Chiller Brine Water control system UNICOS CPC 6
Chiller + Brine + Water control system UNICOS CPC 6 19. 01. 2012 Lukasz Zwalinski – PH/DT
System architecture - option with 1 CPU and backplane extension OWS DIP Brine OWS Thermosiphon CERN GPN Brine CPU + I/O cards Chiller 1 Chiller 2 Water I/O cards M 340 with Multi-Port Module back plane extension ETHERNET IP surface Ring topology Distributed I/|O 1 CPU and backplane extension: + 1 PVSS data server + no need to build up software communication + simple ! ~ 800 I/O
PVSS panels - COMMANDS
PVSS panels
PVSS panels Right click
PVSS panels Double click
PVSS panels - ALARMS
PVSS panels – Alarms types Digital Alarms Analog Alarms
PVSS panels – Alarm list
PVSS panels COMMANDS Push button opens popup panel Vertical panel navigation
PVSS panels chiller operation mode selection Vertical panel navigation
PVSS panels - R 404 stepper
PVSS panels - R 23 stepper
PVSS panels - R 404
PVSS panels COMPRESSOR ANADO object
Chiller - alarms EHT alarms Compressor alarms
PVSS panels - R 23
PVSS panels - Water
PVSS panels - Brine
PVSS panels - Thermosiphon
PVSS panels - compressed air diagnostic
PLC Ethernet connection in SX 1
To clarify - touch screen BIG misunderstanding! We have asked J&E HALL to install graphic color 7. 5”, type XBTGT 4230 Schneider EN/ICE CPC 6 solution for touch panels Touch Panel: For sure we will not develop a UNICOS for the Schneider Touch Panel. You have to change this touch panel to a Siemens Touch Panel series working with Win. CC Flexible.
Visit to J&E Haal 11 -12. 01. 2012 19. 01. 2012 Lukasz Zwalinski – PH/DT
Status
Status
Status
Status
Status
PLC hardware configuration Bought To order PVSS data server ordered in ICE last year Installed
TESTs …. Private Ethernet network Logic tests: - Compressor steppers (R 404, R 23) - Operation modes selections, swaps, … - Object dependent logic (EV 53003, EV 53007, Comp 59502, CV 59201, CV 59202, CV 59213, …) - Controllers direction verification Preliminary I/O test - Connecting SCADA + PLC + Chiller 1 using back plane extension -Testing 2 signals on each Telefast module (verification PVSS->PLC mapping, PLC->I/O mapping) TT 59211, PT 59236, AISpare 08, …
STATUS Current project status: • I/O for all project Brine+Water+Chiller 1+Chiller 2 (~800) • Logic for Chiller 1 (95%) • Alarms and interlocks for Brine+Water+Chiller 1+Chiller 2 To do: • Recipes • Continue logic tests once PLC will be back from UK • Brine and Water logic to be programmed • Touch panel programming • Communication to Thermosiphon PLC