Project Management Processes Learning Objectives At the end of this chapter, you should be

Project Management Processes Learning Objectives At the end of this chapter, you should be able to: 1. Name the 5 project management process groups 2. Explain the sequence among the process groups 3. Explain the activities that take place in each process group PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Project Management Processes 1. Initiating the project 2. Planning the project 3. Executing the

Project Management Processes 1. Initiating the project 2. Planning the project 3. Executing the project 4. Monitoring and Controlling the project 5. Closing the project PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Project Management Process Chart • Note for Kamran (Refer to Rita’s Process Chart -

Project Management Process Chart • Note for Kamran (Refer to Rita’s Process Chart - Ch 3 (Pg 41) – We need to have this chart animated. We will send you a copy of the chart. • Need to animate an exercise from the book – Page 57. We will send you the scan of the exercise • Narrator just needs to read the bullets from the animation PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Refe upda

Project Management Process Flow Note for Source: PMBOK® Guide 5 edition Page 50 Kamran

Project Management Process Flow Note for Source: PMBOK® Guide 5 edition Page 50 Kamran – We need to OPM 3 and PMBOK are registered marks of Project animate this PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals picture www. Inov 8 Solutions. com th

Review Quiz Which process groups must be included in every project? A. Planning, executing,

Review Quiz Which process groups must be included in every project? A. Planning, executing, and closing B. Initiating, planning, and executing C. Initiating, planning, executing, monitoring and controlling, and closing D. Planning, executing, and monitoring and controlling PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz Project Management Process Groups are: A. Overlapping activities that occur at varying

Review Quiz Project Management Process Groups are: A. Overlapping activities that occur at varying levels of intensity throughout the project B. Overlapping activities that occur at the same level of intensity throughout the project C. Discrete, one-time events D. Discrete, repetitive events that occur at the same level of intensity throughout each phase the project PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Initiating Process Group • How does your organization decide which project(s) to choose? –

Initiating Process Group • How does your organization decide which project(s) to choose? – ROI – Cost Benefit Analysis – Discussed in detail in Integration chapter. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Inputs & Outputs • Inputs for this Process Group? – Understand why these are

Inputs & Outputs • Inputs for this Process Group? – Understand why these are important. • Activities? – Develop Project Charter – Identify Stakeholders – Split large projects into phases PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Notes for Kamran v. Note for Kamran – Page 61 from the book needs

Notes for Kamran v. Note for Kamran – Page 61 from the book needs to be animated v. Narrator just needs to read each activity from the animation PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Re upd

When are we in initiation? • Initiation Process is begun due to – Business

When are we in initiation? • Initiation Process is begun due to – Business need – Begin a new phase of the project – reevaluate the business need due to • Project problems • Change requirements • Change in market conditions (competitor activity) Note for Kamran –Animation required (Page 63) PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Re be

Review Quiz Reviewing the initiating processes at the start of each project phase: A.

Review Quiz Reviewing the initiating processes at the start of each project phase: A. Is a waste of time and should be avoided whenever possible. B. Helps to keep project focused on the business need that the project was undertaken to address. C. Helps ensure that the project continues regardless of the changes in the business needs. D. Helps ensure continuous employment of the project team members even if the project is unlikely to satisfy the business need that it was undertaken to address. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz The BEST time to assign a project manager to a project is

Review Quiz The BEST time to assign a project manager to a project is during: A. Executing B. Closing C. Initiating D. Planning PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz All of the following must be performed during project initiating EXCEPT: A.

Review Quiz All of the following must be performed during project initiating EXCEPT: A. Identify and document business needs B. Create a project scope statement C. Divide a large project into phases D. Accumulate and evaluate historical information. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Planning Process Group • What do we need to plan for? – Define Scope

Planning Process Group • What do we need to plan for? – Define Scope – Work Breakdown Structure – Define Activities & Schedule – Estimate Time & Cost – Quality Planning – Procurement Planning – Human Resource Planning • Which stakeholders should be involved in this process? PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Planning Activities • Note for Kamran – We need to animate the planning process

Planning Activities • Note for Kamran – We need to animate the planning process group activities from page 41 Chart. We will scan and provide the chart. • Notice Activity 'Go back – iteration' – – Why is this activity after 'Perform risk identification'? Why need to do this? PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com R to

Planning Activities contd Ø Note for Kamran – We need to animate the planning

Planning Activities contd Ø Note for Kamran – We need to animate the planning activities listed on page 65, 66 and 67 Ø Narrator to read the activities as they appear on the screen PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Re to

When are we in Planning? • Note for Kamran – Animate the picture from

When are we in Planning? • Note for Kamran – Animate the picture from page 68. We will provide the picture. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Exam Tip • Remember “Project Plan” is different than “Project Schedule” PMP, CAPM, Pg.

