Cryogenic payload 1 ELi TES WP 1 Cryogenic

  • Slides: 6
Download presentation
Cryogenic payload (1) ELi. TES WP 1 (Cryogenic payload) meeting : 13 th of

Cryogenic payload (1) ELi. TES WP 1 (Cryogenic payload) meeting : 13 th of April, 25 th of May WP 2 meting (Cryogenic mirror): 2 nd of May, 15 th of June WP 3 meeting (Cooling system) : 1 st of June (1) Informal meeting : 14 th of May (GWADW, Hawaii) (2) We discuss what we do, who visit Japan, (3) and who visit from Japan. 1

First ‘quasi’ ELi. TES face to face meeting 14 May 2012 (Hawaii, GWADW 2012)

First ‘quasi’ ELi. TES face to face meeting 14 May 2012 (Hawaii, GWADW 2012) 2

Cryogenic payload (1) ELi. TES Plans on European side : [kagraj 00092] Plans on

Cryogenic payload (1) ELi. TES Plans on European side : [kagraj 00092] Plans on Japanese side must be summarized. (2)Workshop with University of Toyama 7 th of July, for new collaboration K. Yamamoto explained what we need. Details are being discussed. 3

Cryogenic payload (3) Sapphire fibers (a)IMPEX fibers with nail heads were ordered (thanks for

Cryogenic payload (3) Sapphire fibers (a)IMPEX fibers with nail heads were ordered (thanks for E. Majorana). (b)T. Ushiba is measuring thermal conductivity. (c)K. Shibata is preparing the measurement of Q-values. 4

Cryogenic payload (4) Other ideas R. De. Salvo : composite mirror suspension silicon blades,

Cryogenic payload (4) Other ideas R. De. Salvo : composite mirror suspension silicon blades, sapphire ribbon, silicon hinge W. Johnson : metal wire and sapphire ribbon (5) Digital system List of thermometers should be summarized soon. 5

Cryogenic payload (5) Measurement of vibration of radiation shield in KAGRA cryostat On next

Cryogenic payload (5) Measurement of vibration of radiation shield in KAGRA cryostat On next autumn, it will be measured. Chen Dan proceeds with the developement of (horizontal) accelerometer. Luca Naticchioni will bring his (vertical) accelerometer. He and Ettore Majorana visited Japan (23 rd-29 th April). Thanks for ELi. TES 6