December 13 2018 Operations and Maintenance Plaza de

  • Slides: 9
Download presentation
December 13, 2018

December 13, 2018

Operations and Maintenance • Plaza de Fundación • Christopher Columbus Parking Lot • Continues

Operations and Maintenance • Plaza de Fundación • Christopher Columbus Parking Lot • Continues Deflective Separation Systems (CDS) • Motorized Vehicles

Plaza de Fundación • The plaza water continues to be managed for water quality.

Plaza de Fundación • The plaza water continues to be managed for water quality. • During this time, samples are taken daily to determine if the bacterial levels are in an acceptable range. • Typically, samples are taken every Wednesday and recorded on the SARA website.

Christopher Columbus Parking Lot • Lease Agreement- 60 months • Lot to be used

Christopher Columbus Parking Lot • Lease Agreement- 60 months • Lot to be used for SPC patrons and park events • 20 spaces of the 59 are reserved every day • All 59 spots 20 times per year can be used for SPC events • Parking lot improvements

CDS Systems (Continues Deflective Separation) • Concrete structure on the inside is a spiraling

CDS Systems (Continues Deflective Separation) • Concrete structure on the inside is a spiraling slide that causes water to swirl and the centrifugal force pulls the trash out • Trash settles to the bottom and can be vacuumed out when necessary. • TCI is responsible for cleaning out the system after each rain event with their vac truck

Motorized vehicles • Dockless Scooters • SARA continues to be a part of public

Motorized vehicles • Dockless Scooters • SARA continues to be a part of public and stake holder meetings • At this time, under city code Sec. 22 -4 -1, motorized vehicles are not allowed in city parks or on trails • Scooter signage has been updated • Increased operations and maintenance

QUESTIONS?

QUESTIONS?