DART Mission Assurance Process Map Chief SMA Officer


- Slides: 2

DART Mission Assurance Process Map Chief S&MA Officer Mission Directorate Exploration Systems Mission Directorate Space Operations Explorers Program Office MSFC CD KSC SMA MSFC SMA DART Project Office (J. Snoddy) 1 LS SMA MAM (J. Roddy) KSC LSPO 2 SFIA (D. Elliott) DART Contract SELVES Contract (CPIF) 5 S/W IV&V (P. Medley) Orbital Sciences Corp. LSG-DART - Range Safety - Ground Safety - Range LRR L 10 -11 DART 6 OSC LSG Qual, Safety&Rel Assurance 11 OSC TSD Quality Assurance MSFC SMA Test Engr (Kalia) 12 13 Vehicle 16 MSFC SMA DART S/W Assurance (Mitchell) 17 DART SMA Qual Eng (Pierce) 19 MSFC DART SMA Qual Assur (Rains) FAA OSC S/W Assur. -- L 1011 Airworthiness - Public Safety 15 14 ARPO AVGS 18 LSP Eng Teams (J. Wood, B. Henry) VAFB 4 DART SMA Mgr (M. Kennedy) (FFP) 20 21 MSFC DART SMA Qual Insp (Blair) MSFC SMA DART S/W Assurance (Mitchell) Orbital Sciences Corp. LSG-Pegasus 3 Pegasus VAFB INT & OPS 7 KSC LS SMA Quality Mgr (K. Monette) Safety Mgr (H. Schultz) 8 9 KSC LSP Mission Int. (Bellinger) Res. Office (Westoff) Matrix-ed relationship Direct report relationship Information flow Independent MA activity In-line MA activity 10 KSC LS SMA 1 SMA (T. Arrigo)

Ref Mission Phase *** Location Point of Contact Organization 1 1, 2, 510 KSC SMA/Launch Services Division SMA (KSC LS SMA) Mission Assurance Mgr. : Pegasus Flt. Readiness assessment and SMA support to KSC Launch Services Program (LSP) (L 3) KSC Jordan Roddy KSC LS SMA 2 2 KSC SMA Space Flight Independent Assessment (SFIA) Focused IA to KSC LSP (L 3) KSC Dawn Elliott KSC LS SMA 3 2, 5 -10 LSP Vehicle Engineering Specialty Teams: Chief Engr and Vehicle Systems Lead. Mission Analysis, ERBs, TIMs, Design Reviews, Readiness Reviews, Project Decision Meetings, Mission-Unique Design Validation and Verification to Orbital Sciences Corp. (OSC) Launch Services Group (LSG) – Pegasus (L 4 -5) KSC James Wood Bob Henry KSC LSP 4 3, 4, 5 DART SMA Manager to OSC LSG-DART: Reliability prediction/FEMA, Safety Training (L 5); Hazard analyses, Monitoring of mishap reporting, GIDEP alerts, Review of discrepancy reports, Limited Life Item Status, Mission Risks Review, Waivers/Deviations Review (L 3) Dulles Marcie Kennedy MSFC SMA 5 2 -7 Software IV&V to DART operational elements (L 3) GSFC Peter Medley NASA HQ 6 9 FAA oversight of L 10 -11 (Airworthiness and Public Safety) Moave 7 5 -10 KSC LS SMA Quality Management to Pegasus Integration & Test (L 3) VAFB Kevin Monette KSC LS SMA 7 5 -10 KSC LS SMA Safety Management to Pegasus Integration & Test (L 3) VAFB Heidi Schultz KSC LS SMA 8 2, 5 -10 KSC LSP Mission Integration Engineering (Spacecraft integration to LV). Approval of integration reqmts. (L 4 -5) Dulles Frank Bellinger KSC LS SMA 9 2, 5 -10 KSC LSP Resident Office Engineering support to VAFB Payload Integration and Launch Operations (L 4) Chandler Wendy Westoff KSC LSP 10 2, 5 -10 KSC LS SMA support to VAFB Payload Integration and Launch Operations (L 4) KSC Tony Arrigo KSC LS SMA 11 1 -10 12 DART Mission Assurance Activities FAA OSC LSG Quality, Safety & Reliability Assurance to Vehicle Hardware Development and Test (direct in-line contractor participation) (L 5) Dulles OSC LSG 3, 4 Systems Test Engineering and Reliability Consultation to Vehicle Hardware Development and Test (L 3) Dulles Prince Kalia MSFC SMA 13 3, 4 Systems Test Engineering and Reliability Consultation to AVGS Hardware Development and Test (L 3) Dulles Prince Kalia MSFC SMA 14 1 -7 OSC Technical Services Division (TSD) Quality Assurance to AVGS Hardware Development and Test (direct in-line contractor participation) (L 5) Dulles OSC TSD 15 2 -7 OSC S/W Quality Assurance to Autonomous Rendezvous & Proximity Operations (ARPO) S/W Development (L 5) Dulles OSC 16 2 -7 Software Assurance to DART on-board computer software development (L 3) MSFC George Mitchell MSFC DART SMA 17 3, 4 Quality Engineering surveillance of Vehicle Hardware Development, Assembly, and Test (L 5) Dulles Jim Pierce MSFC SMA 18 3, 4 Quality Engineering surveillance of AVGS Hardware Development and Test, and vehicle systems integration test (L 5) Dulles Jim Pierce MSFC SMA 19 1, 2, 3 Quality Assurance SMA surveillance to AVGS Hardware Development and Test (L 5) Dulles Rains MSFC DART SMA 20 1 Quality Assurance (Receiving & Inspection) to AVGS Hardware Development (L 5) MSFC Blair MSFC DART SMA 21 2 -7 Software Assurance to AVGS Software Development (L 5) MSFC George Mitchell MSFC DART SMA *** Mission Phases: 1. Procurement, 2. Design (HW & SW), 3. Payload Manufacture, 4. Payload Systems test, 5. S/C integration to LV, 6. LV integration, 7. System test and Simulated flight, 8. Pre-launch Ops, 9. Launch ops, 10. Post-launch ops.