Where: in building 3179, Idea. Square PMTs Rack with HV unit, oscilloscope, laser system

Where: in building 3179, Idea. Square PMTs Rack with HV unit, oscilloscope, laser system etc. Taking over the work on preparation of the darkroom on the beginning of August. Deadline for being ready on 20 September 2015. Most of the ordering/purchasing done before taking over! Darkroom for PMT/Si. PM tests 2

Electronics Lab. Darkroom for PMT/Si. PM tests 3

Electronics Lab. Darkroom for PMT/Si. PM tests 3

Panels: to pass HV, signal and fiber cables to the darkroom Protective rubber foam

Panels: to pass HV, signal and fiber cables to the darkroom Protective rubber foam pipe Fixed on the wall on 25 August 2015 Ready on 20 August 2015 Darkroom for PMT/Si. PM tests 4

HV/SHV connectors on the panel Signal cable BNC Adapter Connectors were not proper one

HV/SHV connectors on the panel Signal cable BNC Adapter Connectors were not proper one for the signal cable! Therefore BNC adapters had been ordered and the frame had to be corrected accordingly (10 -11 September 2015)! Solution: New frame (5 cm width Al profile) set below the old one (8 cm width Al profile). Total depth about 13 cm which is enough to bend the cables through the hole. Done on 12 September 2015 Darkroom for PMT/Si. PM tests 5

Darkroom Cable trays to extend the cables to the working place. Fixed on 26

Darkroom Cable trays to extend the cables to the working place. Fixed on 26 August 2015 Darkroom for PMT/Si. PM tests 6

Covers on the ceiling Done on 10 September 2015 Darkroom for PMT/Si. PM tests

Covers on the ceiling Done on 10 September 2015 Darkroom for PMT/Si. PM tests 7

Left-side of the darkroom PMT table Prepared on 21 August Painted on 24 August

Left-side of the darkroom PMT table Prepared on 21 August Painted on 24 August Fixed on 11 September PMT support Darkroom for PMT/Si. PM tests 8

Right-side of the darkroom to be used by second experimental tests Darkroom for PMT/Si.

Right-side of the darkroom to be used by second experimental tests Darkroom for PMT/Si. PM tests 9

Covering PMT table with black curtain Solution: Use string to hold the black curtain

Covering PMT table with black curtain Solution: Use string to hold the black curtain 16 September 2015 Darkroom for PMT/Si. PM tests 10

Upper part: one side fixed on the wall then hanged and clinched on the

Upper part: one side fixed on the wall then hanged and clinched on the string. 16 September 2015 Darkroom for PMT/Si. PM tests 11

19 -20 September 2015: three pieces were stitched together, hook prepared&attached. Thanks to Umut

19 -20 September 2015: three pieces were stitched together, hook prepared&attached. Thanks to Umut for her valuable help Darkroom for PMT/Si. PM tests 12

Current situation of the darkroom: Darkroom for PMT/Si. PM tests 13

Current situation of the darkroom: Darkroom for PMT/Si. PM tests 13

What are missing? Second door: just received an email, door arrived to CERN good

What are missing? Second door: just received an email, door arrived to CERN good reception, tomorrow in Idea. Square. To be fixed soon. Air ventilation: contacting Alexandre Joel Broche installing the ventilation system and knowing the network in the building. He will propose some solutions within couple of days. MCA: ordering done, to be arrived soon. Darkroom for PMT/Si. PM tests 14

Storage: If you need to store PMTs in Idea. Square, I strongly recommend you

Storage: If you need to store PMTs in Idea. Square, I strongly recommend you to use the container outside of the building. Darkroom for PMT/Si. PM tests 15

Please keep in mind that the electronic lab is opened to anyone. • Use

Please keep in mind that the electronic lab is opened to anyone. • Use the place devoted for you, • Keep it clean, • Contact me if you need something. Darkroom for PMT/Si. PM tests 16