COMPASS in 2013 Bochum, Bonn (ISKP & PI), Erlangen, Freiburg, Mainz, München TU Dubna (LPP and LNP), Moscow (INR, LPI, State University), Protvino CERN Warsaw (NCBJ), Warsaw (TU) Warsaw (U) USA (UIUC) Yamagata Prag (CU/CTU) Liberec (TU) Brno (ISI-ASCR) Saclay (CEA-DSM) Lisboa/Aveiro Torino (University, INFN), Trieste (University, INFN) Calcutta (Matrivian) Tel Aviv Taipei (AS) New groups since 2012: USA-IUIC, Taipei-AS & Portugal-Aveiro COMPASS FRC – November 29, 2013 2
COMPASS Collaboration in 2013 12 Countries + CERN 23 institutes 217 Members: 141 paying members 43 Ph. D students 24 Diploma students 7 Rotation JINR 2 Exceptions COMPASS FRC – November 29, 2013 3
COMPASS – phase II Schedule of program approved by Research Board : 2012 Primakoff run p. Ag DVCS run mp mpg 2013 2014 Oct. 15 -Dec. 15: Drell-Yan test (Magnet – Polarized target - Absorber) 2015 Polarized Drell-Yan p p mm. X 2016 DVCS 2017 DVCS mp mpg “ “ COMPASS FRC – November 29, 2013 4
Mo. U • was agreed upon at the last FRC meeting, dec. 2012 • signed by CERN Directorate S. B. in February 2013 • sent for signature to funding agencies in February 2013 • already signed by: Czech Republic Japan Russia-JINR Italy Poland USA • not yet signed by: France-CEA Portugal-FTP Germany-BMBF Russia (for Protvino IHEP) COMPASS FRC – November 29, 2013 5
Mo. U – Signatures of funding agencies Table as of July 2013 COMPASS FRC – November 29, 2013 6
Costs planning Changes versus original tables in Mo. U: - US: Only one drift chamber is funded, instead of two. Part of existing straws will be kept. This is fine for 2014 -2015. - Germany : 57 k. CHF for the ECAL 1 upgrade were paid from the Collaboration funds, and consequently are removed from the German contribution (see Table Sub-detector B, Mo. U page 30) Spending profile unchanged COMPASS FRC – November 29, 2013 7
Technical Coordinator The Collaboration Board has identified a candidate, J. Bernhard, and proposed him to CERN, for the role of Technical Coordinator. J. B. would be ready to start the job by March 1 st, 2014. We are confident that the issue is close to be solved. This is an important step for the forthcoming installations and runs. COMPASS FRC – November 29, 2013 8
Plans during the shutdown Preparation of the 2014 run (Polarized Drell-Yan) - Magnet repair and instrumentation Displacement of Polarized target by 2. 3 m Insertion of Drell-Yan absorber New Drift Chamber DC 5 Everything on track We thank the funding agencies for funding on time COMPASS phase-II COMPASS FRC – November 29, 2013 9
Further constructions for 2016 • ECAL 0 calorimeter for DVCS run in 2016 • Rest of DVCS setup as in 2012, including long LH 2 target COMPASS FRC – November 29, 2013 10
Publications in 2013 • Leading order determination of the gluon polarisation from DIS events with high-p. T hadron pairs, PLB 718 (2013) 922 • Measurement of the Cross Section for High-p. T Hadron Production in Scattering of 160 Ge. V/c Muons off Nucleons, PRD 88 (2013) 091101 • Leading and Next-to-Leading Order Gluon Polarisation in the Nucleon and Longit. Double Spin Asymmetries from Open Charm Muoproduction, PRD 87 (2013) 052018 • Study of Σ(1385) and Ξ(1321) hyperon and antihyperon production in deep inelastic scattering, EPJC 73 (2013) 2581 • Hadron transverse momentum distributions in muon deep inelastic scattering at 160 Ge. V/c , EPJC 73 (2013) 2531 • Transverse target spin asymmetries in exclusive ρ0 muoproduction, CERN-PH-EP/2013 -191, subm. PLB More than 10 papers still in the pipeline. Trying to publish while no beam. COMPASS FRC – November 29, 2013 11
Spares COMPASS FRC – November 29, 2013 12
Investment table Updated Nov. 2013 COMPASS FRC – November 29, 2013 13
Mo. U- Investment table Original table-Feb. 2013 Subdetectors: E: DAQ/Trigger/DCS A: Tracking F: Particle Identification B: Electromagnetic Calorimetry G: Absorber C: LH 2 Target H: Polarized Target D: Recoil Proton CAMERA Detector COMPASS FRC – November 29, 2013 Updated Nov. 2013 14
Projected spending – I COMPASS FRC – November 29, 2013 15