Darkroom for PMTSi PM tests Umut KOSE Darkroom
- Slides: 16
Darkroom for PMT/Si. PM tests Umut KOSE Darkroom for PMT/Si. PM tests 1
Where: in building 3179, Idea. Square PMTs Rack with HV unit, oscilloscope, laser system etc. Taking over the work on preparation of the darkroom on the beginning of August. Deadline for being ready on 20 September 2015. Most of the ordering/purchasing done before taking over! Darkroom for PMT/Si. PM tests 2
Electronics Lab. Darkroom for PMT/Si. PM tests 3
Panels: to pass HV, signal and fiber cables to the darkroom Protective rubber foam pipe Fixed on the wall on 25 August 2015 Ready on 20 August 2015 Darkroom for PMT/Si. PM tests 4
HV/SHV connectors on the panel Signal cable BNC Adapter Connectors were not proper one for the signal cable! Therefore BNC adapters had been ordered and the frame had to be corrected accordingly (10 -11 September 2015)! Solution: New frame (5 cm width Al profile) set below the old one (8 cm width Al profile). Total depth about 13 cm which is enough to bend the cables through the hole. Done on 12 September 2015 Darkroom for PMT/Si. PM tests 5
Darkroom Cable trays to extend the cables to the working place. Fixed on 26 August 2015 Darkroom for PMT/Si. PM tests 6
Covers on the ceiling Done on 10 September 2015 Darkroom for PMT/Si. PM tests 7
Left-side of the darkroom PMT table Prepared on 21 August Painted on 24 August Fixed on 11 September PMT support Darkroom for PMT/Si. PM tests 8
Right-side of the darkroom to be used by second experimental tests Darkroom for PMT/Si. PM tests 9
Covering PMT table with black curtain Solution: Use string to hold the black curtain 16 September 2015 Darkroom for PMT/Si. PM tests 10
Upper part: one side fixed on the wall then hanged and clinched on the string. 16 September 2015 Darkroom for PMT/Si. PM tests 11
19 -20 September 2015: three pieces were stitched together, hook prepared&attached. Thanks to Umut for her valuable help Darkroom for PMT/Si. PM tests 12
Current situation of the darkroom: Darkroom for PMT/Si. PM tests 13
What are missing? Second door: just received an email, door arrived to CERN good reception, tomorrow in Idea. Square. To be fixed soon. Air ventilation: contacting Alexandre Joel Broche installing the ventilation system and knowing the network in the building. He will propose some solutions within couple of days. MCA: ordering done, to be arrived soon. Darkroom for PMT/Si. PM tests 14
Storage: If you need to store PMTs in Idea. Square, I strongly recommend you to use the container outside of the building. Darkroom for PMT/Si. PM tests 15
Please keep in mind that the electronic lab is opened to anyone. • Use the place devoted for you, • Keep it clean, • Contact me if you need something. Darkroom for PMT/Si. PM tests 16
- Pmtsi
- Ace different help iq tests still
- Umut
- Umut oban
- Umut i̇nternet
- Umut acar cmu
- Lung capacity
- Blake pouch kisti
- Amundson kariyer tekeri modeli
- A1 antitripsin eksikliği
- Yunus.hacettepe
- Umut tunga
- Tire umut psikolojik danişmanlik merkezi
- Darkroom infection control guidelines
- Film hopper in radiography
- Photogram process
- What is darkroom photography