CAUSES OF CLAIMS AND AVOIDANCE N D Sharma 12/15/2021 1

CAUSES OF CLAIMS AND AVOIDANCE N D Sharma 12/15/2021 1

CLAIM A Claim is a request for reimbursement of cost and / or time

CLAIM A Claim is a request for reimbursement of cost and / or time from one Party to another. This may be for a progress payment or a variation, or something else Under the Contract either party may have a claim’ (PPMO SBD does not envision Employer’s Claim) 12/15/2021 2

CLAIMS Contract provides for procedures making contractual claims by the contractor arising out of

CLAIMS Contract provides for procedures making contractual claims by the contractor arising out of including: • A response to events which the contractor was not required to anticipate • For additional payment or additional time • The legal/contractual consequence of events 12/15/2021 3

CLAIMS Contractual Claims include: • Additional work claims – cost & profit • Damages

CLAIMS Contractual Claims include: • Additional work claims – cost & profit • Damages claims – cost only • Neutral risk claims – time only Common Legal (outside the Contract) Claims: • Claims in tort • Ex- Gratia 12/15/2021 4

CLAIMS Claims may be arising out of several factor including: • Manner in which

CLAIMS Claims may be arising out of several factor including: • Manner in which contract was secured (Low bidding ) • The Engineer and roles in designing • The level of definition of the scope of works • Political aspects • Legal / contractual 12/15/2021 5

CAUSES OF CLAIMS • Inability to recognize all the risks and failure to deal

CAUSES OF CLAIMS • Inability to recognize all the risks and failure to deal adequately with those including their sharing amongst the contracting parties • Risks being either ignored or dealt with arbitrarily • Employer’s tendency to own all the rights and shift risks and obligations to the contractor • Inadequate pre-bid investigations; developing projects hastily not knowing the potential risks 12/15/2021 6

RISKS OWNERSHIP FIDIC/PPM O Cls. 1. 9/20. 1 and 42© 1. 9 2. 1/21

RISKS OWNERSHIP FIDIC/PPM O Cls. 1. 9/20. 1 and 42© 1. 9 2. 1/21 4. 7 Risk Delayed drawings and instructions Employe Contr r actor √ Error in Employers requirements Right of access to the site √ Setting out √ 12/15/2021 √ √ √ 7 Unforeseeable physical

RISKS OWNERSHIP FIDI/PPMO Risk Cls. Fossils 4. 24 Employ Contrac er tor √ 7.

RISKS OWNERSHIP FIDI/PPMO Risk Cls. Fossils 4. 24 Employ Contrac er tor √ 7. 4/42 and 33 Testing delays by the √ Employer 7. 5 /35. 5 Def Rejection of Materials 7. 6/34 Remedial works 8. 4(a)/27. 1 12/15/2021 Extension for time for √ completion - Variation √ √ 8

RISKS OWNERSHIP FIDIC/PPMO Cls 8. 4(b)/na 8. 4(e)/na 8. 4(d)/na 12/15/2021 Risk Employer Contr

RISKS OWNERSHIP FIDIC/PPMO Cls 8. 4(b)/na 8. 4(e)/na 8. 4(d)/na 12/15/2021 Risk Employer Contr actor Extension for time for √ completion – delay giving entitlement to EOT Exceptionally adverse √ climatic conditions Unforeseeable √ shortages and the availability of personnel or goods 9

RISKS OWNERSHIP FIDIC/PP MO Cls 9. 4/33 Risk Employer Contra ctor Failure to pass

RISKS OWNERSHIP FIDIC/PP MO Cls 9. 4/33 Risk Employer Contra ctor Failure to pass Tests on √ Completion 11. 4/35 Failure to remedy Defects 12. 1 and 14. 1/37 and 38 Increase of quantities 12/15/2021 √ √ 10

RISKS OWNERSHIP FIDIC/PPM Risk O Cls Employe Contra r ctor 12. 4/na Omission of

RISKS OWNERSHIP FIDIC/PPM Risk O Cls Employe Contra r ctor 12. 4/na Omission of work through a Variation Failure to pass tests after Completion Variation procedure √ Adjustment for changes in legislation Adjustment for changes in cost √ √ 12. 4 13. 3/37 and 38 13. 7/45 13. 8/45 12/15/2021 √ √ 11

RISKS OWNERSHIP FIDIC/PP MO Cls 14. 8/41 Risk 15. 4/61 Payment after Termination 17.