Exam Tip • Remember “Project Plan” is different than “Project Schedule” PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz Identifying which quality standards are relevant to the project and determining how

Review Quiz Identifying which quality standards are relevant to the project and determining how to satisfy them should be addressed during: A. The conceptual phase B. The Planning process C. Project implementation D. Risk identification PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz All of the following occur during the planning process group EXCEPT: A.

Review Quiz All of the following occur during the planning process group EXCEPT: A. Develop Project Charter B. Create WBS C. Estimate Costs D. Sequence Activities PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz A detailed project schedule can be created only after creating the: A.

Review Quiz A detailed project schedule can be created only after creating the: A. Project budget B. Work Breakdown Structure (WBS). C. Project Management Plan D. Detailed risk assessment PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Executing Process Group • What is the purpose of this group? – – –

Executing Process Group • What is the purpose of this group? – – – • To complete the work defined in the plan To meet the project objectives The “do” step (start, plan, do, check and act, end) This process consumes most amount of time, resources and money PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

When are we in Execution Process Group? Note for Kamran – We need to

When are we in Execution Process Group? Note for Kamran – We need to animate the picture on page 72. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com R b

Executing Process Group Activities • • Direct and Manage Project Work Perform Quality Assurance

Executing Process Group Activities • • Direct and Manage Project Work Perform Quality Assurance Acquire Project Team Develop Project Team Manage Communications Conduct Procurements Manage Stakeholder Engagement PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Activities Involved in Project Execution Ø Note for Kamran – We need to animate

Activities Involved in Project Execution Ø Note for Kamran – We need to animate the Execution activities listed on page 70 and 71. We will provide you the details Ø Narrator to read the activities as they appear on the screen PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Re upd

Review Quiz Which project management process group generally takes the MOST project time and

Review Quiz Which project management process group generally takes the MOST project time and resources? A. Planning B. Design C. Integration D. Executing PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Review Quiz Which process group focuses on completing the requirements of the project? A.

Review Quiz Which process group focuses on completing the requirements of the project? A. Initiating B. Planning C. Closing D. Executing PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Monitoring And Controlling • Monitors project activities against the plan and baseline – How

Monitoring And Controlling • Monitors project activities against the plan and baseline – How many baselines do we have? • Approving change requests – Recommended corrective and preventive actions – Defect repair – Change control process / Change control board • Why Monitor and Control? – Keep scope creep in check – Keep project on track (on time, on budget) – Handle changes amicably PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

What to Monitor? • • • Scope Schedule Cost Quality Risks Procurements • Use

What to Monitor? • • • Scope Schedule Cost Quality Risks Procurements • Use regular measurements and reports PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

Monitor And Control Triggers • We enter Monitor and Control when – Requested changes

Monitor And Control Triggers • We enter Monitor and Control when – Requested changes (corrective/preventive actions, defect repair) – Work performance information – deliverables • We can exit Monitor and Control to – Initiating Group to review project charter – Planning Group to re-plan – Executing Group to repair defects – Closing Group if the project is complete Ø Note for Kamran – we need to animate picture on page 78. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com R be

Closing Process Group • The last set of activities on a project. • What

Closing Process Group • The last set of activities on a project. • What comes next? • Project is Complete? – Close the project. • Project Phase is complete? – Close the phase. • Project terminated? – Close the project – What is there to close in this case? – Why do this? PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

When do we enter in Project Closing Note for Kamran – We need the

When do we enter in Project Closing Note for Kamran – We need the picture animated from Page 81. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com Refer updat

3. 7 Closing Activities • • • Finalize activities across all process groups Formally

3. 7 Closing Activities • • • Finalize activities across all process groups Formally complete contractual obligations Verify completion of the defined processes Close procurement contracts Release resources Handover • Note for Kamran – We need to animate page 79 and 80 and have Narrator read them out. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com R b

