CCM Evolution End line assessment: preliminary findings Shankar hotel, Lazimpat Kathmandu, Nepal 23 August

CCM Evolution End line assessment: preliminary findings Shankar hotel, Lazimpat Kathmandu, Nepal 23 August 2019

Agenda Items 1. Introduction 2. Key findings – Preliminary results 3. Discussion on December

Agenda Items 1. Introduction 2. Key findings – Preliminary results 3. Discussion on December 2019 prioritization of activities for September- 2

1 Introduction 3

1 Introduction 3

Introducing the End Line Assessment • The End Line Assessment mostly focus on evaluating

Introducing the End Line Assessment • The End Line Assessment mostly focus on evaluating progress with respect to the baseline in terms of: Progress against maturity levels Progress towards achievement of project indicators Additional factors contributing towards or impeding progress Factors contributing towards, or impeding progress will also be analyzed and documented in a report. 4

How is the End Line Tool different from the Baseline • “Unpacked” existing indicators

How is the End Line Tool different from the Baseline • “Unpacked” existing indicators and reviewed thresholds per area to guarantee consistency with scoring • Emphasis on comparing progress (or lack thereof) with respect to the baseline assessment • This is to be captured in the comments section under each evolution area • The Stage 2 interview section is focused on CCM Evolution project indicators • Questions under Stage 2 have been reviewed to reflect lessons learned and results/bottlenecks identified during the baseline and implementation • Greater emphasis on requesting specific evidence for assessment results • Evidence should speak to the Evolution time frame, and should be provided with accompanying links for each document 5

Analysis: Strengthening the “So what? ” and “Why” elements Strategic Vision: Reflecting on the

Analysis: Strengthening the “So what? ” and “Why” elements Strategic Vision: Reflecting on the maturity path observed for the CCM, what will it take for the Global Fund governance model to remain relevant, responsive and effective through CCMs in the particular context given the grants’ priorities? Oversight What are the key elements that will ensure the oversight function is tailored to the grants’ priorities and aligned to relevant national systems and processes? Linkages How should the CCM be repositioned within the national landscape to contribute to a sustainable response? Engagement What are the key elements that will ensure enhanced engagement of CCM members amongst themselves and across sectors – e. g. CS being meaningfully represented. CCM Functioning What are the key elements that will ensure CCM Secretariats are well-equipped to provide the necessary support (technical and administrative) to CCMs? Overall Results What have been or could be the catalyzers/hindering factors in various contexts (Standard, transitioning, COE, grant size and focus, governance maturity, leadership and engagement). 6

2 Key findings-Preliminary results 7

2 Key findings-Preliminary results 7

Key Findings – Oversight (1) Indicator Response Baseline Indicator O. 1 Existence of an

Key Findings – Oversight (1) Indicator Response Baseline Indicator O. 1 Existence of an oversight body Engaged ind 1. b Working towards functional Indicator O. 2 The oversight body is composed of CCM members (including KP, PLWD representatives) and nonmembers Strategic ind 1. b Working towards functional Engaged Ind 1. a Functional Engaged Ind 1. c Working towards functional Indicator O. 3 The oversight body has an adequate set of skills, expertise or lived experience to ensure strategic oversight. Core skills include: (i) financial management, (ii) disease-specific expertise, (iii) procurement and supply management, (iv) program management, (v) health financing, (vi) human rights, and (vii)risk management. Indicator 0. 4 Existence of an Updated Oversight Plan that includes information on the cycle of activities (particularly site visits, interactions with PRs, and communications with the GF), specifics about prioritized indicators, data collection and analysis provisons, tools and budgets. Indicator 0. 5 The CCM Secretariat is equipped with an Oversight Officer who possesses the adequate skills to support the oversight function Indicator 0. 6 The Oversight Officer is trained on data for decision making, risk management and on understanding of co-financing data. Functional Indicator 0. 7 The Oversight Committee meets at least quarterly, as evidenced by meeting minutes. Engaged Ind 1. d Working towards functional Indicator 0. 8 The Oversight Committee reviews the performance of each PR at the time of the submission of Progress Update and Disbursement Requests (PU/DR) to the Global Fund Functional Ind 1. h Working towards functional Indicator 0. 9 The CCM OC meets/interacts quarterly on key performance topics and follows up with each PR. Engaged Ind 2. a Working towards functional 8 Indicator 0. 10 The CCM conducts quarterly site visits, which are documented. Engaged Ind 3. b Working towards functional

