Climate City Ulm with biomass Dipl Ing Dieter
Climate City Ulm with biomass Dipl. Ing. Dieter Danks Fernwärme Ulm Gmb. H Technischer Leiter
Stadt Ulm – Toprunner in the South § Ulm is a university town in Baden-Württemberg at the river Danube, located south-east of Schwäbischen Alb. § Ulm has 120. 000 Inhabitants, the central town about 100. 000 inhabitants. § The tower of the cathedral is with 161, 53 m one of the highest in the world. § A famous son of the town is Albert Einstein, born hier in 1879 Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Stadt Ulm – Aktiv Passiv § Science Park II does not only host global companies such as Daimler, Nokia, or Siemens, but also the worldwide biggest passiveenergy office building § On the occasion of the World Exhibition EXPO 2000 the project „sun fields“ was constructed in Ulm. With 110 single family buildings it was at that time the biggest passive -house settlement worldwide. In the meantime, 50 single houses have been added. Further passivehouse settlements are in planning. Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Ulm – City in a Climate Alliance § In 1993 Ulm has joined the Rio Climate Alliance. The city has committed to reducing its CO 2 emissions, serving as indicator for overall environmental impact, by 50% compared to 1987 levels. § Like other cities, the city of Ulm is unlikely to reach this target. Generally, despite a great number of activities, all efforts are levelled out by steadily increasing traffic volumes. § The only hope of the city lies now with our company Fernwärme Ulm Gmb. H. Thanks to our district heating system, based almost entirely on CHP, extensive use of surplus heat and use of CO 2 -neutral fuels, significant progress allows to demonstrate significant progress and success. Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Die Fernwärme Ulm Gmb. H § Shareholders of FUG are: - Energie Baden-Württemberg AG (En. BW) - Stadtwerke Ulm/Neu-Ulm Gmb. H (SWU) Holding 50% each § FUG employs approx. 200 people § FUG is THE heat supplier in Ulm: ca. 45 % of the entire heat demand of the city is being produced by FUG. § District heat supply in Ulm since 1950 § The Technical Director FUG, Mr. Dieter Danks, has just been reelected for the 6 th time by all environmental associations as chairman of the Local Agenda 21 in Ulm Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
FUG - Guidelines § The best energy is the one that is not being used. § The remaining energy should be used as efficiently and climate-friendly as possible. § Independence from imported energies. Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Anteil der regenerativen Energien § Germany 2004 Heat supply 4, 2 % Electricity supply 9, 3 % § Germany 2020 (declared intentions) Heat and electricity supply 20 % each § FUG 2005 50% share of renewable energies, incl. Energy from the MHKW Donautal § Outlook FUG from 2011 80% share of renewable energies Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Production plants FUG Müllheizkraftwerk im Donautal Ulmer Weststadt with Biomass CHP plant Peak load Uni – TVZ Eselsberg Waste CHP plant and peak load heating plant in Donautal Peak load heating plant Fort Albeck Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
CHP site Magirusstraße Biomass CHP II (Fotomontage) Biomass CHP I Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008 Conventional CHP
Key parameters Biomass CHP I + II § Biomass CHP I - start of operation: - heat capacity: - electric capacity: - combustion process: - investments: § Biomass CHP II (in planning) - start of operation: - heat capacity: - electric capacity: - combustion process: - investments: Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008 2004 58 MW 8, 6 MW Vorschubrost 37 Mio EUR planned for 2010 65 -70 MW 20 MW Zirkulierende Wirbelschicht oder Vorschubrost 83 Mio EUR
Intake of surplus heat FUG is open to concepts from private investores: § § § Since 1996 FUG buys surplus heat from saw dust from a big wood manufacturing plant. § In 2 month, a 1, 7 km preinsulated pipe (under construction) will connect a a biogas plant in Gögglingen that is twice that size. § A further biogas plant is in the authorisation process. Since 1997 FUG buys surplus heat from a waste incineration plant Since 2006 surplus heat from a private biogas plant with a capacity of 500 k. W is being fed into the network Wiblingen eingespeist. Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Surplus heat from biogas Biogas plant under construction in Gögglingen with 5 engines capacity: - electric 970 k. W - thermal 1053 k. W Heat supplied to DH Wiblingen, Return temp. Increase from 67°C to 83°C Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
„network plan“ – District Heat in Ulm and Neu -Ulm Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Connection pipe HWD – HKW Technische Daten length: 5, 5 km type of pipe: preinsulated diametre: DN 400/630 (mm) Operating temperature: max. 120°C Pressure level: PN 25 Max. transport capacity: 53. 000 k. W Time of construction: Daimlerstr. - Märchenweg: 08/2006 – 07/2007 Märchenweg – Moltkestr. : 08/2007 – 06/2008 Grabenquerschnitt: Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008 KMR-System
Pipeline length Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Prognose mit Bio. HKW II Total fuel use FUG 1995 to 2011 Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Electricity production FUG from CHP ( annual electricity demand Ulm approx. 640 GWh ) Prognose KWK-Strom EVS Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008 KWK-Strom FUG EEG/KWK-Strom FUG EEG-Strom FUG
CO 2 -balance FUG: all fuels (incl. waste, biomass) without electricity bonus Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
CO 2 -balance FUG: all fuels (incl. waste, biomass) with electricity bonus Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Operation from 2011 (after IB Bio. CHP II) § CO 2 -neutral district heating supply FUG in Ulm § Almost complete independence from imported energies § Decentral electricity production Bio. Heating Plant I+II CHP M Heating Plant Biogas Anlagen Total: ca. 160 Mio. KWh ca. 20 Mio. KWh ca. 60 Mio. KWh ca. 15 Mio. k. Wh ca. 255 Mio. KWh This correspondes to 39% of the entire electricity demand in Ulm Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Quo Vadis FUG ? § Construction of 5, 5 km connection pipe HKW – HWD § Construction of biomass heating plant II, with 65 -70 MW therm. (in authorisation process) § Study conversion of steam network close to finalisation § Rerfurbishment of old boiler installations following revision of immission law until 2012 • HKW Magirusstraße • HWD Daimlerstraße 3 boiler plants 2 boiler plants § Outphasing of old installations from 2012 • HKW Magirusstraße 2 boiler plants • HWD Daimlerstraße 2 boiler plants Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008
Konsequentes Handeln nach den FUG - Leitlinien § The best energy is the one not being used Ø Ø Ø Reservation of construction areas exclusively for passive houses Identification of refurbishment areas, going hand in hand with refurbishment of existing building stock Optimisation of district heating grid– conversion from steam § Independence from imported energies Ø Operation of planst with Biomass, Waste and (remaining) coal Ø Use of surplus heat § Supply remaining heat as efficient and environmentally and climate friendly as possible Ø Almost 100% CHP, Modernisation of production parc Klimastadt Ulm – dank Biomasse / D. Danks / 05. 06. 2008