CONNECTING YOU TO THE AUTHORITATIVE GEOINFORMATION FRAMEWORK FOR
- Slides: 27
CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE www. eurogeographics. org The European Location Framework for Geostastics Mick Cory Euro. Geographics Secretary General & Executive Director 11 th November 2015 Copyright © 2013 Euro. Geographics
Raw Data • Containing the number of deaths from cholera registered in the four weeks ending 5 th August 1854, together with the supply of water in the houses in which the fatal attacks took place, in all the sub-districts to which the water suply of either the Southwark and Vauxhall or the Lambeth Company extends. . The registers of deaths are copied from the Weekly Returs of the Register General. ST. SAVIOUR, SOUTHWARK. Christchurch. At 34, Charlotte Street, on 29 th July, a stock-maker, aged 29, "Asiatic cholera 18 hours" Lambeth. At 45, Gravel Lane, on 1 st August, the widow of a farmer, aged 48, "cholera 12 hours". Southwark &Vauxhall. At 1, Alpha Place, on 1 st August, a barrister’s clerk, aged 57, "cholera 24 hours". Southwark &Vauxhall. ST. SAVIOUR, SOUTHWARK, St. Saviour. At 1, Park Street, on 25 th July, the wife of a labourer, aged 35, "Asiatic cholera 14 ½ hours". Southwark & Vauxhall. At 40, Bankside, on 25 th July, the son of a locksmith, aged 5 years, "cholera 12 hours". Southwark & Vauxhall. At same house, on 26 th July, the daughter of a locksmith, aged 9 yrs. , "cholera 12 hours". Southwark & Vauxhall. At same house, on 28 th July, the daughter of a locksmith, aged 13 yrs. , "cholera 12 hours". Southwark & Vauxhall. At 97, Bridge Road, on 28 th July, a hatter, aged 36, "Asiatic cholera 24 hours" Southwark & Vauxhall. At 49, Great Guildford Street, on 29 th July, a coalporter, aged 44, "cholera 12 hours". Southwark & Vauxhall. At 20, Zoar Street, on 31 st July, a female, formerly a domestic servant, aged 79, "diarrhea 2 days, cholera 12 hours" Southwark & Vauxhall. At 22, America Street, on Aug. 1, the wife of an enginedriver, aged 38, "cholera 12 hours". Southwark &Vauxhall. At 5, Pleasant Place, August 1, the daughter of a coalporter, aged 5 years, "Asiatic cholera 13 hours". Southwark & Vauxhall. At 10, Castle Street, on 1 st August, the son of an engineer, aged 7 years, "cholera 12 hours". Southwark & Vauxhall. At 36, New Park Street, on 1 st August, the son of an artist, aged 2 years, "Asiatic cholera 10 ½ hours". Thames water from the tank of a saw-mill. At 54 ½ , Great Guildford St. , on 2 nd August, a labourer aged 51, "Asiatic cholera 47 hours". Southwark and Vauxhall. At the same house, same day, the wife of a labourer, aged 48, "Asiatic cholera 12 ½ hours". Southwark & Vauxhall. At 2, Emerson Place, on 3 rd August, the wife of an engineer, aged 30, "cholera 2 days". Southwark and Vauxhall. At 29, Norfolk St. , on 2 nd August, the son of a labourer, aged 3 years, "Asiatic cholera 12 ½ hours". Southwark and Vauxhall. At 68, Great Guildford St. , on 3 rd August, the widow of a labourer, aged 40, "cholera 19 hours". Southwark and Vauxhall. At 10, Castle Street, on 3 rd August, the daughter of a labourer, aged 4 years, "cholera 12 hours". Southwark and Vauxhall. At White Hart Inn Yard, on 3 rd August, the wife of a porter, aged 49, "cholera 14 hours". Southwark and Vauxhall. At 22, America Street, on 3 rd August, an engine driver, aged 35, "cholera 9 hours". Southwark and Vauxhall. At 15, Essex Street, on 4 th August, a packer, aged 65, "diarrhea 4 days, cholera 11 hours". Southwark and Vauxhall. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Number Street Date Occupation Age Cause of Death At 34 Charlotte Street on 29 th July a stock-maker aged 29 At 45 Gravel Lane on 1 st August the widow of a farmer aged 48 At 1 Alpha Place on 1 st August a barrister’s clerk aged 57 At 1 Park Street on 25 th July the wife of a labourer aged 35 At 40 Bankside on 25 th July the son of a locksmith aged 5 years At same house on 26 th July aged 9 yrs. At same house on 28 th July "Asiatic cholera 18 hours" Lambeth. "cholera 12 hours". Southwark &Vauxhall. "cholera 24 hours". Southwark &Vauxhall” "Asiatic cholera 14 ½ hours". Southwark & Vauxhall. "cholera 12 hours". Southwark & Vauxhall "Asiatic cholera 24 hours" Southwark & Vauxhall. "cholera 12 hours". Southwark & Vauxhall. diarrhea 2 days cholera 12 hours" Southwark & Vauxhall. "cholera 12 hours". Southwark &Vauxhall. "Asiatic cholera 13 hours". Southwark & Vauxhall. "cholera 12 hours". Southwark & Vauxhall. "Asiatic cholera 10 ½ hours". Thames water from the tank of a saw-mill. At 97 Bridge Road on 28 th July the daughter of a locksmith a hatter At 49 Great Guildford Street on 29 th July a coalporter aged 44 At 20 Zoar Street on 31 st July a female formerly a domestic servant aged 79 At 22 America Street on Aug. 1 aged 38 At 5 Pleasant Place August 1 At 10 Castle Street on 1 st August the wife of an enginedriver the daughter of a coalporter the son of an engineer At 36 New Park Street on 1 st August the son of an artist aged 2 years At 54 ½ Great Guildford St. on 2 nd August a labourer aged 51 At the same house same day the wife of a labourer aged 48 At 2 Emerson Place on 3 rd August the wife of an engineer "Asiatic cholera 47 hours". Southwark and Vauxhall. "Asiatic cholera 12 ½ hours". Southwark & Vauxhall. aged 30 At 29 Norfolk St. on 2 nd August the son of a labourer aged 3 years At 68 Great Guildford FRAMEWORK FORSt. EUROPE on 3 rd August the widow of a labourer aged 40 CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION aged 13 yrs. aged 36 aged 5 years aged 7 years "cholera 2 days". Southwark and Vauxhall. "Asiatic cholera 12 ½ hours". Southwark and Vauxhall. "cholera 19 hours". Southwark and Vauxhall.
