Construction Site today Construction Site – current Google Maps View Short Status of FAIR

Construction Site today Construction Site – current Google Maps View Short Status of FAIR for Nu. PECC /KP 1 4

FAIR @ Darmstadt Construction in Modules Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics

FAIR @ Darmstadt Construction in Modules Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored and cooled 14 Ge. V/c anti-protons) UNIL A p-Linac SIS 18 C QCD-Phase Diagram (HI beams 2 to 45 Ge. V/u) HESR Materials Science & Radiation Biology (Ion & antiproton beams) Short Status of FAIR for Nu. PECC /KP Module 1: Experimental areas Rare-Isotope Production Target Module 2: Super-FRS Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Module 0: SIS 100/300 SIS 100 and connection to existing accelerators Anti-Proton Module 3: Production Target High-energy p (p-linac, p, CR, HESR) CR & RESR Cryring NESR 100 m Accelerator Physics 2

FAIR Experiments in all 4 scientific core activities CBM APPA Super. FRS PANDA Short

FAIR Experiments in all 4 scientific core activities CBM APPA Super. FRS PANDA Short Status of FAIR for Nu. PECC /KP Nu. STAR 3

Planning Activities Short Status of FAIR for Nu. PECC /KP 4

Planning Activities Short Status of FAIR for Nu. PECC /KP 4

Civil Engineering New Beamline: ∑ 3. 2 km thereof Syncrotron: 1. 1 km Existing:

Civil Engineering New Beamline: ∑ 3. 2 km thereof Syncrotron: 1. 1 km Existing: SIS 18 600. 000 cbm > 1 Mio tons of concrete 35. 000 tons of steel Short Status of FAIR for Nu. PECC /KP 5

status of piling works • piling to date: well ahead of schedule • goal: