Cryo VEx 2006 Lars Stenseng ph d student


















- Slides: 18
Cryo. VEx 2006 Lars Stenseng ph. d. student stenseng@space. dtu. dk
Around Greenland Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 2
Instruments in the Air Greenland OY-POF Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 3
Kangerlussuaq Laser Calibration Site Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 4
Downward Looking Camera Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 5
EGIG Line T 05 and T 12 Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 6
T 05 Corner Reflector Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 7
T 12 Corner Reflector Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 8
Austfonna Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 9
Austfonna Icecap Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 10
Kongsvegen Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 11
Devon Icecap Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 12
First Year Sea Ice North of Alert Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 13
Multi Year Ice North of Alert Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 14
ASIRAS Datation (Veit Helm, AWI) No time correction -0. 24 sec correction Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 15 Figure by V. Helm
Datation Test (YLT 2) Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 16
Datation Test (YLT 1, YLT 3, YLT 4) Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 17
ASIRAS now and in the Future • Extreme data volume in LAM mode (4. 5 Tb) ? • High tower vs. rack cabinets for aircraft installation ? • OS on ASIRAS PCs is reaching end of life ? • ASIRAS dependant on legacy GPS receiver (Trimble 4000) ? • Real time display of waveform data ? • CR positioning using geodetic quality GPS receivers Cryo. VEx 2006 | 7 th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space. dtu. dk | page 18