Commercial Aviation Safety Team CAST Runway Safety Initiative

  • Slides: 10
Download presentation
Commercial Aviation Safety Team (CAST) Runway Safety Initiative (RSI) ARAST, Bangkok, Thailand Stord Airport,

Commercial Aviation Safety Team (CAST) Runway Safety Initiative (RSI) ARAST, Bangkok, Thailand Stord Airport, Norway November 19, 2008 Glenn W. Michael

Organizations Represented • • • FSF ERA ACI NTSB (US) BAA NATS Eurocontrol DGAC

Organizations Represented • • • FSF ERA ACI NTSB (US) BAA NATS Eurocontrol DGAC (France) Boeing • • • Honeywell AEA Airbus FAA Embraer IFALPA EASA IATA CAST

RSI - Runway Excursions Three Focus Areas • Approaches • Operation on Runway •

RSI - Runway Excursions Three Focus Areas • Approaches • Operation on Runway • Recovery/Survivability

APPROACHES • Stabilized Approach • New Technology (Honeywell) • ATC Actions • Radar Vectoring

APPROACHES • Stabilized Approach • New Technology (Honeywell) • ATC Actions • Radar Vectoring • Approach Types • Speed Control • Altitude • Proper ATC Training

OPERATION ON RUNWAY • Takeoff and Landing Distance Performance Calculations • Runway Friction •

OPERATION ON RUNWAY • Takeoff and Landing Distance Performance Calculations • Runway Friction • Flare Distances • Wind Information • Go Around Criteria

RECOVERY/SURVIVABILTY • • Runway Safety Areas Condition of Runway Grooved Slope Markings Appropriate Emergency

RECOVERY/SURVIVABILTY • • Runway Safety Areas Condition of Runway Grooved Slope Markings Appropriate Emergency Equipment for Aircraft Location

Currently Underway for Each Focus Area • Recommendations - Data analysis of events •

Currently Underway for Each Focus Area • Recommendations - Data analysis of events • Prevention Strategies & Best Practices - Input from SMEs and FOBN • New Technological Solutions - Analyze possible technology

FINAL PRODUCT • Runway Excursion Toolkit CD • Made Available Worldwide by the Flight

FINAL PRODUCT • Runway Excursion Toolkit CD • Made Available Worldwide by the Flight Safety Foundation • ICAO Compliant

Product Timeline Focus Group input to FSF – June 30, 2008 All Groups review

Product Timeline Focus Group input to FSF – June 30, 2008 All Groups review input during July, 2008 Additional review at next meeting - Nov, 2008 Last meeting planned for March, 2009