Construction Claims By Raya Jaber Tasnim Bany Jaber
Construction Claims By Raya Jaber Tasnim Bany Jaber Tala Aydi Supervisor: Eng. Mohammad abu neama
Outline Introduction Definition Methods to resolve construction claims Objectives Statement of the problem Methodology Data analysis Conclusion Recommendation
Introduction Managing standards construction and projects specifications with plays a fundamental role in construction projects. Expectations of parties may be disappointing and disputes may arise at any time between the first bid and the last bill of the project.
Definition construction claims are defined as a request from one party to another for adjustment because of change under the contract terms. Parties involved in construction claims are, owner, contractor and designer.
Resolve Construction Claims
Statement of the problem Construction projects in Palestine suffer from many problems, which result in extension beyond budget and time. Because of these problems, construction claims occur. In this project, an identification of the most important causes of construction claims were determined in order to avoid them.
Project objectives • Determination of the impact of claims on construction which are time, cost and quality in Palestine. • Identification of the party that is responsible for each cause. • Identification the most important causes of issuing construction claims in Palestine.
Methodology
Data Analysis In order to achieve the project objectives, data was collected analyzed using likert scale and Microsoft Office Excel.
Questionnaire • Questionnaire template was prepared as a part of this research and distributed over two parties, owner and contractor. • The questionnaire consists of three sections, each section aims to gather different information.
Questionnaire • Pilot test It is a preliminary study conducted in order to evaluate questionnaire template to get a final, error-free, and clear template. • Ways to send questionnaires 1. E-mail. 2. Transmission by hand.
Contractors’ sample Data was analyzed from each party’s point of view From this figure, it is shown that only 58% of respondent have responded. 42% Respondet Not respondent 58%
Work experience Because of high level of experience it is expected that the data will be more accurate and reliable.
Classification of contractor company 50 Most of contractors companies in Nablus are classified from first to third degree 46 45 40 35 33 30 25 21 20 15 10 5 0 0 classification class 1 class of 2 0 the class company percentage 3 class 4 class 5
Average number of issuing 40 35 35 30 25 20 24 24 18 15 10 5 0 Percent of issuing claims over the last years less than 5 years (5 -10) year ( 10 -20) year more 5 than 20 years
Impact of issuing claims on the project ts ts ts jec oje c of p et as re Inc De cre as et he qu a ali ty lity st o of f th pr ep ro 8 ro jec ts oje c pr st re the ase ow in t ne he co r de to crea the se ow in ne the r co of the ate nd to delay in completion Inc the second impact is tio greatest impact, and mp le the co has the owner 25 in of the project to the 33 de lay Increase in the cost 50 46 50 45 40 35 30 25 20 15 10 5 0 the project. Impact of issuing claims on the project
common way to solve claims Negotiation method 79 80 58 60 40 cheap and saves 20 17 17 common way to solve construction disputes n tio ga liti rb it n. A tio dia Me Ar bit ra tio n n tio dia Me go tia tio n 0 Ne time. ra tio n is considered as a 46
Identifying the responsible for each cause • Data was analyzed and each cause was allocated for the party who is responsible for it. • In this part of questionnaire, the weighted stake (measured by no. of ticks) of each cause was calculated and allocation made to the party with the highest weight that is
Causes of claims and the degree of occurrence
Causes of claims and the degree of occurrence cont.
Causes of claims and the degree of occurrence cont
Conclusion • In conclusion, there is a significant difference perspectives between both owner and contractor. • This is because an owner expects that the project will be completed within its established schedule and within its cost.
Conclusion • However, a contractor try to complete the project though there is always a probability of obstacles facing any project naturally.
Recommendation Detailed drawing Private conditions General conditions The designer should prepare Bill of quantities specifications
Recommendation • Employ qualified engineers • Give authority to approve the drawings and samples. • Make sure that the fund is available
Permits Budget License Tender is ready Detailed drawings Approvals required
Recommendation • Check all site conditions, especially the soil reports. • Make sure that the specification of materials that needed are clear • Clear bill of quantities and specification.
Hope you enjoy our presentation, and if you have any questions, please don't hesitate
- Slides: 29