Comments on Layout Development D Schulte Tentative Layout

  • Slides: 5
Download presentation
Comments on Layout Development D. Schulte

Comments on Layout Development D. Schulte

Tentative Layout Modification • Some modifications to make civil engineering cheaper • Mainly had

Tentative Layout Modification • Some modifications to make civil engineering cheaper • Mainly had to reduce vertical dimension – Reduce extended straight sections • Will explore combination of injection and side experiments (like in LHC) • Tentative proposal for civil engineering cost evaluation • Have to make sure that this layout is acceptable – New proposed functionality of insertions Shortened to 2. 8 km

Tentative New Layout

Tentative New Layout

Some Important Questions • Is the injection/experimental insertion OK? – Can we have 700

Some Important Questions • Is the injection/experimental insertion OK? – Can we have 700 m for injection followed by 700 m for the experiment? – What if we combine the two systems? – Brennan, Wolfgang, Florian, Andrei, Rogelio, Werner, me to get together • Is the extraction insertion long enough? – Good news from the extraction team – Is the protection good enough (not followed by betatron collimation any more) – Should discuss this in this meeting October 13 • Design of energy collimation system – Need improved lattice design compared to Rome – What are the losses in the arcs? • The betatron collimation system should fit unmodified – Should also work on improved system • Improved design of dispersion suppressors with protection is required – Worked on for the betatron collimation system – Hopefully can use similar system elsewhere – Maria, Antoine, Andy, Francesco, Davide, Ezio, Alex, … • Need to make new integrated lattice – Check aperture

Euro. Cir. Col Meeting/Design Review • Proposal for new layout corresponds to what we

Euro. Cir. Col Meeting/Design Review • Proposal for new layout corresponds to what we discussed early this summer • Euro. Cir. Col meeting November 7, 14: 00 to November 9, 12: 30 in Barcelona – November 7: Coordination meeting 14: 00 -15: 00; review of first intermediate report 15: 00 -18: 00 – November 8: Design review, magnet review, excellent banquet – November 9: Review closed session, WG 9: 00 -10: 30; summaries 10: 3012: 30 – Invitations will be sent out soon • Should aim to have first order answers by then – Plenty of work – Also other changes need a look • • Detector design changed Beamscreen design and alignment Apertures …