Corrosion Coupon Racks Sales Training 2017 Introduction Overview

  • Slides: 16
Download presentation
Corrosion Coupon Racks Sales Training 2017 Introduction Overview Sales Training Receiving & Inspection Installation

Corrosion Coupon Racks Sales Training 2017 Introduction Overview Sales Training Receiving & Inspection Installation & Operation Maintenance Troubleshooting Contact Information

Introduction GTP Manufactures: Industrial Glycol Feed Packages Residential Glycol Feed Packages Bypass/Filter Feeders Corrosion

Introduction GTP Manufactures: Industrial Glycol Feed Packages Residential Glycol Feed Packages Bypass/Filter Feeders Corrosion Coupon Racks Chemical Mixers Separators & Separator Systems Poly-Cubes & Pump/Control Stations GTPConnect™ Double Wall Tanks Batch/Mix Poly Tanks & Tank Stands Custom Build Systems. General Treatment Products, Inc. is built on the ideal of providing excellent service and products to our customers while perusing and developing the industries newest products. Keeping “our pulse” on the industry and working closely with each other and our customers is instrumental to current product improvement and the development of future products. These ideals, empowered in our team, serves as the cornerstone to our success. Also ask about our distribution products such as, Walchem Metering Pumps and Controls, Sea. Metrics Flow Meters and Controls, Iwaki Mag Drive Pumps, ARO transfer pumps, Flowline Level Sensors and Controls, Ko. Flo Static Mixers, ASCO Solenoid Valves and much more. . . Home Back Next

Overview General Treatment Products bold new designed Corrosion Coupon Racks are going to raise

Overview General Treatment Products bold new designed Corrosion Coupon Racks are going to raise the bar in corrosion monitoring. With injected molded coupon holders, integral awning, catch/work shelf, tough light- weight housing and factory included mounting system, these coupon racks will be the new favorite in the industry. Features: 1 to 6 Coupon Points PVC, Carbon & Stainless Steel Piping Injection Molded Coupon Holders Integral Awning & Catch/Work Shelf Steel Safety Chain For All Models Inlet/Outlet Isolation Valves Factory Mounting System Included 2 Year Factory Warranty Options: 1" Piping Flow Indicators & Control Valves “Y” & Bowl Strainers Sample Valves Home Back Next

Sales Training Getting started, Information you will need to know to sell and quote:

Sales Training Getting started, Information you will need to know to sell and quote: (or see on-line form located on product page for more information) Need to know: Number of coupons Material of construction Line Size Temperature Pressure Options (IE: flow control valves, sample valves, bowl strainer, etc. see pricing) Or Manufacturer and Model we are bidding against. Home Back Next

Sales Training Model Number: PCR 307/FI 10 -SVB Once we have the needed information,

Sales Training Model Number: PCR 307/FI 10 -SVB Once we have the needed information, let’s work on a model number. Base Model & Material: PCR = PVC Piping CPCR = CPVC Piping CSCR = Carbon Steel Piping SSCR = Stainless Steel Piping Note: PCR & CPCR Coupon Racks have CPVC Coupon Holders. CSCR & SSCR coupon racks have PVDF Coupon Holders. Home Back Next

Sales Training Model Number: PCR 307/FI 10 -SVB Home Back Next Number of Coupons:

Sales Training Model Number: PCR 307/FI 10 -SVB Home Back Next Number of Coupons: 1 = One coupon holder 2 = Two coupon holders 3 = Three coupon Holders 4 = Four coupon holders 5 = Five coupon holders 6 = Six coupon holders

Sales Training Model Number: PCR 307/FI 10 -SVB Line Size: 07 = ¾” Piping

Sales Training Model Number: PCR 307/FI 10 -SVB Line Size: 07 = ¾” Piping 10 = 1” Piping Options: CLR = Clear piping segments SVx = Sample valves (P = PVC, B = Brass) YSx = Y-Strainer (P = PVC, CI = Cast Iron) BSP = Bowl Strainer, Polypropylene FI 10 = Flow Indicator, 0 -10 GPM FIA 10 = Flow Indicator with adjustment valve FCx = Flow Control Valve (03 = 3 GPM, 05 = 5 GPM) SFI 125 = Sight Flow Indicator, Brass, 125 PSI Home Back Next

Receiving & Inspection Housing and Backboard Coupon Holders Sample ID Tags Isolation Valves Home

Receiving & Inspection Housing and Backboard Coupon Holders Sample ID Tags Isolation Valves Home Back Next Upon receipt of order, inspect package thoroughly. In the event there was damage incurred in transit you must notify the freight company within 3 -5 days of receipt of order. Once system is inspected for damage and received in good condition, and store indoors in safe place until installing. Damaged incurred before installation is not covered under warranty.

