CIM for DER Common Information Model John J
- Slides: 8
CIM for DER Common Information Model John J. Simmins, Ph. D. Technical Executive OGC Tech and Planning – St. Johns 28 June 2017 © 2016 Electric Power Research Institute, Inc. All rights reserved.
OMS GIS Etc. Applications Enterprise Integration DMS (centralized) DERMS EPRI Product ID: 3002001249 Communication Networks SCADA / Field Networks (field & facility) Sensors, Switches, Capacitors, Regulators 2 DER SOLAR BATTERY PEV (end-device functions) © 2016 Electric Power Research Institute, Inc. All rights reserved. 2009 - 2012 MDMS 2013 - 2017 DER Enterprise Integration
2009 - 2012 § Functions of smart inverter § Over 600 participants § Process – – – Use cases Functions for smart inverters Data model Open. DERMS Standards protocols § SEP § DNP 3 § 61850 – MMS – Goose – 61850 -90 -7 3 Common Functions for Smart Inverters, Version 3. EPRI, Palo Alto, CA: 2013. 3002002233. © 2016 Electric Power Research Institute, Inc. All rights reserved.
2013 - 2015 § DER enterprise integration § October 2012 § Over 50 participants § Identified 6 use cases – – – DER Group Creation DER Group Status Monitoring DER Group Capabilities Discovery Real Power Dispatch Reactive Power Dispatch DER Forecasting § Process – – – Create use cases Identify data requirements Model in CIM/Multi. Speak Create messages Open. DERMS Interoperability test – Ongoing Enterprise Integration Functions for Distributed Energy Resources: Phase 1. EPRI, Palo Alto, CA: 2013. 3002001249. DER Enterprise Integration: Interoperability Workshop Results. EPRI, Palo Alto, CA: 2014. 3002003035. 4 © 2016 Electric Power Research Institute, Inc. All rights reserved.
The Concept of a DER Group § By Substation § By Circuit/Bus § By Feeder Segment (contiguous conductor between switches) § By Island or Microgrid (campus, industrial facility) § By Individual Device § By Lat/Lon Rectangle 5 © 2016 Electric Power Research Institute, Inc. All rights reserved.
Track: Systems Integration / CIM Compliance § DER Enterprise Integration – Original use cases – DER Group creation maintenance – DER Group forecast – DER Group dispatch (real, reactive power) – DER Group status – Updating test script (Adding 3 use cases) – DER Group Voltage regulation (ramp/curve) – DER Group Capability discovery – DER Group connect/disconnect – Testing event: October 10 – 12, 2017, – EPRI Knoxville campus – Utilities and vendor tracks Deliverables: • • 6 Technical Report: IEC 61968 -5 Distributed Energy Optimization Test Script Artifacts: : WSDLs (IEC 61968 -100 compliant), XSDs (IEC 61968 -5 compliant) Test Cases: soap. UI, EPRI Test Harness updates © 2016 Electric Power Research Institute, Inc. All rights reserved.
Questions? John J. Simmins jsimmins@epri. com 865 -218 -8110 (O) 301 -848 -5153 (C) 7 © 2016 Electric Power Research Institute, Inc. All rights reserved.
Together…Shaping the Future of Electricity 8 © 2016 Electric Power Research Institute, Inc. All rights reserved.