City of Greenville Bus Transfer Facility Public Review
City of Greenville Bus Transfer Facility Public Review Meeting April 29, 2008
Goal To evaluate and provide a recommendation for a site for the new Bus Transfer Center consistent with economic, urban design and operational requirements. This will be accomplished in a collaborative manner with GREAT, the City, PATS, ECU, the County, Carolina / Greyhound Trailways, and the MMPA Design Team.
TRANSIT CENTER DESIGN Greensboro Multimodal Transportation Facility
TRANSIT CENTER DESIGN Spartanburg Transit Center
TRANSIT CENTER DESIGN Asheville Transit Center
INTERMODAL CENTER DESIGN Greensboro Multimodal Transportation Facility
INTERMODAL CENTER DESIGN Racine Intermodal Transportation Center
INTERMODAL CENTER DESIGN Binghamton Intermodal Transportation Center
INTERMODAL CENTER DESIGN Petersburg Multi-Modal Transportation Center
INTERMODAL CENTER DESIGN Kalamazoo Transportation Center
INTERMODAL CENTER DESIGN Fredericksburg Regional Transit Station
Summary of Costs and Benefits for Stakeholders and the Community
Public Comments… July 17 & 17, 2008 Meetings ü Make it look nice. ü Make it a place where people can go and eat and have a place to sit and rest. ü Police substation is a good idea. ü Being near railroad would entice rail service. ü Be accessible. ü Have a full cover the bus loading areas. Winston-Salem is a good example of a full cover and it is opposite of a concert venue so there is activity in the evening. ü Building design should feel open. ü Secure parking. ü No big trees that people can hide behind.
Themes for the Facility Theme One – Accessibility Theme Two – Safety and Security Theme Three – Multipurpose Theme Four – Inspiring Theme Five – Streamlined
Site Selection Criteria
GREAT Site Screening • • • Access/Operations – Efficient layout/ability to move in and out Cost – Appropriateness/Most for the money Size – Adequate for current and future needs Intermodality – Best location for all transportation providers Close to Downtown/ECU —Core hub locations Availability – Assemblage issues Image – Location/design that will enhance the City’s and transit’s image Urban Design/Planning —Enhance City’s objectives 10 th Street Connector —Access to major future transportation corridor Economic Development – Enhance opportunities on surrounding sites
GREAT Site Screening Matrix – Site Performance
Site Selection Pros VS Cons
Second Floor Plan
Concept A
Concept B
Concept C