CMS MAINTENANCE RADIATION SHIELDING TOOLING Preliminary for discussion



















































- Slides: 51
CMS MAINTENANCE, RADIATION SHIELDING & TOOLING (Preliminary, for discussion only) A. Surkov University of Wisconsin CERN March 06. 2012 1
CMS OPENING 3. 74 m (scenario N 1) 2
Radiation shielding. Main support. Traverse 3
Main support. Parameter drawing 4
Access platform 5
Access platform 6
Main support-options 7
The frame for attach main support onto concrete block 8
The frame for attach main support onto concrete block 9
The frame for attach main support onto concrete block 10
Main support installation TEST Very preliminary 11
BP radiation shielding. Parameter motivation 12
BP radiation shielding. Parameter motivation 13
BP radiation shielding. Parameter motivation 14
BP shielding installation. Step by step 15
BP radiation shielding installation. Parameter drawings 16
17
BP radiation shielding. Parameter drawings 18
Beam pipe shielding. Parameter drawing (scenario N 1 -2) 19
BP radiation shielding. Parameter drawings (1 -2) 20
Scenario N 4 YB 0/YB 1/YB 2 maintenance 21
BP radiation shielding. Parameter drawings 22
Scenario N 7 CMS OPENINING EB Super module reinstallation 23
BP radiation shielding. Parameter drawings 24
BP & shielding support (7) 25
Scenario N 8 CMS OPENINING 10 m TK/HB/EB/ES/EE maintenance 26
BP radiation shielding. Parameter drawings 27
BP & shielding supports (1 -2 -4 -5 -8 -9) 28
Radiation protection (scenario N 8) Very preliminary 29
Scenario N 10 PIXEL maintenance (End Cap open 10 m) 30
PIXEL maintenance (scenario N 10) 31
PIXEL maintenance. Shielding installation 32
BP radiation shielding. Parameter drawings 33
BP radiation shielding. Parameter drawings (10) 34
Radiation shielding/Traverses interface 35
Radiation shielding/Traverses interface 36
Radiation shielding/Traverses interface stop 37
BP shielding & Traverse INTERFACE (Parameter drawings) 38
BP shielding & Traverse INTERFACE (Parameter drawings) 39
TRAVERSE for BP shielding installation Scenario N 1 -2 -8 -10 40
TRAVERSE for BP shielding installation (8) 41
Beam pipe mechanical protection (scenario N 1 -2 -4 -5 -8) 42
Scenario N 11 TK maintenance 43
TK reinstallation TOOLING (11) 44
Main platforms adjustable support (11) 45
Main platforms support (11) 46
Radiation shielding. Option I(11) 47
HB (RBX) maintenance (1 -st step) 48
HB RBX maintenance 49
HB (RBX) maintenance (2 -nd step) BP shielding 50
Dear Colleagues, This material was prepared for discussion. Your recommendation, remarks and comments are welcome. Without your participation will be impossible to provide the radioactive shielding & tooling design. I hope to have response from following people !: Wolfram Zeuner Patrick Lepeule Joseph Howell Dick Loveless Ken Bell Lino Demaria Karl Aaron Gill Gino Bolla Jean Bos Nicola Bacchetta Dmitry Druzhkin Austin Ball Nicolas Siegrist Gerard Faber Farshid Feyzi Stephane Bally Wolfgang Funk Domenico Dattola Daniel Wenman Ettore Focardi Nebojsa Smiljkovic Hubert Gerwig; Christoph Schaefer; Andrea Gaddi; Michel Arnaud Also it is necessary the responses from the sub-detectors and subsystems coordinators. 51