Components of Culture Culture a societys groups system




















































- Slides: 52
Components of Culture Ø Culture: a society’s (group’s) system of shared, learned values and norms; these are the society’s (group’s) design for living n Values: abstract ideas about the good, the right, the desirable n Norms: social rules and guidelines; guide appropriate behavior for specific situations § Folkways: norms of little moral significance dress code; table manners; timeliness § Mores: norms central to functioning of social life n bring serious retribution: thievery, adultery, alcohol
Components of Culture n Symbols n n Language n n A set of symbols that expresses ideas and enable people to think and communicate with one another Values n n Anything that meaningfully represents something else Collective ideas about what is right or wrong, good or bad, and desirable or undesirable in a particular culture Norms n Established rules of behavior or standards of conduct
Values - ideals or beliefs that guide the way people live
Values are collective concepts of what is considered good, desirable, and proper-or bad, undesirable, and improper- in a culture n Values indicate what people find important and morally right (or wrong) n Values influence people's behavior and serve as criteria for evaluation the actions of others n
Values determine for us what is desirable in our life; n If we learn other people’s values we learn about other people; n Values underlie our preferences, our choices, indicate what we deem as worthwhile in our society. n
Cultural Diversity Ø Values represent personal or socially preferable modes of conduct or states of existence that are enduring. Why doesn’t Mc. Donald’s sell hamburgers in India?
Americans traditionally prized success through individual effort and initiative, Japanese emphasize collectivism and loyalty to the company
What is culture? Standard 10. 1 n Values comprise ideas about what in life seems important. (Fast write) What are the Values in the United States and why?
An overview of U. S. Values made by sociologists Robin Williams (1965) n n n n Achievement and success Individualism Activity and work Efficiency and practicality Material comfort Freedom Democracy Equality
Components of Culture: Norms n n Norms are specific to a culture, time period, and situation. Norms can be either formal, such as a law (a common type of formally defined norm that provides an explicit statement about what is permissible and what is illegal in a society) or the rules for playing soccer, or informal, which are not written down and are unspoken. Introduction to Sociology: Culture 10
Norms n Norms are established standards of behavior maintained by a society n Formal norms have been written down and involve strict rules or punishment of violators (Law is the “body of rules , made by government for society, interpreted by courts, and backed by the power of the state” (Wise, 1993)
Norms Informal norms are generally understood but are not precisely recorded n Examples: standards of proper dress or proper behavior at school n
According to the informal norms of culture of the mountainous Asian kingdom of Bhutan, people greet each other by extending their tongues and hands
What is culture? Standard 10. 1 Norms consist of expectations of how people will behave in various situations. (Fast write) What are the norms in the United states? n
Components of Culture: Norms n n Types of norms can also be distinguished by the strictness with which they are enforced. A folkway is a loosely enforced norm that involves common customs, practices, or procedures that ensure smooth social interaction and acceptance. Introduction to Sociology: Culture 15
Types of Norms (according to their relative importance to society) n n Folkways are norms governing everyday behavior whose violation might cause a dirty look, rolled eyes, or disapproving comment Example: Walking up a “down” escalator in a department store challenges our standards of appropriate behavior
Folkways n n n Less important rules of society Violation of rules hurts nobody except the person breaking the rule Usually a violation of etiquette or habits not acceptable to society Violators are usually ridiculed/made fun of or people avoid them Manners not followed
Types of Norms n n Folkways: These are norms that are not strictly enforced, we expect people to comply, but if they don’t we don’t make a big deal about it. Situational: Walking on one side of the sidewalk, going up and down stairs, elevator behavior Customs, habits, commonly accepted practices
Types of Norms n n Folkways: Usually involve unimportant matters: table manners, accepting your place in line rather than cutting ahead, wearing appropriate clothing. Few restrictions, and mild sanctions.
Cultural Diversity Ø Customs are norms and expectations about the way people do things in a specific country. Why were 3 M executives perplexed concerning lukewarm sales of Scotch-Brite floor cleaner in the Philippines?
Types of Norms n n n Mores: Means “manners” in French. Mores are norms that are essential to American Values, close to legalistic. Attitudes from the past, habituated, very little deviation allowed Duties, obligations, common to cultural morality
Types of Norms (according to their relative importance to society) Mores are norms deemed highly necessary to the welfare of a society, often because they embody the most cherished principles of people n Each society demands obedience to its mores (violation can lead to severe penalties n Examples: murder, child abuse n
Mos, Mores • • (Latin) Tradition or custom Moral attitudes Manners , ways (Thesaurus) socially correct behavior : decorum, etiquette, good form, manner • This often serve as moral guidelines for acceptable behavior but are not necessarily religion or ethics • (Science Dictionary) the custom and manners of a social group and cultures
Types of Norms n n Mores: The fundamental ideas about what is right/wrong, virtuous and sinful. Important because they involve moral vision based on social cohesion, continuity, and community in human life. Mores eventually become LAWS. Part of social life, not changing.
