CNRAD dosimetry and Summary of the TS Summary

  • Slides: 4
Download presentation
CNRAD dosimetry and Summary of the TS • Summary of the Technical Stop •

CNRAD dosimetry and Summary of the TS • Summary of the Technical Stop • Installation have been performed the 11 th of May. • CNGS third slot - beam started on the 12 th of May at 11: 15 am • Next access will be between the 20 th and 24 th of June (to be defined) Power converters • IGBT setup has been removed (ΦHEH = 1. 33 E 12 cm-2) → very low xsections; Measurement of Ileak → Higher voltage test not necessary as 670 V is already a max. → Max. LHC tunnel dose and Φeq already reached • XP-Power AC-DC converter failed at a ΦHEH = 7. 4 E 9 cm-2 All the values are given with a factor of 2 of uncertainty • Another XP-Power AC-DC have been placed • During the 3 rd Slot it already failed at ΦHEH = 3. 1 E 8 cm-2 Deriv. FIP • Replacement of the regulator on the board supplying the Deriv. FIP module • There is a shift of the regulator on the Deriv. FIP module from 2. 5 V to 1. 9 V -> to be followed up • Observation of 1 event at 7. 34 E 11 cm-2 J. MEKKI 18/05/11 – Rad. WG meeting (1/3)

CNRAD dosimetry and Summary of the TS Next access between 20 th and 24

CNRAD dosimetry and Summary of the TS Next access between 20 th and 24 th of June BLM detectors Station 1: 3 CB 50 for high voltages 2 optical fibers 1 CB 50 for Remote Reset Cryo (Fip based) ? Station 2: 1 NE 48 Station 3: World. FIP PCI 1 MHz LED warning signs Station 3: Deriv. FIP Station 2: 1 NE 48 Station 4: 1 Profibus used as a FIP 1 Ethernet connection for Webcam 1 CB 50 for remote reset of the webcam Camera located below Station 4 where the radiation field should be low enough to avoid radiation damage Position to be discussed for the next slot Station 3: 1 NE 48 QPS ? Station 4: 1 NE 48 World. FIP PCI 1 MHz J. MEKKI 18/05/11 – Rad. WG meeting TE/EPC Station 1: 1 NE 48 (2/3)

CNRAD dosimetry and Summary of the TS Position of the Rad. MONs during the

CNRAD dosimetry and Summary of the TS Position of the Rad. MONs during the 2 nd Slot (01/04 19: 34 – 09/05 8: 00) Number of POTs: 1. 19× 1019 RM 8 box (5 V) Facing TSG 45 (90°) 1000 nm Close to the camera PMI 406 RM 10 dep 400 nm + 100 nm Dose: >3 k. Gy (100 nm measur. ) Saturation of the 400 nm (due to electronics) → replaced 1 -Me. V fluence: Saturation (due to electonics) at 2. 9× 1013 cm-2 Before saturation Φeq: 1. 14× 1013 cm-2 during slot 2. Dose : 1. 13 Gy (measur. ) HEH fluence: 9. 9× 108 cm-2 RM 7 dep BLM position Facing TSG 45 400 nm + 100 nm Dose: 337. 2 Gy 1 -Me. V fluence: 3. 33× 1012 cm-2 RM 8 dep LED position 400 nm Value to be checked at the end of Slot 3 Dose: 38. 9 Gy 1 -Me. V fluence: 3× 1011 cm-2 HEH fluence: 2. 35× 1012 cm-2 Value to be checked at the end of Slot 3 PMI 407 HEH fluence: 2. 1× 1011 cm-2 RM 7 box (5 V) Facing TSG 45 (90°) 1000 nm in short circuit To be read at the end of each slot Dose : 1. 65 Gy (measur. ) HEH fluence: 6. 1× 108 cm-2 (measur. ) : measurement value Otherwise Dragon tool value J. MEKKI Around 10 cm towards TSG 45 455 -bis RM 10 box (3 V) To calibrate the position Facing TSG 45 (45°) 455 : Dose: 16. 4 Gy HEH fluence: 8. 9× 1010 cm-2 455 -bis: HEH fluence: : 1. 3× 1011 cm-2 (measur. ) RM 9 box (5 V) Not possible to set 3 V Below Deriv. FIP module Facing TSG 45 400 nm + 100 nm (problem on the 15/04 08: 03 -> Stopped measuring POT: 3. 9 E 18) Total during Slot from Dragon tool: Dose: 149. 5 Gy 1 -Me. V fluence: 1. 5× 1012 cm-2 HEH fluence: 1. 1× 1012 cm-2 RM 11 box (3 V) RM 11 dep Facing TSG 45 400 nm + 100 nm (problem on the 06/04 16: 05 ->Stopped measuring (POT: 1. 2 E 18) Total during Slot from calibration table: Dose: 89. 2 Gy 1 -Me. V fluence: 1× 1012 cm-2 HEH fluence: 6. 7× 1011 cm-2 18/05/11 – Rad. WG meeting (3/3)

CNRAD dosimetry and Summary of the TS New positions RM 8 box (5 V)

CNRAD dosimetry and Summary of the TS New positions RM 8 box (5 V) 1000 nm From Station 4 to position 463 RM 7 box (5 V) From Station 2 to position 456 J. MEKKI 18/05/11 – Rad. WG meeting (4/3)