CCAMP Working Group Status Chairs Lou Berger lbergerlabn
CCAMP Working Group Status Chairs: Lou Berger <lberger@labn. net> Deborah Brungard <db 3546@att. com> 79 th IETF CCAMP WG 1
WG Process - Reminder • Chairs/Secretary moved to IETF tools (Trac) site for WG process management • Supplemental information (including list of Communications and Liaisons) moved to wiki: • http: //trac. tools. ietf. org/wg/ccamp/trac/wiki • Document status being tracked via Trac ticket system • Starting when document enters last call (so far) • http: //trac. tools. ietf. org/wg/ccamp/trac/report/3 • Authors will be assigned as owners when there are open actions • Communications and Liaisons also being tracked via tickets • Just incoming for now • Open process (think wikipedia) • Any one can read • Logged-in users can modify wiki and tickets • Suggest new wiki content be coordinated with chairs/secretary or via WG mail list • This will become required if open modify policy is abused 79 th IETF CCAMP WG 2
Document Status • WG document status is always available at http: //tools. ietf. org/wg/ccamp/ • Process reminder: WG LC Chairs IESG/ADs IETF LC RFC Editor RFC 79 th IETF CCAMP WG 3
Document Status – RFCs • Recent RFCs: • RFC 6001 GMPLS Extensions for Multi-layer and Multiregion Networks (MLN/MRN) • RFC 6002 GMPLS Data Channel Switching Capable (DCSC) and Channel Set Label Extensions • RFC 6003 Ethernet Traffic Parameters • RFC 6004 GMPLS Support for Metro Ethernet Forum and G. 8011 Ethernet Service Switching • RFC 6005 GMPLS Support MEF and G. 8011 UNI • In RFC Editor’s Queue: • draft-ietf-ccamp-gmpls-ethernet-pbb-te-06 79 th IETF CCAMP WG 4
Document Status In RFC Editor’s Queue: • draft-ietf-ccamp-lsp-hierarchy-bis 79 th IETF CCAMP WG 5
Document Status – IESG Processing 79 th IETF CCAMP WG 6
Document Status – Post WG Last Call • draft-ietf-ccamp-gmpls-vcat-lcas • Waiting on chairs for Proto write-up • draft-ietf-ccamp-rwa-wson-framework • Waiting on chairs for Proto write-up • draft-ietf-ccamp-gmpls-g-694 -lambda-labels • Waiting on chairs for Proto write-up • draft-ietf-ccamp-gmpls-ted-mib • Document updated • Pending review of MIB DR • Update expected within a few weeks • Will need another LC (joint with MPLS) • draft-ietf-ccamp-mpls-tp-cp-framework • Completed 1 st joint LC with PWE 3 and MPLS • Liaison received from ITU-T, updated • 2 nd Last Call on-going 79 th IETF CCAMP WG 7
WG Drafts Not on Agenda • draft-ietf-ccamp-rsvp-te-eth-oam-ext • draft-ietf-ccamp-rsvp-te-mpls-tp-oam-ext • draft-ietf-ccamp-rsvp-te-sdh-otn-oam-ext 79 th IETF CCAMP WG 8
WG Drafts on the Agenda • • • draft-ietf-ccamp-assoc-info draft-ietf-ccamp-dpm draft-ietf-ccamp-rwa-info draft-ietf-ccamp-rwa-wson-encode draft-ietf-ccamp-wson-signaling draft-ietf-ccamp-general-constraint-encode draft-ietf-ccamp-wson-signal-compatibility-ospf draft-ietf-ccamp-wson-impairments draft-ietf-ccamp-gmpls-g 709 -framework draft-ietf-ccamp-lmp-behavior-negotiation draft-ietf-ccamp-oam-configuration draft-ietf-ccamp-rsvp-resource-sharing 79 th IETF CCAMP WG 9
Communications Sent/Received • ITU-T SG-15 Liaison • G 709 Transitional Links • OIF Communication • Letter received 11/2 • MEF and IEEE • Need to send informal communications on Ethernet documents • Links: • Wiki: http: //trac. tools. ietf. org/wg/ccamp/trac/wiki/Comms. Lias ons • Tickets: http: //trac. tools. ietf. org/wg/ccamp/trac/report/3 • Please review the incoming documents and comment on ccamp@ietf. org 79 th IETF CCAMP WG 10
MPLS-TP • MPLS-TP work continues • Joint work • • • MPLS WG PWE 3 WG CCAMP WG L 2 VPN WG OPSA WG • Joint meetings to discuss MPLS-TP • Appear as “MPLS” and, if needed, PWE 3 on the agenda • Covers all I-Ds for all working groups 79 th IETF CCAMP WG 11
Future MPLS-TP Control Plane Work • Expect new work based on TP-CP Framework • Draft identified open areas which will be addressed through normal WG process (already happening) • Includes RFC 5467 • Asymmetric bandwidth bidirectional LSPs • Published as experiment, • Standards Track needed for MPLS-TP: (WG document) • draft-takacs-ccamp-asymm-bw-bidir-lsps-bis • Reminder: Pick the right WG • CCAMP: LSP Control Plane • PWE 3: PW Control plane 79 th IETF CCAMP WG 12
Other Items • draft-shiomoto-ccamp-switch-programming: will be Individual Submission • Comments requsted, non received • Recent Disclosures (http: //www. ietf. org/ipr/) • Per http: //tools. ietf. org/html/rfc 3979 • RFC 5495 • draft-ietf-ccamp-rsvp-te-eth-oam-ext • Non-LSP RSVP now in CCAMP • draft-ietf-ccamp-assoc-info • draft-ietf-ccamp-rsvp-resource-sharing 79 th IETF CCAMP WG 13
- Slides: 13