Communitybased Adaptation Project Inception Workshop CBA Database Additions
Community-based Adaptation Project Inception Workshop CBA Database Additions © 2007 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission.
CBA Inception Workshop CBA Projects have a few additional data entry requirements CBA projects will have similar database reporting requirements to SGP projects, with some additions: –Different funding source –Additional indicator system 1 1
CBA Inception Workshop CBA projects are entered in the same way as SGP projects 2 2
CBA Inception Workshop The funding source should be set to “Strategic Priority on Adaptation” 3 3
CBA Inception Workshop Projects must choose “Climate Change Adaptation” as a focal area, as well as the other focal area(s). “Climate change adaptation” should be set as 100% of the funding source. The other focal area(s) should be set to 0%. 4 4
CBA Inception Workshop CBA projects will use the focal area indicator system, as well as the Climate Change Adaptation indicator system. 5 5
CBA Inception Workshop The input screen for the VRA indicator system. • The target value will always be “ 10” • The achievement is the score that the community arrives at for each question • Date of measurement • Input the contents of the H-form into the boxes 6 6
CBA Inception Workshop All seven VRA questions and corresponding H-form data must be entered. 7 7
CBA Inception Workshop The indicator screen, with focal area indicators, and adaptation indicators. 8 8
CBA Inception Workshop All other fields (GPS location, project impact, etc) should be filled out as in SGP projects. 9 9
- Slides: 10