Key Findings – Oversight (2) Indicator 0. 11 The feedback/information obtained from site visits

Key Findings – Oversight (2) Indicator 0. 11 The feedback/information obtained from site visits informs CCM discussions and decisions. Indicator 0. 12 The CCM keeps track of co-financing commitments/requirements Indicator 0. 13 Based on data-driven discussions with the PR and other stakeholders, the oversight committee recommends actions to be considered by the CCM for decision making Response Baseline Functional Engaged Ind 3. b Working towards functional Ind 7. a Functional Ind 4. a Working towards functional Engaged ind 4. a Working towards functional Ind 5 a Working towards functional Engaged Ind 2. a Working towards functional Functional Ind 2. a Working towards functional Indicator 0. 19 The CCM participates actively (by providing technical input and contributing to discussions) in disease program reviews Functional ind 1 i Working towards functional Indicator 0. 20 The CCM implements risk oversight processes via relevant routines and structures. Functional Ind 6. a Working towards functional Indicator 0. 14 Based on data-driven discussions with the PR and other stakeholders, actions recommended inform decisions of the CCM, which are included in a plan(with deadlines, stakeholders in charge and deliverables). Indicator 0. 15 Based on data-driven discussions with the PR and other stakeholders, CCM actions are followed up on all the way to resolution Indicator 0. 16 The Oversight Committee meeting minutes show that reprogramming is being investigated Indicator 0. 17 Dated meeting minutes, reports or work plans provide evidence of frequent data-driven dialogue between the oversight committee and the PR (including, where feasible, interactions with the CT, LFA and FA) Indicator 0. 18 Dated meeting minutes, reports or work plans provide evidence of follow-up with each PR after the data-driven dialogue Indicator 0. 21 The Oversight Function has been strengthened with the appropriate tools, resources and skills 9 Engaged

Summary Key findings - From working towards functional/functional, the oversight has moved towards the

Summary Key findings - From working towards functional/functional, the oversight has moved towards the maturity level of functional to engaged/strategic in a very short period (6 months) Ø Achievements - Formation of Oversight body with different expertise skills including KPs and PLWDs, CCM members and non CCM members - Recruitment of Oversight officer with adequate skills to support oversight - Development of an oversight plan - Regular meetings and fields visits - Data driven discussion with the PR and SRs have occured 10

Summary Key findings Ø Ways forward for improvement - Review and analysis of performance

Summary Key findings Ø Ways forward for improvement - Review and analysis of performance of grant implementation with PR OC recommendation to CCM members Follow-up with PR on implementation of recommendations Share with CCM, site visit findings and follow up on action plan Additional training of Oversight officer on data analysis, risks management and co-financing data - CCM to implement risk management 11

Oversight - Factors supporting - Additional TA Recuitment of oversight officer (1 rst June)

Oversight - Factors supporting - Additional TA Recuitment of oversight officer (1 rst June) Additional resources for field visit, OC meeting Oversight strengthening plan Factors impeding - Late disbursement of funds No CCM meeting was organised due to the delay in funds disbursement Timing of the assessment is too early OC members full time official (the functionality of OC to be monitored) 12

