CERN BEABP Accelerators and Beam Physics group Report
CERN, BE-ABP (Accelerators and Beam Physics group) Report about the ATF operations training Hector Garcia Morales Jürgen Pfingstner Yves Renier 20 th of June 2012 Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Content 1. Report about the ATF operations training (Juergen) 2. ATF 2 tuning status (Yves) 3. Jitter reconstruction measurements (Hector) Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) ATF complex and control room Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Training activities • Received lectures: • Damping ring tuning, Kijoshi Kubo, 1 h • FFS design and tuning, Glen White, 3 h • Mover systems, Janice Nelson, ½ h • Cavity BPM system, ½ h, Steward Boogert • Tuning knobs, S. Kuroda, 1 h • IP beam size measurement with Wire scanner and Shintake monitor, 1 h, T. Okugi • Participation in 2 x 8 h shifts • Rest of the time: autodidactic learning (Flight Simulator) Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Flight Simulator • Software to control the ATF hardware and low-level control software • Parallel to VSYSTEM • Matlab-based • Flight Simulator can run on • Real machine • Lucretia model of the accelerator Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Flight Simulator • Advantages: • Code can be tested on the model off-line before it is used on the real accelerator. • Reduces necessary beam time and prevents on-line bugs. • Students can train themselves without using the real machine • Two interfaces available: • Control panel • Matlab terminal Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Planned experiment Garcia, Pfingstner, Renier ATF operations training
CERN, BE-ABP (Accelerators and Beam Physics group) Ground motion experiment • • Collecting of information from mainly Glen White and Yves Time stamp synchronisation of BPM and NI system via Network Time Protocol (NTP) Beam arrival system available at many location in TTL an NIM standard. Signals are clear (low noise) and triggering should be no problem Cabling will be difficult to do by ourselves. Probably has to be done by Japanese technicians. Garcia, Pfingstner, Renier ATF operations training
- Slides: 8