Extent of outbreak Water Pump E Map of Cholera deaths, London 1854, by Dr John Snow CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Children Deaths <5 due to diarrhoeal disease Source: http: //www. statsilk. com/ Developed by Frank van Cappelle, 1 st place winner of the World Bank's Apps for Development competition. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Children Deaths <5 due to HIV/ AIDS Source: http: //www. statsilk. com/ Developed by Frank van Cappelle, 1 st place winner of the World Bank's Apps for Development competition. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Children Deaths <5 due to Malaria Source: http: //www. statsilk. com/ Developed by Frank van Cappelle, 1 st place winner of the World Bank's Apps for Development competition. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
2030 Agenda for Sustainable Development 17 Goals. 169 targets Adopted by the General Assembly on 25 September 2015 CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
2030 UN Sustainable Goals The spatial dimension • SDG 17 Target 18 – By 2020, enhance capacity-building support to developing countries, – increase significantly the availability of high-quality, timely and reliable data – Including income, gender, age, race, ethnicity, migratory status, disability, geographic location • Follow-up and review processes set certain principles They will be rigorous and based on evidence; informed by country-led evaluations and data; Data will be high-quality, accessible, timely, reliable, and includes income, sex, age, race, ethnicity, migration status, disability and geographic location. – Encourages the contribution to be made by a wide range of data, including earth observation and geospatial information. – – • CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
More than 60 have a spatial dimension Source: Marcel Jortay, Director for Regional and Sectoral Statistics, Eurostat, European Commission UN-GGIM: Europe plenary 2015, 7 October 2015, Belgrade, Serbia CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Measuring progress Follow-up and review • Each target should be measured; • Operating at the national, regional and global levels • Based on a core set of global indicators; • Complemented by indicators at the regional and national levels which will be developed by Member States; • Harmonised to common global standards; • Predominantly taken from official data; • Applicable to all countries; • Applies equally to geographic information. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
This requires collaboration: Regional level • Follow-up and review at the regional and subregional levels provides – useful opportunities for peer learning, – sharing of best practices and – discussion on shared targets. • cooperation of regional and subregional commissions and organization encouraged. • Inclusive regional processes will draw on national-level reviews and contribute to follow-up and review at the global level; • Member States encouraged to identify the most suitable regional forum in which to engage, building on existing mechanisms; • United Nations regional commissions are encouraged to continue supporting Member States in this regard. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Copyright © 2013 Euro. Geographics
Geospatial / Statistical initiatives • UN-GGIM • Expert Group on the integration of Statistical and Geospatial Information • UN-GGIM: Europe – Working Group A - Core Data on a regional scale in Europe. Fundamental geospatial datasets at a global level will provide a valuable basis for the managing, monitoring and reporting of SGDs – Working Group B - integration of statistical information with geographic information, adding value to statistical data. • EFGS – ESSnet GEOSTAT 2 (2015 -2017) – Feeds into UN-GGIM work – Includes aim to better involve national mapping and cadastral agencies, or other geospatial stakeholders in charge of geocoded registers, into the network of the EFGS. • Joint UN-GGIM: Europe - ESS Meeting was hosted by Eurostat in Luxembourg on the 3 rd March 2015 CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Foreign Citizens by NUTS level 3 region, 2011 Source: http: //ec. europa. eu/eurostat/statistical-atlas/gis/viewer/# Administrative boundaries by Euro. Geographics – Euro. Boundary. Map. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Second homes, England Wales, 2011 Source: ONS Interactive Maps, http: //www. ons. gov. uk/ons/interactive/index. html#Census CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
