County of San Diego Sheriffs Department AFIS Replacement

  • Slides: 12
Download presentation
County of San Diego Sheriff’s Department AFIS Replacement Project Pre-Proposal Conference Technical Overview Presentation

County of San Diego Sheriff’s Department AFIS Replacement Project Pre-Proposal Conference Technical Overview Presentation September 15, 2009 9/15/2009 1

Presentation Contents n AFIS Replacement Rationale and Objectives n San Diego County AFIS Environment

Presentation Contents n AFIS Replacement Rationale and Objectives n San Diego County AFIS Environment n n n AFIS Technical Objectives n n Technical Architecture Innovations Expanded AFIS Functionality Significantly Improved AFIS Performance AFIS Services n n n CAL-ID Operations Participating Agencies Live. Scan Network Communications Environment System Implementation and Delivery Services System Implementation and Delivery Schedule Responding to Technical Requirements San Diego Sheriff’s AFIS Replacement 9/15/2009 2

AFIS Replacement Rationale & Objectives n n Replacement of the existing NEC AFIS is

AFIS Replacement Rationale & Objectives n n Replacement of the existing NEC AFIS is necessary: n AFIS is at end of projected 10 -year life n Reliability and maintainability are problematic n Functionality and Performance are no longer adequate Acquisition Objectives n Modernization of technologies, performance and maintainability n Enhanced efficiency and effectiveness of core identification services n Expanded identification capabilities q Palm Print Identification q Rapid-ID & Mobile-ID Capabilities n High reliability business continuity architecture n Support of forecasted and unforeseen growth requirements San Diego Sheriff’s AFIS Replacement 9/15/2009 3

San Diego County AFIS Environment n CAL-ID Operations n n n SDSD AFIS Stakeholder

San Diego County AFIS Environment n CAL-ID Operations n n n SDSD AFIS Stakeholder Agencies n n n SDSD AFIS is a component of the CAL-ID Remote Access Network (RAN) AFIS policies/procedures, system capability expansion/modernization, and user services are under the administrative control of the CAL-ID RAN Board. SDSD Crime Lab and Records Division SDSD Data Services Division Regional Crime Labs: Carlsbad PD, Chula Vista PD, El Cajon PD, Escondido PD, Oceanside PD, San Diego PD Live. Scan Network: L-1 Store & Forward System and 50+ Identix Live. Scan Workstations at SDSD and suburban agencies (see ARS Appendix 4) SDSD Network n Redundant Broadband Backbone q q n Leased Telco Circuits and Gigaman Hubs, Gigabit MPLS communications Leased point-to-point T-1, T-2 & T-3 + 1 Microwave link to regional facilities. San Diego Sheriff’s AFIS Replacement 9/15/2009 4

AFIS Replacement Scope n n Replacing: n Core NEC AFIS & DAS Archive n

AFIS Replacement Scope n n Replacing: n Core NEC AFIS & DAS Archive n Tenprint Workstations n Latent Workstations at SDSD and Regional Crime Labs Retaining existing capabilities: n Live. Scan Network (Store & Forward and 50+ Live. Scan Workstations) n Foster & Freeman Data Capture Systems (6 Crime Lab Systems) San Diego Sheriff’s AFIS Replacement 9/15/2009 5

Requirements for New System Features n Advanced identification accuracy and efficiency improvements n Palm

Requirements for New System Features n Advanced identification accuracy and efficiency improvements n Palm print automated identification and archival storage n Rapid-ID terminal support for Jail operations n Mobile-ID support for field identification San Diego Sheriff’s AFIS Replacement 9/15/2009 6

