions • 4. 1. 4 Fill Requirements • Article 6. Zoning Districts • 6. 1. 4 Commercial • Article 13. Signs • 13. 1. 8 Sign requirements by zoning district. • Article 14. Parking • Off - Street Parking Requirements (Table 14. 2. 2 B) Commercial • Retail Sales And Service – 1 per 250 SF FA
• January 11, 2017 – First Day of class TIMELINE • January 16, 2017 January 22, 2017 (Meet With Advisor) • January 23, 2017 January 29, 2017 Finish Site Survey and Inspection • January 30, 2017 February 5, 2017 Prepare Presentation • February 6, 2017 February 12, 2017 Proposal Presentation • February 20, 2017 February 26, 2017 Complete Research of Business Aspect/Profit Margin • March 6, 2017 March 12, 2017 Start Project Scheduling • March 22, 2017 March 26, 2017 Completed Review of State and local building codes • March 27, 2017 April 2, 2017 Complete Floorplan and Elevation Drawing • April 3, 2017 April 9, 2017 Complete Design Drawing • April 10, 2017 April 16, 2017 Complete Material Take-off • April 17, 2017 April 23, 2017 Complete Project Scheduling • April 24, 2017 April 30, 2017 Prepare for Final Presentation • May 5 (Final Presentation)
DELIVERABLES FOR SPRING 2017 • Continue Developing Floorplan and Elevation Drawings • Complete Estimate • Project Scheduling • Review LBC and State Building Codes to ensure all have been met • Completed Design Drawing (Foundation and Structural)