Chapter 20 Model Predictive Control (MPC) rev. 2. 8 of May 25, 2018 by

Chapter 20 Model Predictive Control (MPC) rev. 2. 8 of May 25, 2018 by M. Miccio from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 1

Introduction on MPC Chapter 20 Ø Ø Ø Ø Introduced since 1980 It works

Introduction on MPC Chapter 20 Ø Ø Ø Ø Introduced since 1980 It works in discrete time framework It partly overcomes the need of a feedback architecture It better handles complicate dynamics (large dead time, inverse response, etc. ) present in a wide system It integrates dynamic modeling and optimization It is inherently multi-variable It may integrate feedforward control It does more than set point tracking and disturbance rejection … from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 2

Chapter 20 Side Objectives of Model Predictive Control 1. Prevent violations of constraints on

Chapter 20 Side Objectives of Model Predictive Control 1. Prevent violations of constraints on input (manipulated) and output (controlled) variables. 1. Prevent excessive movement of the input (manipulated) variables. 2. Drive some output (controlled) variables to their optimal set points, while maintaining other outputs within specified ranges. 3. If a sensor or actuator becomes not available anymore, still control as much of the process as possible. from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 3

Model Predictive Control: Chapter 20 Conceptual schematics from Control. Wiki 4

Model Predictive Control: Chapter 20 Conceptual schematics from Control. Wiki 4

Model Predictive Control: schematics of time evolution Chapter 20 y* reference trajectory Manipulated variable

Model Predictive Control: schematics of time evolution Chapter 20 y* reference trajectory Manipulated variable Figure 20. 2 Basic concept for Model Predictive Control from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 5

Model Predictive Control: Chapter 20 Calculations modules 1. The reference trajectory y*(k) is obtained,

Model Predictive Control: Chapter 20 Calculations modules 1. The reference trajectory y*(k) is obtained, based on set points calculated using Real Time Optimization (RTO). 2. Future values of state/output variables ŷ( • ) are predicted using a dynamic model of the process and current measurements at the k-th sampling instant, for a given sequence of future control inputs u(k). ŷ(k+1)=f [ŷ(k), u(k)] Ø Unlike time delay compensation methods, the predictions are made for more than one time delay ahead until the prediction horizon P ( N) Ø Inequality & equality constraints, and measured disturbances are included in the model calculations. 3. The manipulated variables u( • ) are calculated at the k-th sampling instant for a future time length set as M ( N), i. e. , the control horizon, so that they minimize a given objective function J. For example: Ø Typically, an LP or QP problem is solved from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 6

Model Predictive Control: Calculation sequence 1. At the k-th sampling instant Chapter 20 Ø

Model Predictive Control: Calculation sequence 1. At the k-th sampling instant Chapter 20 Ø The set of M “control moves”, i. e. , the values of the manipulated variables u at the next M sampling instants, {u(k), u(k+1), …, u(k+M -1)} are calculated so as to minimize the predicted deviations from the reference trajectory over the next P sampling instants while satisfying the constraints. » Ø Terminology: M = control horizon, P = prediction horizon Then, the first “control move” u(k) is implemented in plant control until the next sampling instant k+1 2. At the next sampling instant, k+1, Ø the M-step control policy is re-calculated for the next M sampling instants, k+1 to k+M, and the first control move u(k+1) is implemented. 3. Then, steps are repeated for subsequent sampling instants. This is an example of a receding horizon approach. Although a sequence of M control moves is calculated at each sampling instant, only the first move is actually implemented from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 7

Model Predictive Control Chapter 20 MPC is like … … playing chess and planning

Model Predictive Control Chapter 20 MPC is like … … playing chess and planning moves ahead 8

Real-Time Optimization (RTO) Chapter 19 Chapter 20 • • • The on-line calculation of

Real-Time Optimization (RTO) Chapter 19 Chapter 20 • • • The on-line calculation of optimal set-points, also called realtime optimization (RTO), allows the profits from the process to be maximized while satisfying operating constrains imposed on some relevant process variables. In real-time optimization (RTO), the optimum values of the set points are re-calculated on a regular basis (e. g. , every hour or every day). These repetitive calculations involve solving a constrained, economic optimization problem, based on: 1. 2. 3. A steady-state model of the process, traditionally a linear one Economic information (e. g. , prices, costs) A performance Index to be maximized (e. g. , profit) or minimized (e. g. , cost). Note: Items # 2 and 3 are sometimes referred to as an economic model.

When Should Predictive Control be Used? Chapter 20 MPC displays its main strength when

When Should Predictive Control be Used? Chapter 20 MPC displays its main strength when applied to problems with 1. Processes are difficult to control with standard PID algorithm (e. g. , large time constants, substantial dead times, inverse response, etc. ) 2. There is a large number of manipulated (u) and controlled variables (y) 3. There is significant process interactions between u and y • i. e. , more than one manipulated variable has a significant effect on an important process variable. 4. Constraints (limits) on process variables and manipulated variables are important for normal control 5. There are multiple disturbances; if they can be measured, this exploits the built-in feedforward capabilities of MPC from Seborg, Edgar, Mellichamp, Process Dynamics and Control, 2 nd Ed 11