3. 7 Closing Outputs • Below tasks are outcomes from this process: – –

3. 7 Closing Outputs • Below tasks are outcomes from this process: – – – Obtain formal acceptance from customer or sponsor Conduct post-project or phase end review Record impacts of changes to any process Document lessons learned Update Organizational Process Assets Archive all Project documents in the Project Management Information system – Close out all procurements PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Summary 1. Process groups: • • Initiating, Planning, Executing, Monitoring and

End of Chapter Summary 1. Process groups: • • Initiating, Planning, Executing, Monitoring and Controlling, Closing Project selection methods 2. Initiating: • • • Purpose: authorizes project Reasons for initiation Activities: Project Charter, Stakeholders 3. Planning: • • Purpose: plan everything about the project Activities: Quality, Scope, Schedule, etc. PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Summary 4. Executing: • • Purpose: Perform the project activities Activities:

End of Chapter Summary 4. Executing: • • Purpose: Perform the project activities Activities: Perform work, Manage team, Manage Stakeholders, etc. 5. Monitoring and Controlling • • Purpose: Measure project performance Activities: Measure, Change requests, etc. 6. Closing • • • Purpose: Bring project to a close Reasons for closure Activities: Lessons Learned, Archive, Procurements PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Questions 1. You have been asked to edit the descriptions

End of Chapter Quiz Questions 1. You have been asked to edit the descriptions in the online help feature of one of your company's ongoing standard software applications. The description relates to the procedure for downloading files. This is an example of: A. Project Execution B. Project Initiation C. Operations D. Project Control PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 2. Which of the following is NOT a characteristic

End of Chapter Quiz Question 2. Which of the following is NOT a characteristic of the Project Management Plan? A. Collection of subsidiary plans B. Formal, written communication C. Bar chart that shows the order of tasks and their resource assignments D. Must be approved by project sponsor PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 3. When is the BEST time to have project

End of Chapter Quiz Question 3. When is the BEST time to have project kickoff meetings? A. At the beginning of the project B. When each deliverable is created C. At the start of each phase D. When the Communications Management plan is approved PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 4. Which of the following is NOT an output

End of Chapter Quiz Question 4. Which of the following is NOT an output of the Close Project process? A. Project closure documents B. Project management methodology C. Project files D. Formal acceptance documentation PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 5. Customer satisfaction should be measured at the end

End of Chapter Quiz Question 5. Customer satisfaction should be measured at the end of the project to maintain long-term relationships. Which of the following is NOT always an aspect of customer satisfaction? A. The product meets its stated and unstated requirements B. The project is profitable C. The product is high quality D. The customer’s needs are met PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 6. Your client has terminated your project before it

End of Chapter Quiz Question 6. Your client has terminated your project before it is complete. Which of the following is true? A. You must stop all work and release the team immediately B. You must work with the team to document the lessons learned C. You must keep the team working on the project to give your senior management time to talk to the client D. You must update the project management plan to reflect this change PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 7. You have just been authorized to manage a

End of Chapter Quiz Question 7. You have just been authorized to manage a new project for your company. Which of the following BEST describes your first action? A. Create the work breakdown structure B. Develop the project management plan C. Develop the project charter D. Create the preliminary scope statement PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 8. Which one of the following is not one

End of Chapter Quiz Question 8. Which one of the following is not one of the process groups? A. Planning B. Verifying C. Initiating D. Closing PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 9. Which process groups typically occur only once for

End of Chapter Quiz Question 9. Which process groups typically occur only once for a project? A. Initiating, Planning, and Executing B. Planning and Monitoring and Controlling C. Initiating and Closing D. Only Initiating PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 10. Which process groups are typically conducted multiple times,

End of Chapter Quiz Question 10. Which process groups are typically conducted multiple times, in a cyclical fashion on a project ? A. Planning B. Planning, Executing, and Monitoring and Controlling C. Initiating and Closing D. Executing and Monitoring and Controlling PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com

End of Chapter Quiz Question 11. Which of the following activities is not a

End of Chapter Quiz Question 11. Which of the following activities is not a part of Initiating? A. Executing the project B. Developing Project Charter C. Identifying stakeholders D. Define high level scope PMP, CAPM, Pg. MP, PMI-SP , PMI-RMP, OPM 3 and PMBOK are registered marks of Project Management Institute, Inc Inov 8 Solutions Inc – Quality Educational Services For Professionals www. Inov 8 Solutions. com