CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 12 January 2004

CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 12 January 2004 CXC Status Report/CUC

Topics • • • Program Level Status Operations Mission Metrics Data System Chandra Grant

Topics • • • Program Level Status Operations Mission Metrics Data System Chandra Grant Awards 12 January 2004 CXC Status Report/CUC 2

Program Level Status • Spacecraft continues to perform extremely well overall and operations continue

Program Level Status • Spacecraft continues to perform extremely well overall and operations continue to be routine (despite very high solar activity in Oct-Nov) – Swapped Inertial Reference Units in July; retaining noisy gyro as backup unit. First major unit swap of the mission went smoothly. – Three minor anomalies occurred (details follow) – No safe modes have occurred since last report (last safemode 1999) • Science planning, data processing and distribution are proceeding smoothly • Cycle 6 Call for Proposals was issued 12/15/03 • 16 press releases, 1 video release and 1 SSU in last 6 months. • Independent Implementation Review (IIR) was held 11/18/03 with no findings and 2 observations. No significant actions. • CXC contract transitioned smoothly from the old to new contract on 9/1/03 • The plan for meeting the out-year budget profile is on-track for FY 04 with no significant near-term budget or staffing concerns • Congratulations to Harvey and Martin on winning the Rossi! 12 January 2004 CXC Status Report/CUC 3

Operations Status • Spacecraft – Completed swap from IRU-1 to IRU-2 on 19 July

Operations Status • Spacecraft – Completed swap from IRU-1 to IRU-2 on 19 July to retain the use of gyro 1 as a backup in the event of safemode. – Implemented a software patch to decrease the number of unwanted radiation shutdowns on radiation belt entry - no cases since patch – Nominal summer eclipse season – Cooled Aspect Camera CCD from – 10 deg to – 15 deg to reduce warm pixels. Dark current calibration indicates expected reduction of ~50% – Impulse event thought to be from a Leonids meteoroid; no indication of adverse affect on systems – EPHIN supply voltage current limited at high temperatures; attitudes are being selected to avoid high temperatures – An Optical Bench Assembly heater zone was detected on 12/22/03 in apparent “stuck on” state resulting in 3 -4 deg F increase temperature. No science impact seen. Fault tree under development. 12 January 2004 CXC Status Report/CUC 4

Operations Status • 8 executions of SCS 107 to halt observing due to high

Operations Status • 8 executions of SCS 107 to halt observing due to high solar activity – Extremely high solar activity in Oct-Nov resulted in a significant decrease in observing efficiency (reduced from ~70% to ~45%) – Increased ACIS CTI degradation is expected (~1 year of budget) • 4 load interrupt TOOs successfully observed • Science Instruments operating extremely well overall – ACIS bakeout decision expected ~March 04 for possible ~April bakeout – HRC –Y shutter failed to insert due to motor controller selection failure; anomaly under investigation. Operations impact low since shutter is rarely used. Flight Software mod will limit mechanism motions during safeing – Investigating using HRC anticoincidence shield as alternate radiation detector in response to EPHIN thermal trend • Completed relocation of the ASVT (spacecraft simulator) from the West Coast to the OCC. Transfer resulted in more direct access to equipment for procedure testing and patch development. 12 January 2004 CXC Status Report/CUC 5

Impulse (Leonid) Event 11/15/03 12 January 2004 CXC Status Report/CUC 6

Impulse (Leonid) Event 11/15/03 12 January 2004 CXC Status Report/CUC 6

Aspect Camera Performance (cooled CCD) 12 January 2004 • Dark current decreased ~50% following

Aspect Camera Performance (cooled CCD) 12 January 2004 • Dark current decreased ~50% following cool-down • Distribution before cool down (red) shifts left after cool-down (black); early mission distribution (green) • Fraction of warm pixels (>200 electrons/s) decreased sharply following cool-down • Result is improved centroiding CXC Status Report/CUC 7

Operations Status • Load interrupt TOOs Date 06/30/03 07/23/03 12/02/03 12/24/03 Target Mrk 421

