David Rodrguez Pieiro Mainz University OLYMPUS Collaboration Meeting
David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY 23. 02. 2010 OLYMPUS Collaboration Meeting Cooling Water 23/02/2010
Cooling Water 1. – Starting Data 2. – OLYMPUS – BLAST Water 3. - Pressure Reduction 4. - Supply Power Cable Cooling 5. - Summary 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 2
Cooling Water 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 3
Cooling Water 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 4
Cooling Water 10 bars Pressure 70 m 3/h Flow 200 mm Diameter 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 5
Cooling Water 168, 3 mm Diameter Some Flanges Available More Pipes Needed 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 6
Cooling Water 2. – OLYMPUS – BLAST Water 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 7
Cooling Water Enters this Side 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 8
Cooling Water 2 OUTs 1 IN Manifold Distributes Water 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 9
Cooling Water Distributing Manifolds 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 10
Cooling Water to Manifolds Space Availableat DESY Pit: Alignmentof the Tank Thread with Pipes Going to Manifolds 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 11
Cooling Water Shift Tank Thread 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 12
Cooling Water Double Water Circuit (In – Out) Connectionwith Tank Thread Separated Circuit for Mounting. Beam Position 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 13
Cooling Water 1 Tee 2 Valves 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 14
Cooling Water 3. - Pressure Reduction 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 15
Cooling Water From 10 to 8 Bars Restriction Orifice Plate 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 16
Cooling Water 10 bar Water Pressure Reduction FEASIBLE 7 to 8 bar Water Flow: To Be Checked Pressure Release Valve d ~ 38 – 41 mm Screw 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 17
Cooling Water 4. - Supply Power Cable Cooling 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 18
Cooling Water BLAST: Coolingof Cables Going to the Coils 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 19
Cooling Water Neededfor OLYMPUS? 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 20
Cooling Water Summary - Layout ofthe Pipes Circuit Done - More Pipes Needed - BLAST Pipesand Fittings Available - Separated Circuitsfor Mounting-Beam Position - Orifice Platefor Pressure Reduction - Water Flowto Be Checked - Supply Power Cable Cooling Needed? 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 21
Cooling Water Thank you! Personal Contact: d. rodriguezpineiro@gsi. de Tel: +49 (0) 6159171/1634 web. mit. edu/OLYMPUS 23/02/2010 David Rodríguez Piñeiro - Mainz University - OLYMPUS Meeting 22
- Slides: 22