Decisiondirected Joint Tracking Loop for Carrier Phase and

  • Slides: 13
Download presentation
Decision-directed Joint Tracking Loop for Carrier Phase and Symbol Timing in QAM Project 2

Decision-directed Joint Tracking Loop for Carrier Phase and Symbol Timing in QAM Project 2 ECE 283 Fall 2004

Outline • • • System concept QAM signal source and receiver Decision-directed PLL Characterization

Outline • • • System concept QAM signal source and receiver Decision-directed PLL Characterization Tools Submission

System Concept (1) Simplified 64 -QAM communications system 64 -QAM demodulated with perfect phase

System Concept (1) Simplified 64 -QAM communications system 64 -QAM demodulated with perfect phase and 2. 5% phase lag

System Concept (2) Receiver Transmitter QAM receiver system QAM communication system

System Concept (2) Receiver Transmitter QAM receiver system QAM communication system

QAM Signal Source and Receiver QAM receiver QAM transmitter

QAM Signal Source and Receiver QAM receiver QAM transmitter

Decision-directed PLL system diagram

Decision-directed PLL system diagram

Complete System

Complete System

PLL Output (1) Phase locking performance with a random QAM waveform

PLL Output (1) Phase locking performance with a random QAM waveform

PLL Output (2) Phase locking with 10% deviated frequency signal

PLL Output (2) Phase locking with 10% deviated frequency signal

PLL Tuning • • • Modulation frequency Number of waves per symbol LPF VCO

PLL Tuning • • • Modulation frequency Number of waves per symbol LPF VCO and VCC Symbol feedback delay

Characterization • • Waveforms Timing error (RMS) Capture range Loop lock range Effect of

Characterization • • Waveforms Timing error (RMS) Capture range Loop lock range Effect of symbol error Effect of signal noise And more

Tools • A Continuous-time simulation tool – Simulink is recommended – Circuit-level simulation ?

Tools • A Continuous-time simulation tool – Simulink is recommended – Circuit-level simulation ?

Submission • Files: All files should be in “lastname_firstname” directory and the directory should

Submission • Files: All files should be in “lastname_firstname” directory and the directory should be compressed – Document: IEEE journal format, ps or pdf, “lastname_firstname. ps/pdf” – Source Files: One-step testable codes with appropriate waveform output scopes • Deadline: 11: 00 pm, 10/15 Friday, time marked by receiving mail server • Email: dkim@ee. duke. edu