CERN Xband TestStand Status 052010 CERN CEA PSI
CERN X-band Test-Stand Status 05/2010 CERN - CEA – PSI – SLAC
lucky us we didn’t install before March 5 th……. . 2
CLIC WS 10/2009 KM Schirm BE-RF 3
4
5
SLAC XL 5 6
CERN Supplied Components 7
RF network for test 8
CLIC WS 10/2009 KM Schirm BE-RF 9
Pulse Compressor (Gycom) KM Schirm BE-RF 10
EVM: from 10% to 80% Ø 12 GHz klystron design and production: performance up-to expectations; SLAC Ø Solid State Modulator: from order to delivery 11 m; performance o. k. ; SCANDINOVA; CEA; PSI Ø Pulse Compressor: compact design; fast production; cheap; some performance issues; GYCOM CERN Participants (minimum): Gerry, Ghislain, Stephane and Igor 11
Layout Phase 1 12
Stand alone Test Stand in CTFII Courtesy: S. Doebert Circular WG WG valve Mode converter load pump coupler Pump Tee F-Cup+Isolator 0. 5 m ACC girder Concrete block girder 0. 5 m
Components RF-Valve Courtesy: F. Peauger CEA GYCOM Pulse Compressor Courtesy: GYCOM/I. Syratchev
CLIC WS 10/2009 KM Schirm BE-RF 15
CLIC WS 10/2009 KM Schirm BE-RF 16
CLIC WS 10/2009 KM Schirm BE-RF 17
CLIC WS 10/2009 KM Schirm BE-RF 18
12 GHz Bayonet Mode converter Esurfmax=37. 2 MV/m with 150 MW input power at 11. 9942 GHz TE 10□ WR 90 Hsurfmax=140 k. A/m with 150 MW input power at 11. 9942 GHz giving DT=4. 3° with 250 ns pulse length TE 20□ Elliptical profile TE 01 O F=36. 27 mm q Half of the structure is represented q Total length = 175 mm F. Peauger – 11/02/10 19
Schedule (05/2010) ! Klystron and Modulator scheduled to arrive at CERN! !RF components and network require new strategy and more efforts! ! 12 GHz power (without compression) should be available in CTF 2 in May 2010 !12 GHz power (without compression) is available in the gallery in May 2010!
Conclusion Ø Ø Ø Installation is started and main supplies are at CERN (in time and in budget) Performance of power source better than specs RF component issues will cost time and money Structure testing still for CDR? ? Needs help (SLAC? ) The coming months will be extremely busy with the restarting of CTF 3 – will we have enough resources for commissioning the test-stand in parallel? ? 21