Key Findings – Linkages (1) Indicator L. 1 Existence of a stakeholder mapping of

Key Findings – Linkages (1) Indicator L. 1 Existence of a stakeholder mapping of relevant national coordination bodies and other stakeholders. Indicator L. 2 CCM framework documents have been revised to formalize linkages with other health sector bodies. Indicator L. 3 A Mo. U or other documented agreement has been established between the CCM and National Health Structures to share information, communicate results, conduct strategic planning, or use data for decision-making. Indicator L. 4 The CCM is joining efforts with other stakeholders to realize co-financing commitments and strengthen overall financing Response Baseline Functional ind 1. a Working towards functional Functional Ind 1. c Working towards functional Functional Ind 3. b Functional Engaged Ind 1. b Working towards functional Indicator L. 5 Existence of an action plan to implement coordination and communication activities with other national coordination bodies Engaged Ind 1. b Working towards functional Indicator L. 6 Execution of an action plan on coordination and communication activities with other national coordination bodies Engaged Ind 1. b Working towards functional Indicator L. 7 Existence of a documented strategy on how to engage with the government to support the realization of commitments made for co-financing Indicator L. 8 Implementation of a documented strategy on how to engage with the government to strengthen domestic resource mobilization for the three diseases and health systems. Indicator L. 9 The main CCM functions and governance principles have been integrated in existing platforms and the principles of the GF (inclusiveness, transparency, good governance practices) are respected by this alternative body. Functional Ind 2. a Functional functional Ind 2. a Functional Ind 4. b Working towards functional 13

Summary of Key findings - Linkages Ø Achievements - Coordination with other keystakeholders to

Summary of Key findings - Linkages Ø Achievements - Coordination with other keystakeholders to secure co-financing and strengthen overall financing - Existence and execution of an action plan to implement coordination and communication with other national coordination bodies (TWGs, Provincial level) Ø Ways forward for improvement - Revision of CCM documentation to formalise linkages with other health bodies - Implementation of a documented strategy on how to engage with the government to strengthen domestic resource mobilization for the three diseases and health systems - Main CCM functions and governance principles integrated in existing platforms and the principles of the GF (inclusiveness, transparency, good governance practices) 14

Linkages - Factors supporting - Additional TA to conduct linkages assessment (March 2019) -

Linkages - Factors supporting - Additional TA to conduct linkages assessment (March 2019) - Recognition and Support from key stakeholders including government (central, and provincial levels) and external donors Factors impeding - As recommended by TA, lower priority at that time - Insufficient financial ressources (e. g. for provincial level) - Staffing readjustement at provincial level 15

Key Findings – Engagement (1) Indicator E. 1 No single CCM sector can achieve

Key Findings – Engagement (1) Indicator E. 1 No single CCM sector can achieve quorum on its own Response Baseline Engaged Ind 1. f Functional Indicator E. 2 CCM Female representation (including members and alternates) is at least 50% Functional Ind 1. c Functional Indicator E. 3 National Civil Society Sector representation comprises at least 40% of the CCM membership Strategic Ind 1. d Functional Indicator E. 4 Existence of procedures in place to replace members whose performance is unsatisfactory Strategic Ind 2. d Working towards functional Indicator E. 5 Implementation of procedures in place to replace members whose performance is unsatisfactory Strategic Ind 2. d Working towards functional Functional Ind 2. c Working towards functional Indicator E. 6 All CCM members and alternates have attended e-Learning trainings during the last six months. Indicator E. 7 Quorum was achieved in all CCM meetings (ordinary and extraordinary) held during the January - July 2019 period. Strategic Ind 2. a Not assessed Indicator E. 8 All CCM constituencies have complete documentation (which is publicly available - except in cases where information is highly sensitive with regards to key population representatives) on the transparent and inclusive process of selection/election of their representatives. Strategic Ind 1. a Not assessed 16

Key Findings – Engagement (2) Indicator E. 9 The Ministries in charge of budget

Key Findings – Engagement (2) Indicator E. 9 The Ministries in charge of budget and planning are effectively engaged in the CCM. (Effective engagement includes attendance, meaningful contribution during CCM meetings, involvement in key CCM processes (Funding Request Preparation, oversight activities, etc. ) Indicator E. 10 Presence and effective engagement of a CCM member (or members) with experience or training in RSSH (particularly Community Systems and Responses ) Indicator E. 11 All CCM constituencies have communication plans Response Baseline Functional Ind 2. e Functional Engaged Ind 1. a Working towards functional Functional Ind 3. a Functional Indicator E. 12 CCM composition analysis and available epidemiologic information show aligned representation of KAP and PLWD. Strategic Ind 1. b functional Indicator E. 13 Existence of an Mo. U or other document evidencing the engagement between the CCM CS members and their constituency members Engaged Ind 3. b Working towards Functional Indicator E. 14 The CCM Executive Committee includes membership of PLWD or KAP representatives. Strategic Ind 2. b Working towards Functional Indicator E. 15 PLWD or KAP representatives who are members of the Executive Committee have an active participation (i. e. they provide technical input and contribution to discussions) Strategic Ind 2. b Working towards Functional 17

