Colorado Hazard Mapping Phase III Program Overview June

  • Slides: 18
Download presentation
Colorado Hazard Mapping Phase III Program Overview June 27, 2017

Colorado Hazard Mapping Phase III Program Overview June 27, 2017

Introduction • Introductions • Colorado Senate Bill 245 – Provide funding to map natural

Introduction • Introductions • Colorado Senate Bill 245 – Provide funding to map natural hazards in CO • Floodplain mapping/modernize remaining counties • Erosion Hazard Zones • Debris Flow mapping – $6. 8 million total – Multi-year program – Phase I, II & III currently underway

Scope of Work Phase III Estimated Totals: Surveyed structures: 220 Surveyed cross-sections: 82 Miles

Scope of Work Phase III Estimated Totals: Surveyed structures: 220 Surveyed cross-sections: 82 Miles of enhanced hydraulic study: 104 Miles of base hydraulic study: 887

Scope of Work Bent County Estimated Totals: Surveyed structures: 3 Surveyed cross-sections: 11 Miles

Scope of Work Bent County Estimated Totals: Surveyed structures: 3 Surveyed cross-sections: 11 Miles of enhanced hydraulic study: 9. 5 Miles of base hydraulic study: 162. 3

Scope of Work Costilla County Estimated Totals: Surveyed structures: 17 Surveyed cross-sections: 0 Miles

Scope of Work Costilla County Estimated Totals: Surveyed structures: 17 Surveyed cross-sections: 0 Miles of enhanced hydraulic study: 2. 9 Miles of base hydraulic study: 120. 8

Scope of Work Lincoln County Estimated Totals: Surveyed structures: 34 Surveyed cross-sections: 4 Miles

Scope of Work Lincoln County Estimated Totals: Surveyed structures: 34 Surveyed cross-sections: 4 Miles of enhanced hydraulic study: 8. 7 Miles of base hydraulic study: 0. 0

Scope of Work Otero County Estimated Totals: Surveyed structures: 32 Surveyed cross-sections: 25 Miles

Scope of Work Otero County Estimated Totals: Surveyed structures: 32 Surveyed cross-sections: 25 Miles of enhanced hydraulic study: 31. 3 Miles of base hydraulic study: 73. 6

Scope of Work Otero County Estimated Totals: Surveyed structures: 32 Surveyed cross-sections: 25 Miles

Scope of Work Otero County Estimated Totals: Surveyed structures: 32 Surveyed cross-sections: 25 Miles of enhanced hydraulic study: 31. 3 Miles of base hydraulic study: 73. 6

Scope of Work Phillips County Estimated Totals: Surveyed structures: 14 Surveyed cross-sections: 5 Miles

Scope of Work Phillips County Estimated Totals: Surveyed structures: 14 Surveyed cross-sections: 5 Miles of enhanced hydraulic study: 4. 3 Miles of base hydraulic study: 0. 0

Scope of Work Saguache County Estimated Totals: Surveyed structures: 0 Surveyed cross-sections: 0 Miles

Scope of Work Saguache County Estimated Totals: Surveyed structures: 0 Surveyed cross-sections: 0 Miles of enhanced hydraulic study: 0 Miles of base hydraulic study: 8. 4

Best Available Information • BAI is existing FIRM, FIS, FHBM/FW Map OR draft or

Best Available Information • BAI is existing FIRM, FIS, FHBM/FW Map OR draft or prelim info supplied by FEMA or other source • Must follow FEMA technical standards and accuracy • Tool to reduce community flood risk – Use in community planning, engineering, development review, permitting and emergency management functions – First check local codes and ordinances to see how it can be used (may need to be adopted) – Can be used to submit LOMA and LOMR-Fs. FEMA will determine accuracy determine eligibility – GIS data will be made available

State Strategy & Implementation • Outreach – Quarterly Meetings or Quarterly Newsletters – Dedicated

State Strategy & Implementation • Outreach – Quarterly Meetings or Quarterly Newsletters – Dedicated Website – Review Meeting • Public Outreach Assistance – Press Release – Public Meetings – Templates • Not Regulatory Map – Not part of this scope – No Due process and appeal period-FEMA Map update

Communication and Outreach http: //www. coloradohazardmapping. com/

Communication and Outreach http: //www. coloradohazardmapping. com/

iew Flood Me risk etin gs Rev Flo od Ma plain ppi ng lics

iew Flood Me risk etin gs Rev Flo od Ma plain ppi ng lics rau Hyd gy rolo vey Sur g Me etin Hyd Kick off 201 7 201 6 Fall r 20 /Wint e 18 July Jan 201 uary 8 July State Strategy & Implementation Phase I Timeline

State Strategy & Implementation • Next Steps – Memorandum of Understanding – Survey –

State Strategy & Implementation • Next Steps – Memorandum of Understanding – Survey – Hydrology

Project Team CWCB Project Contacts: Thuy Patton thuy. patton@state. co. us Stephanie Di. Betitto

Project Team CWCB Project Contacts: Thuy Patton thuy. patton@state. co. us Stephanie Di. Betitto stephanie. dibetitto@state. co. us Amec Foster Wheeler Project Contact: John Loranger John. loranger@amecfw. com

Questions?

Questions?