Operations Status • Load interrupt TOOs Date 06/30/03 07/23/03 12/02/03 12/24/03 Target Mrk 421 H 2777 GRS 1915+105 GRB 021220 Request 24 hours 3 days • Operations Ground System Updates Date 06/25/03 06/27/03 07/15/03 12 January 2004 Version ONLS 3. 9. 3 GRETA 2. 1 Change New DSN data types and fixes Rollback Multiple fixes and enhancements CXC Status Report/CUC 8

Mission Metrics 12 January 2004 MUPS Fuel Usage CXC Status Report/CUC 9

Mission Metrics 12 January 2004 MUPS Fuel Usage CXC Status Report/CUC 9

MUPS Warm Start Count 12 January 2004 CXC Status Report/CUC 10

MUPS Warm Start Count 12 January 2004 CXC Status Report/CUC 10

Scheduled Observing Efficiency 12 January 2004 CXC Status Report/CUC 11

Scheduled Observing Efficiency 12 January 2004 CXC Status Report/CUC 11

Cumulative Observations for NRA-4 12 January 2004 CXC Status Report/CUC 12

Cumulative Observations for NRA-4 12 January 2004 CXC Status Report/CUC 12

Data Systems • Data processing – Average time from observation to data delivery has

Data Systems • Data processing – Average time from observation to data delivery has continued at <1 week • CIAO and Data System Software Releases Date 07/03/03 08/06/03 09/03/03 09/16/03 12/15/03 12/30/03 Release ATOMDB 1. 3. 1 CIAO 3. 0 CXCDS 7. 0 CIAO 3. 0. 1 CIAO 3. 0. 2 CXCDS 7. 1 Content includes Models extended to 50 ke. V Major release Major infrastructure release Data model and Sherpa fixes Cycle 6 Proposal tools and fixes Cycle 6 Proposal web tools Grant Awards • Cycle 5 archive and theory grants issued Dec 03 – Jan 04 • Impact of transition to new Smithsonian-wide MIS system still being felt, with ~3 weeks to grant award (had been ~1 week) 12 January 2004 CXC Status Report/CUC 13

Data Delivery Effectiveness As of middle of following month Month Numb er of Obs

Data Delivery Effectiveness As of middle of following month Month Numb er of Obs Days to Data Delivery Min Avg Max As of 12/19 /03 Numb er Deliv Number Outstanding Number Deliv Number Outstanding Dec-02 79 1 5 16 79 0 Jan-03 57 1 5 16 7 0 57 0 Feb-03 62 1 5 20 62 0 Mar-03 115 1 5 29 115 0 Apr-03 126 0 5 16 126 0 May-03 46 1 7 44 45 1 46 0 Jun-03 51 1 6 22 50 1 51 0 Jul-03 53 1 7 19 53 0 Aug-03 60 0 7 34 60 0 Sep-03 54 1 5 25 54 0 Oct-03 36 1 6 21 36 0 Nov-03 88 0 3 12 88 0 12 January 2004 CXC Status Report/CUC Obsids Outstanding (see below for details) 14

Chandra Grant Awards 5. 5 GRANT AWARD FFECTIVENESS Month of Data Delivery As of

Chandra Grant Awards 5. 5 GRANT AWARD FFECTIVENESS Month of Data Delivery As of middle of following month No. Grants (1) No. Grants Awarded No. Outstand ing Avg days to award (2) As of 12/19/03 No. Grants Awarde d Grants to Non-Federal Institutions Dec * 62 15 47 43 62 Jan * 20 15 5 16 20 Feb * 22 9 13 20 22 Mar * 23 19 4 21 23 Apr * 9 7 2 10 9 May * 13 11 2 17 13 Jun* 8 5 3 15 8 Jul * 27 23 4 23 27 Aug * 14 13 1 19 13 Sep * 17 13 4 14 15 Oct * 15 6 9 18 3 Nov * 5 3 2 20 3 * Grant awards delayed due to SAO conversion to new Institute-wide financial software system 12 January 2004 CXC Status Report/CUC No. Outstand ing 0 0 0 0 1 2 2 2 Outstanding Awards Proposal no, Comments 4800327 4600441 (A&B) 4400516, 4400554 4700279, 4800713 15