UK Review of 2011 Census 1 • B 3: ONS …. should also explore how to maximise quality through the use of the address register in the context of multi-mode data collection. • An address register is fundamental to managing both the 2021 Census in providing a frame for delivering internet access codes and managing response. • It will also be vital to the increased use of administrative data and surveys in enhancing statistics from the 2021 Census and improving statistics between censuses. • ONS working closely with NMCA for Great Britain (Ordnance Survey) 1. Beyond 2011: Independent Review of Methodology, ONS response CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
• Good start, but need to engender closer cooperation; • Strategic partnership required between NSI and NMCAs; • NMCAs and NSIs are responsible for delivering public value; • We have the common goal of producing authoritative, high quality information for the public use and for policy makers; • NSI and NMCAs are therefore natural partners; • UN-GGIM: Europe is the opportunity to give direction to this common goal; • Euro. Geographics, on behalf of its members the NMCAs of Europe, are ready to play its part in doing this. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Euro. Geographics • Not-for-profit Association of National Mapping and Cadastral Authorities • 60 members in 46 countries • Purpose To further the development of the European Spatial Data Infrastructure through collaboration in the area of geographic information, and the representation of the Euro. Geographics’ membership and its capabilities. • Vision A European society which makes decisions informed by our members’ accurate, authoritative and quality-assured land geo-information data, services and expertise. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Statistical community Requirements from NMCAs • Fundamental geospatial data for statistical purposes; • Single points of contacts for authoritative geospatial data; • More Open Data; • Improved conditions for access and use; • European and national Statistical-Spatial Frameworks and comprehensive geocoding of all administrative data. Source - Marcel Jortay, Director for Regional and Sectoral Statistics, Eurostat, European Commission. UN-GGIM: Europe plenary 2015, 7 October 2015, Belgrade, Serbia CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
What is it? • An information system to find, view, download, or use geographic information for visualization, analysis and dissemination; • A gateway to pan-European maps, geographic and land information: – bringing together geospatial information from different agencies and different countries; • Not just maps – maps, geographic and land information; • And geospatial tools, for example – To edgematch, – To visualise statistical data (Table Joining Service); • It is a practical implementation of the INSPIRE Directive; CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
What will it provide? • Complete, reliable, updated and harmonised maps, geographic and land information for Europe; • Single source of authoritative content • Quality Assurance • Up to date • Standard data specifications; • Greater certainty of long-term commitment to supply; • Viable alternative to commercial providers CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Timescale ELF Project Consortium 2013 Project start 2015 March 2016 • Beta test • Road show • Awards CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE 2016 European Location Services 2018 Provided by Euro. Geographics Oct 2016 – 2018 • Assumed • Operational? Project end • Transition phase begins
Potential • To reduce costs by making datasets consistent across Europe: – between themes and across multiple geographical areas – with INSPIRE requirements • Take less time to discover data sources; • And less time acquiring data from multiple sources – Simplified pricing and licensing – One-stop shop CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Conclusions • Maps and Statistics are complementary – together they add greater public value; • NSI and NMCAs working together can offer much to the world (i. e. 2030 Sustainable Development Goals); • Euro. Geographics has a role to facilitate cooperation; • European Location Framework offers potential for the statistical community, and much wider. CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
Thank you www. eurogeographics. org http: //www. elfproject. eu CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE
- Authoritative sources in a hyperlinked environment
- Most authoritative dictionary
- Communating
- Likert leadership theory
- Authoritative teacher
- Authoritative style of leadership
- Kontinuitetshantering i praktiken
- Typiska novell drag
- Tack för att ni lyssnade bild
- Vad står k.r.å.k.a.n för
- Varför kallas perioden 1918-1939 för mellankrigstiden?
- En lathund för arbete med kontinuitetshantering
- Personalliggare bygg undantag
- Tidböcker
- A gastrica
- Densitet vatten
- Datorkunskap för nybörjare
- Tack för att ni lyssnade bild
- Hur skriver man en tes
- Autokratiskt ledarskap
- Nyckelkompetenser för livslångt lärande
- Påbyggnader för flakfordon
- Formel för lufttryck
- Offentlig förvaltning
- Jag har gått inunder stjärnor text
- Presentera för publik crossboss
- Jiddisch
- Bat mitza