Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering
The Flow-Down Process ATST Science Requirements Design Requirements
The Flow-Down Process ATST Science Requirements Functional and Performance Requirements Strawman Concepts Design Requirements
Getting to a Concept – Input Obvious Constraints Experience with Similar Telescopes Engineering Analysis Work Shops Strawman Concepts Funded Studies Trade Studies Baseline Telescope Concept
Getting to a Concept – Ideas
Testing the Concept Performance Evaluation Error Budgets Science Requirements Design and Development of Systems and Subsystems Strawman Concept Sub-System Specs, Design Requirements No OK? (Co. DR) Cost Evaluation Yes PDR Phase Conceptual Design Review: • What passes this test? • What work remains?
Some Hard Constraints from the SRD • Resolution, photon flux and sensitivity require a four-meter class telescope. • Resolution requirement also leads to a high-order adaptive optics system. • Wavelength coverage from 0. 3 to 28 m leads to an allreflecting telescope.
Some Challenging Requirements • Resolution Requirement (Image Quality) – Even with a 4 -meter aperture, a world-class site, high-order AO system, this remains challenging. • Stray Light Requirement (Coronal Observations) • Polarization Requirement (Polarimetry)
Design Requirements Documents • M 1 Mirror Assembly – SPEC-0007 (Ron Price) • M 2 Mirror Assembly – SPEC-0008 (Ron Price) • Enclosure – SPEC-0010 (Mark Warner) • Telescope Mount Assembly – SPEC-0011 (Mark Warner)
The Systems Approach The diverse and sometimes competing requirements placed on ATST forces a rigorous and aggressive systems approach during all phases of the project.
ATST Systems Orientation
Responsibilities of Systems Engineering • • • Design Requirements Flow Down Document and Drawing Control Interface Control Error Budgets Standards End-to-End Modeling Quality Assurance Plan Acceptance Test Plans Integration Plan
Responsibilities of Systems Engineering – Co. DR Emphasis ü • • Design Requirements Flow Down Document and Drawing Control Interface Control Error Budgets Standards End-to-End Modeling Quality Assurance Plan Acceptance Test Plans Integration Plan
Systems Overview • Telescope Systems and Subsystems Definition • Interface Control and the N 2 Diagram • Documentation Control • Error Budgets – Top Down • Error Budgets – Bottom Up
Glossary and Acronym List
Document and Drawing Control
Interface Control and the N 2 Diagram
N 2 Diagram Detail
Top Level Systems • • 1. 0 2. 0 3. 0 4. 0 Telescope Assembly Adaptive Optics Instrument Systems High-Level Controls and Software • 5. 0 Enclosure • 6. 0 Support Facility and Buildings
Telescope Assembly Subsystems • • • 1. 1 1. 2 1. 3 1. 4 1. 5 1. 6 Telescope Mount Assembly M 1 Assembly M 2 Assembly Feed Optics Thermal Systems Scattered Light Control Probably specific to D&D Phase. Likely to be reabsorbed later.
- Conceptual design review template
- Conceptual design review
- 3 point perspective stairs
- Silo perspective vs business process perspective
- Conceptual design vs physical design
- System requirements review
- Independent review requirements
- Bow wave aircraft
- Perspektif sistem dalam organisasi
- Hình ảnh bộ gõ cơ thể búng tay
- Bổ thể
- Tỉ lệ cơ thể trẻ em
- Chó sói
- Tư thế worm breton là gì
- Alleluia hat len nguoi oi
- Các môn thể thao bắt đầu bằng tiếng đua
- Thế nào là hệ số cao nhất
- Các châu lục và đại dương trên thế giới
- Công thức tính độ biến thiên đông lượng
- Trời xanh đây là của chúng ta thể thơ