Installation & Operation Before you get started… All fasteners and fitting should be properly

Installation & Operation Before you get started… All fasteners and fitting should be properly inspected and secured before operation as they may be loosened in transit Personnel safety practices should apply at all times Safety glasses or face shields and gloves should be worn Do not service glycol feed package with out disconnecting power Close isolation valve and release pressure before servicing any components on the system All liquids in system should be drained before servicing Glycol feed package should be installed by qualified personnel. Home Back Next

Installation & Operation Although there is no electrical, environment may change the results of

Installation & Operation Although there is no electrical, environment may change the results of the sample corrosion rate. Excessive exposure to sunlight, weather or other exposure can result in changes in corrosion rate. Wall Mount Brackets Included Once location is decided on, coupon rack need to be securely mounted to wall studs using wall mount brackets provided (pictured). Be sure that anchoring bolts comply with local building codes. It is best to run coupon rack on new systems for approximately one week. All new piping systems have residual chemicals, oils, etc. that need to be flushed out before starting sample corrosion testing. After initial flushing, close isolation valves and install corrosion samples. Before opening isolation valves and starting corrosion testing is sure to note sample material and installation date on tags provided. Home Back Next

Installation & Operation CONNECTING TO SYSTEM: Corrosion coupon racks should be installed within 10

Installation & Operation CONNECTING TO SYSTEM: Corrosion coupon racks should be installed within 10 to 30 feet of system. Flow should be from bottom to top to eliminate trapped air. Outlet Coupon rack flow should have similar characteristics as system flow rate (in feet per second). Corrosion rate can be increased by erosion. Optional flow control valves are available upon request. Inlet Home Back Next

Installation & Operation ADJUSTING THE FLOW INDICATOR The flow indictor (optional) can be adjusted

Installation & Operation ADJUSTING THE FLOW INDICATOR The flow indictor (optional) can be adjusted by regulating the inlet and outlet isolation valves. When client tampering is present, the valve handle can be removed. Flow Rate The flow indicator option may be purchased with an adjustable valve (pictured). By restricting the flow through the coupon rack the sediment/particulate in the system will not erode the sample coupon. Adjustment Knob Home Back Next

Pacific Sensor Inc. 11303 Slater Ave. Fountain Valley, CA 92708 Phone 714 -435 -0424

Pacific Sensor Inc. 11303 Slater Ave. Fountain Valley, CA 92708 Phone 714 -435 -0424 Fax 714 -435 -1344 Installation & Operation TESTING AND EVALUATION Once duration for testing has expired (determined by others) isolate coupon rack and remove samples. Included with your corrosion sample order was a evaluation test report. This report and brief test duration is all that is needed for a proper evaluation. If you no longer have the initial paperwork, please contact your source and request a copy. These coupon sample can be returned to GTP or sent directly to: Pacific Sensor Inc. 11303 Slater Ave. Fountain Valley, CA 92708 Phone 714 -435 -0424 Fax 714 -435 -1344 Metal Samples Inc. P. O. Box 8 Munford, AL 36268 Phone 256 -358 -4202 Fax 256 -358 -4515 Home Back Next

Maintenance ROUTINE MAINTENANCE Routine maintenance in this section is referred to as checking once

Maintenance ROUTINE MAINTENANCE Routine maintenance in this section is referred to as checking once a month until a maintenance schedule can be determined. All fasteners should be check for properations. Maintenance and care will depend upon the usage and environment in which the coupon rack is subject to. Once the corrosion sample has been installed, periodically check for leaks and or tampering is all that is needed. Please contact your Water Doctor or chemical supplier for Coupon Test duration and or inspection. Home Back Next

Trouble Shooting If you are having problems, contact us at repairs@gtpcompany. com, or you

Trouble Shooting If you are having problems, contact us at repairs@gtpcompany. com, or you can call us at the number on the front of the instruction manual. Home Back Next

Contact Us Mailing Address: General Treatment Products P. O. Box 8697 Brea, CA 92822

Contact Us Mailing Address: General Treatment Products P. O. Box 8697 Brea, CA 92822 -5697 Shipping Address: General Treatment Products 113 Viking Ave. Brea, CA 92821 Phone: 714) 257 -9165 FAX: 714) 257 -9215 Internet: http: //www. gtpcompany. com E-Mail: customerservice@gtpcompany. com Home Back Next