Significant Workflow and Accuracy Improvements n n n 1, 000 ppi standard for new

Significant Workflow and Accuracy Improvements n n n 1, 000 ppi standard for new image acquisition n AFIS handling and matching of 500 ppi and 1, 000 ppi images is required n Transcoding of 1, 000 ppi images to 500 ppi is required for external searches. Tenprint identification n 4 -Finger 1: N Search n 20 -Finger “Incorrect Candidate Elimination” n Lights-out performance specifications to reduce manual workload q Minimize need for manual tenprint input QC q Minimize need for manual verification of tenprint ID search results Latent Identification n No composite records: ALL original tenprint and palmprint records are searched. n Latent-to-Tenprint: Searches all 20 rolled and slap prints in every record San Diego Sheriff’s AFIS Replacement 9/15/2009 7

Advanced System Architecture Requirements n n n Business Continuity / Disaster Recovery n Redundant

Advanced System Architecture Requirements n n n Business Continuity / Disaster Recovery n Redundant Primary and Mirror systems n Real-time monitoring, automated switchover, rapid recovery technologies Secure network communications improvements n Active Directory for managing & securing user accounts, clients, servers, and applications n Strong password authentication n Capability to function with 2 -factor authentication if determined to be required, with RSA Secure Key as the 2 nd factor n Compliance with CLETS policy directives is required; Contractor is responsible for ensuring that all AFIS installations and operations obtain or support a full compliance certification Web Enabled Archive n Secure internet access to all identification records San Diego Sheriff’s AFIS Replacement 9/15/2009 8

External System Interface Requirements n CAL-DOJ AFIS n Regional AFIS Systems n n LASD,

External System Interface Requirements n CAL-DOJ AFIS n Regional AFIS Systems n n LASD, Orange County SD, Riverside County SD, San Bernardino SD, LVMPD AFIS interfaces with regional systems n SDSHERIFF Network – access to Email and Administrative Systems n Secure Database Network via an SDSD-provided web service: q Access to Wants/Warrants and criminal justice information q Export of positive ID information from Rapid-ID to SDSD JIMS n Mobile ID interface with SDSD MDC and ARJIS. n Secure web-enabled access to the new NIST Archive San Diego Sheriff’s AFIS Replacement 9/15/2009 9

Implementation Services n Turnkey System Implementation and Delivery n Contractor-supplied: n n Project Management

Implementation Services n Turnkey System Implementation and Delivery n Contractor-supplied: n n Project Management n Staffing n Schedule Performance n Reporting n Quality Control of Deliverables Government-furnished Equipment n SDSD LAN/WAN Communications Network n Pricing Option: PC Workstations, Servers and Standard Peripherals San Diego Sheriff’s AFIS Replacement 9/15/2009 10

Implementation Schedule n Selection preference will be given for the Guaranteed schedule providing the

Implementation Schedule n Selection preference will be given for the Guaranteed schedule providing the shortest time to full operational capability. n The proposed schedule must be realistic and achievable. n n Management Plan and Documentation Deliverables must be complete and subjected to internal quality control review prior to delivery. n Schedule delays resulting from premature delivery of incomplete documents are solely the responsibility of the Contractor. n System deliverable milestones (e. g. FAT) require 100% quality-assured compliance with associated requirements. Penalties may be assessed for failure to meet the guaranteed schedule. San Diego Sheriff’s AFIS Replacement 9/15/2009 11

Technical Response Guidelines n Desired solution will be 100% COTS n n n Requirements

Technical Response Guidelines n Desired solution will be 100% COTS n n n Requirements Traceability Matrix (Technical Proposal Section 4) n n n Provide a response for each numbered requirement and sub-requirement Do not provide a single response for a single summary-level requirement that has multiple sub-requirements. Response to Requirements (Technical Proposal Section 5) n n n Meet or exceed functionality requirements with only configuration adaptations Any capabilities that are new and must be developed must be identified and described. The response for most requirements can be a simple compliance statement, with illustrative information as desired by the respondent. A complete descriptive response is required for RFP requirements accompanied by Blue Italic instructions for the content of the response. Guaranteed Performance Requirements n n Selection preference will be given for guaranteed performance exceeding the minimum acceptable performance levels. Performance levels will be verified by benchmark testing during SAT. San Diego Sheriff’s AFIS Replacement 9/15/2009 12