Mores n n Strict enforcement, and insistence on conformity, we learn through socialization via our institutions in society. Examples: “prescribed” gender roles; Americans eat beef, not horse, dog, cat; you do not expose your genitals in public
Components of Culture: Norms n n A more (more-ray) is a norm that carries greater moral significance, is closely related to the core values of a group, and often involves severe repercussions for violators. A taboo is a norm engrained so deeply that even thinking about violating it evokes strong feelings of disgust, horror, or revulsion for most people. Introduction to Sociology: Culture 26
In traditional Ethics, the word “custom” mean more or less permanent moral behavior in accordance with the precepts of the natural moral law which is universally known and common to all men and women. Such are the customs of telling the truth, of paying debts, honoring one’s parents and respecting life and property of others.
Sociologists Ian Robertson illustrated the difference between Folkways and Mores: “A man who walks down a street wearing nothing on the upper half of his body is violating a folkway; a man is wearing nothing on the lower half of his body is violating one of mores (requirement that people cover their genitals and buttocks in public “(1987)
Types of Norms (according to their relative importance to society) Taboos are norms that are so deeply held that even the thought of violating them upset people n In the U. S. There is a taboo against eating human flesh n
Taboo A taboo is a norm so strongly ingrained that to violate it creates disgust, revulsion, horror - the thought of it makes people sick: n Eating human flesh - cannibalism n Incest - having sex with relatives n Pedophilia - adults having sex with children n
Taboo a very extreme more in a society n proscription n almost unthinkable it is so unacceptable to people n people do not like to acknowledge that it can occur in their society n people are usually executed or given long prison sentences for violations n
LAWS Norms which have been formalized n written down by legislature or courts n punishment told before hand n can be based on folkway or more n can be code of law not based on folkway or more n folkways tough to enforce of all laws n
Law Laws are norms with strict and formal sanctions, punishments - to violate a law is to violate society itself. n Codified, and enforcement is reserved for those in positions of authority. n Formal legal codes are necessary to manage relationships in interdependent, self interested, contractual societies. n
Sanctions are penalties and rewards for conduct concerning a social norm n Conformity to a norm can lead to positive sanctions such as pay raise, a medal, a word of gratitude, or a pat on a back n
Social Control and Sanctions n n 35 Sanctions are positive or negative reactions to the ways that people follow or disobey norms, including rewards for conformity and punishments for norm violators. Sanctions help to establish social control, the formal and informal mechanisms used to increase conformity to values and norms and thus increase social cohesion. Introduction to Sociology: Culture
Norms and Sanctions NORMS Formal Informal SANCTIONS POSITIVE NEGATIVE Salary bonus Fine Medal Jail sentence Diploma Execution Testimonial dinner Expulsion Smile Frown Compliment Humiliation Cheers Ostracism
What is culture? Standard 10. 1 n Institutions are the structures of a society within which values and norms are transmitted. Fast write) What institution do you go to daily and show values and social norms?
What is culture? Standard 10. 1 n Artifacts—things, or aspects of material culture derive from a culture's values and norms. Fast write) What artifact in your life describes you?
Cultural Shock n n n “Culture becomes the lens through which we perceive and evaluate what is going around us” We have expectations of “the way people ought to be” Cultural shock- is the disorientation that people experience when they come in contact with a fundamentally different culture and can no longer depend on their taken-for-granted assumptions about life
Segments of the populations of Australia, Asia, and Africa consume protein-rich insects. In the photograph, a woman enjoys a dry-roasted insect
An American tourist who goes out to dinner in Seoul, Korea and learns that a local specialty is dog meat might well experience cultural shock
Attitudes toward Cultural Variation Ethnocentrism is a tendency to evaluate and judge the customs and traditions of others according to one’s own cultural tastes, beliefs, and standards n We learn that the ways of our own group are good, right, proper, and superior to other ways n
Subservience to Males? Moral Depravity?
Ethnocentrism Has both positive and negative consequences n On the positive side, it creates in-group loyalty n On the negative side, ethnocentrism can lead to harmful discrimination against people whose ways differ from ours n
AIM: How does culture influence peoples’ lives? Do now: Identify one thing that represents your culture. Example: American culture - baseball HW – Pick five artifacts in your home, describe the item, and describe why it is important to your culture?
*NOTES* WHAT IS CULTURE? ? ? (1) The unique way in which a group of people live (2) Generally refers to the patterns of human activity (3) "The total, generally organized way of life, including values, norms, institutions, and artifacts, that is passed on from generation to generation by learning alone"
WHY IS CULTURE SOMETIMES COMPARED TO AN ICEBERG? 1. Facial expressions 2. Religious beliefs YOU CAN SEE 3. Foods 4. Eating habits 5. Paintings YOU CAN’T SEE 6. Concept of self 7. Work ethic 8. Styles of dress 9. Literature 10. Concept of fairness 11. Childraising beliefs
Whose culture is being identified in the following images? ? ? : writing Architecture/ religion Art clothing Art/mythology food What elements of culture do we see in these images?
Whose culture is identified in these images? TAPAS/ FOOD ARCHITECTURE DANCE/ CLOTHING SPORTS/ GAMES ARCHITECTURE
*NOTES* Cultural diffusion- the exchanging of ideas from one culture to another usually done through trade and warfare Example: baseball in Japan Cultural Assimilation- taking elements of one’s culture and making it your own (absorbing into a new culture)
At the end of your notes in your graphic organizer, answer ONE of the following questions. Everyone has a culture. It shapes how we see the world, ourselves, and others. 1. How does my culture shape me? 2. How does culture shape the way we see ourselves, others, and the world? 3. Why is it important to understand culture?