Summary of Key findings - Engagement Ø Achievements - Different sectors representation - CSO

Summary of Key findings - Engagement Ø Achievements - Different sectors representation - CSO representation - Existence and implementation of procedures to replace CCM members with unsatisfactory performance - Quorum achieved in all CCM meeting - Transparent and inclusive process for the selection/election of constituencies - CCM member with experience in RSSH - Aligned representation of KPs and PLWDs with epidemiologic data - Documentation on CS CCM members engagement and their consituencies - Executive committee include KPs or PLWDs with active participation Ø Ways forward for improvement - Increase female representation Support ministry of finance for active engagement Support and encourage CCM members to take e-learning courses 18

Engagement - Factors supporting - TA from APCASO to support constituencies engagement (April to

Engagement - Factors supporting - TA from APCASO to support constituencies engagement (April to December 19) - Financial resources were dedicated for constituencies engagement - Pro-activeness of consituencies and support from regional network (e. g MSM/TG, APCOM is supprting) - Strong support from CCM secretariat and Executive comittee Factors impeding - None to mention but language barriers/diversity have to be considered 19

Key Findings – Functioning (1) Indicator Response Baseline Indicator F. 1 All CCM members,

Key Findings – Functioning (1) Indicator Response Baseline Indicator F. 1 All CCM members, alternates and secretariat staff have received training about the Co. I Management Policy Strategic Ind 7. a Working towards functional Indicator F. 2 All CCM members, alternates and secretariat staff have received training about the Co. C Functional Ind 7. a Working towards functional Indicator F. 3 The CCM has comprehensive operating procedures and TORs for all committees/working groups Engaged Ind 1. a Functional Indicator F. 4 The CCM has updated its Conflict of Interest Management Policy Strategic Ind 6. b Functional Indicator F. 5 The CCM has adopted and endorsed the Code of Ethical Conduct for CCM members Functional Indicator F. 6 All CCM members, alternates and secretariat staff have signed the annual Co. C compliance declarations Functional Ind 6. a Working towards functional Indicator F. 7 The Eligibility and Performance Assessment (EPA) Improvement Plan is updated on a regular basis. Engaged Ind 4. d Working towards functional Indicator F. 8 The CCM Contacts are updated on a regular basis. Engaged Ind 4. d Working towards functional Indicator F. 9 All CCM members, alternates and secretariat staff have signed the annual Co. I Management compliance declaration Strategic Ind 7. b Functional Indicator F. 10 Existence of an Ethics focal point (who must be a CCM member) or a small Ethics Committee (ideally not more than three members). 20

Key Findings – Functioning (2) Indicator F. 11 Existence of a costed CCM work

Key Findings – Functioning (2) Indicator F. 11 Existence of a costed CCM work plan which includes activities funded by other donors and national government Indicator F. 12 All CCM members have participated in the three tiers of the CCM Orientation Program managed by the GF Indicator F. 13 All CCM alternates have participated in the three tiers of the CCM Orientation Program managed by the GF Indicator F. 14 The Co. I Management Policy is applied consistently to all CCM members, alternates and secretariat staff. Indicator F. 15 The Co. C is applied consistently to all CCM members, alternates and secretariat staff. Response Engaged Baseline Ind 2. a Working towards functional Functional Ind 3. a Functional Engaged Ind 6. b Functional Ind 6. a Working towards Functional Ind 4. a Working towards functional Indicator F. 16 The CCM assesses annually the overall CCM Secretariat Performance. Engaged Indicator F. 17 In the context of CCM Funding, the annual work plan and financial reports are submitted to the GF (FPM, CCM Hub) on-time. Strategic Ind 4. c Functional Strategic Ind 4. b Functional Engaged Ind 4. b Functional Indicator F. 18 All agendas CCM meetings (plenary and Oversight Committee) of the last 12 months were circulated to all CCM members/alternates and GF Secretariat at least 7 calendar days before the meeting. Indicator F. 19 All CCM meeting minutes (plenary and Oversight Committee) of the last 12 months were circulated to all CCM members/alternates and GF Secretariat at most 7 calendar days after the meeting. 21

