Prototypes waiting for test slot @MPI Prototypes built by Lorima Arrived @MPI since May

Prototypes waiting for test slot @MPI Prototypes built by Lorima Arrived @MPI since May Waiting for test slot Each month lost is less time for improvements in case on non positive test conclusion ? Consecutive tube junction 23/09/2014 CSS / dish interface part Catania Meeting G. Lamanna 2

Les surprises du prototype manchon Pincement du manchon lors de son ouverture • Largeur

Les surprises du prototype manchon Pincement du manchon lors de son ouverture • Largeur de rainure longitudinale insuffisante • Au serrage contact sur lèvres du manchon Pincement du manchon lors de son ouverture Un petit usinage maison grâce à Laurent et hop dans la caisse ! 23/09/2014 Catania Meeting G. Lamanna 3

CSS / dish interface part

CSS / dish interface part

Consecutive tube junction

Consecutive tube junction

Final definition of details Ø Cables and pipes supports defined • Glass fiber part

Final definition of details Ø Cables and pipes supports defined • Glass fiber part glued on CSS • Electrical cables fixation • Cooling pipes fixation Ø Teflon plate supports defined • Glass fiber part glued on Camera frame • 400 mm x 600 mm reflector foreseen 23/09/2014 Catania Meeting G. Lamanna 6

Camera frame : Key values Camera frame deformation (@ parking position) Shiming (@ parking

Camera frame : Key values Camera frame deformation (@ parking position) Shiming (@ parking position) Rails mounting (@ parking position) 3140 mm 800 mm > 3140 mm

Carlos Diaz’s rail system La définition de la fixation de la camera dans le

Carlos Diaz’s rail system La définition de la fixation de la camera dans le frame a convergé Carlos’ slide (Padova) 2 - Turn to clamp in desired position 1 - Turn to focus

Worries about shocks on CF parts Carbon fibers structure are very sensitive to shocks

Worries about shocks on CF parts Carbon fibers structure are very sensitive to shocks : • CF tubes are monolithic and thick : limited worry • CF ropes are 10 mm Φ and of prime importance : be careful ! • Camera frame CF skins are extremely thin : be very careful !! Extreme care & protections are needed during maintenance ! Possibilité de réaliser des test expérimentaux à l’étude actuellement

Mounting : Civil work & tooling Ø Installation procedure on site will require :

Mounting : Civil work & tooling Ø Installation procedure on site will require : crane Ø CSS elements assembly on ground crane Ø Lifting of complete CSS Ø Installation on dish Civil work to be foreseen for trestel fixation Mounting area close enough to mounted dish Indeed : crane cannot move once CSS is lifted ! LAPP is going to start studying transportation and mounting tooling end of this year 23/09/2014 Catania Meeting G. Lamanna 10

Access tower definition close enough to mounting mounted dish LAPP is going to start.

Access tower definition close enough to mounting mounted dish LAPP is going to start. Mounting studyingarea transportation and tooling end of this year Indeed : crane cannot move once CSS is lifted ! 23/09/2014 Catania Meeting G. Lamanna 11

Access tower definition 23/09/2014 Catania Meeting G. Lamanna 12

Access tower definition 23/09/2014 Catania Meeting G. Lamanna 12

Access tower definition 23/09/2014 Catania Meeting G. Lamanna 13