Conventional Facilities Activities SLAC November 11 2006 Acknowledgment
Conventional Facilities Activities @ SLAC November 11, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim Fred Asiri 1
Conventional Facilities Activities @ SLAC Summary of the ILC Conventional Facilities activities: • Support the CF&S Global System group effort • Developed 3 D drawings for the changes proposed to the Baseline Machine layout since Valencia – BDS for 14 mrad and Push Pull Detector – Integrated central damping with shorten single 14 mrad BDS and the associated sources • Support the Installation Global System task • Support the ILC R&D program in SLAC Fred Asiri 2
Ongoing work for discussion – Post Valencia Fred Asiri 3
Ongoing work for discussion – Post Valencia Fred Asiri 4
Ongoing work – Central Complex Fred Asiri 5
Ongoing work –Partial BDS Plan View Fred Asiri 6
Ongoing work – BDS View Fred Asiri 7
Ongoing work – Electron Source, etc Fred Asiri 8
View from ML e- End looking toward BDS Fred Asiri 9
Ongoing work- Installation – Post Valencia ~ 12. 5 Meter Main LINAC RTML e- Source e* Booster e+ keep alive Damping rings Total 1680 96 21 22 2 32 1853 Installation premise: q Transport of single Cryogenic Modules. q Tunnel sections optimized into well defined areas. q Personnel & low load traffic both directions. q Heavy load traffic restriction, one direction only. q Safety & communication systems ready to use. Cryogenic Module Installation - Project Assumptions Fred Asiri 10
Ongoing work- Installation – Post Valencia Base of Installation Model – Rate 3 Cryomodules / Day 5 7. 1 3 2 4 2. 1 4. 5 km e- LINAC Under Construction Legend 4 2 Heavy equipment staging & acces shaft 6 Small equipment & people access shafts Heavy equipment transport zone only Installation flow direction Machine installed & people activity IP 6 4. 1 4. 5 km 6. 1 2. 3 km 1 km e+ LINAC Alignment Floor drilling Support positioning Module placement & aligning Cryo connections RF connections LINAC in place 1 2 3 4 5 6 1 km Installation zone 6 Weeks of installation work 90 Modules in progress Installation Sequence Fred Asiri 11
Ongoing work- Installation – Post Valencia Joint Occupancy (T 3) Start of Construction (T 0) Fred Asiri Installation Plan 12
- Slides: 12