Key Findings – Functioning (3) Indicator Response Baseline Indicator F. 20 All CCM meeting

Key Findings – Functioning (3) Indicator Response Baseline Indicator F. 20 All CCM meeting minutes in the past 12 months include evidence of the application of procedures to prevent, manage and mitigate Co. I (especially members recusing from discussions in which they may have potential Co. I) Strategic Ind 9. a Functional Indicator F. 21 The CCM has an endorsed communications plan Engaged Ind 5. a Functional Indicator F. 22 The CCM communications plan has been Implemented in a timely manner (no major activity has more than 3 months of delay). Engaged Ind 5. a Functional Ind 3. b Functional Indicator F. 23 All CCM Executive Committee members have recieived training in leadership topics or have completed the Executive Committee Module of the CCM Orientation Program. 22

Summary of Key findings - Functionning Ø Achievements - All CCM members trained on

Summary of Key findings - Functionning Ø Achievements - All CCM members trained on COI ROB revised and endorsed COI policy updated All CCM members have signed COI policy applied to all CCM members EPA improvement plan was updated in July 2019 CCM member’s contact list updated in August 2019 Existence of CCM workplan CCM secretariat performance assess annually CCM timely reporting on CCM budget expenses and workplan CCM agenda circulated 7 days before the meeting and CCM minutes circulated within 14 days after the meeting - Communication plan updated in June 2019 23

Summary of Key findings – Functionning (2) Ø Ways forward for improvement - Co.

Summary of Key findings – Functionning (2) Ø Ways forward for improvement - Co. C implementation to be formalised with endorsement by CCM, training signature of Co. C compliance declaration - CCM members and alternate who have not received CCM orientation should be trained - Executive committee members to take the Executive training module 24

Functioning - Factors supporting - Support from CCM hub and CT for CCM orientation

Functioning - Factors supporting - Support from CCM hub and CT for CCM orientation (March 2019) Commitment of new CCM coordinator Support from CCM executive committee and CCM Support from CCM evolution push CCM to engage more Factors impeding - Co. C is a new policy - CCM member availabilty (full time employment) - Late funds disbursement (change of FA) 25

Overall results – What have been the catalyser or hindering factors Catalyser factors -

Overall results – What have been the catalyser or hindering factors Catalyser factors - Commitment of CCM secretariat and CCM - Additional staffing of CCM secretariat with adequate skill to support CCM - Additional financial resources to strenghten oversight, support constituencies engagement - Active engagement and participation of CSOs and governement Hindering factor - Late disbursement of funds which led to delay in implementation in particular for oversight 26

3 Discussion on prioritization of activities for September-December 2019 27

3 Discussion on prioritization of activities for September-December 2019 27

CCM strengthening work plan - Review of the work plan and prioritization of the

CCM strengthening work plan - Review of the work plan and prioritization of the activities for the period September to December 2019 Nepal/Document/End Line assessment/Nepal_Validated. Work. Plan. xlsx 28

Proposed Process for Post-mission work What By whom Participate in a post-mission debrief with

Proposed Process for Post-mission work What By whom Participate in a post-mission debrief with the CCM Hub and Country Team representatives. Consultants, in coordination with TA providers, CCM Hub and CT focal points Submitting the completed End Line Assessment Tool, validated documentation to serve as evidence for assessment findings and results, and a brief report using the online form provided by the Global Fund. Consultants, in coordination with TA providers and the CCM Hub focal points 29