RISKS OWNERSHIP FIDIC/PP MO Cls 14. 8/41 Risk 15. 4/61 Payment after Termination 17. 1 Indemnities 17. 2/na Care of the Works prior to the Taking Over Certificate 12/15/2021 Delayed payment Employer Contract or √ √ √ 12

RISKS OWNERSHIP FIDIC/PPMO Risk Cls Employer Contrac tor 17. 4/11 Consequences of Employer's risks

RISKS OWNERSHIP FIDIC/PPMO Risk Cls Employer Contrac tor 17. 4/11 Consequences of Employer's risks √ 19. 4/42 Consequences of force majeure √ 20. 1/na Contractor's claims √ 12/15/2021 13

CAUSES Of CLAIMS • Awards of contracts going to very low rate bidding contractors,

CAUSES Of CLAIMS • Awards of contracts going to very low rate bidding contractors, looking for opportunity to put in claims leading to disputes. • Inefficient contract administration on the part of the Employer/Purchaser • Force-Majeure conditions not recognized. • Failure on the part of the actors of the contract to timely discharge their duties and meet contractual obligations 12/15/2021 14

CLAIM TIMELINE • If the Contractor considers himself to be entitled to an EOT

CLAIM TIMELINE • If the Contractor considers himself to be entitled to an EOT or addition payment or both, he must give notice to the Engineer as soon as practicable and “not later than 28 days after the Contractor became aware, or should have become aware, of the event or circumstance” giving rise to the claim. If he fails to make claim on time he is not entitled to it. 12/15/2021 15

CAUSES OF CLAIMS AND AVOIDANCE OF CLAIMS 12/15/2021 16

CAUSES OF CLAIMS AND AVOIDANCE OF CLAIMS 12/15/2021 16

AVOIDANCE OF CLAIMS • Parties must know their contracts well; • ‘Every contract is

AVOIDANCE OF CLAIMS • Parties must know their contracts well; • ‘Every contract is unique’; though this saying is somewhat diluted by the introduction of SBDs, elaborate regulations (PPR) and the PPA • Parties must understand that they are at par as sovereign partners of the contract, to be regulated by their contract and the governing law. 12/15/2021 17

AVOIDING CLAIMS Avoidance of Claims through Contract Administration • • • Drawings, information and

AVOIDING CLAIMS Avoidance of Claims through Contract Administration • • • Drawings, information and ‘Holds’ Approvals Ground conditions Relationships Consultants’ performance Access to works Public authority / government bodies Payment The manner in which early problems are dealt with Performance of nominated sub-contractors 12/15/2021 18

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • carefully review the bidding

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • carefully review the bidding documents including drawings and specifications; • price the job adequately to make fair profit; • manage and perform contract with due diligence; • respect specifications and instructions; 12/15/2021 19

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • use materials, plant as

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • use materials, plant as specified and ensure quality; • take care of works in progress by appropriate measures; • comply with all applicable laws, regulations including safety related; 12/15/2021 20

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • inform the Employer in

AVOIDING CLAIMS Avoidance of Claim Situations by Contractor’s Actions: • inform the Employer in advance whenever an event occurs which is likely to increase the cost of the works and or the time of completion; • remedy defects well before expiry of the defect liability/ defect notification or warranty period; and • present claims, if any, in a timely manner. 12/15/2021 21

AVOIDING CLAIMS Avoidance of Claim Situations Good documentation: CONTRACTOR’S PROGRAM • Reflect Contract requirements

AVOIDING CLAIMS Avoidance of Claim Situations Good documentation: CONTRACTOR’S PROGRAM • Reflect Contract requirements • Include Contract milestones • Show sequence of works • Incorporate resource and other constraints • Supported by Method Statement 12/15/2021 22

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • inform and instruct bidders on

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • inform and instruct bidders on the procedure for preparation and submission of bids; • describe the standards required; • inform bidders of the criteria for evaluating bids; and • also inform that the only bidder having the experience and capacity to execute the 12/15/2021 23

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • in the case of works,

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • in the case of works, provide detailed site investigation report and other information related to the site of which the Employer is in possession • define the conditions of contract and method of payments; • describe procedures for acceptance of final products ; • and for issuance of contract amendments 12/15/2021 24

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • define adequately quality control procedures

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • define adequately quality control procedures • inform about the rights and duties of the parties and the remedy against defaulter • provide for amicable settlement, adjudication and arbitration mechanisms for settlement of disputes FIDIC- Based conditions stipulate that: – an independent Engineer, empowered with authority to administer the contract with some pre-disclosed restrictions, will supervise the contract. 12/15/2021 25

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • the Employer has produced a

AVOIDING CLAIMS Employer’s Actions at. thé Procurent Stage: • the Employer has produced a design for the work through a competent Engineer • the possession of site and access thereto will be made available as specified in the documents or within reasonable time so that the activities as scheduled would not be adversely affected 12/15/2021 26

EMPLOYER’S CLAIM Employer’s Claim: • Entitlement: under any Clause of the contact or otherwise

EMPLOYER’S CLAIM Employer’s Claim: • Entitlement: under any Clause of the contact or otherwise in connection with the Contract. • No time bar for the notice (should be given as early practicable- can be given by the Employer or by the Engineer • Engineer to refer to engineer for determination! 12/15/2021 27

Engineer's Supremacy • Employer is denied to set off against or make any deduction

Engineer's Supremacy • Employer is denied to set off against or make any deduction from a certified amount or otherwise claim against the Contractor unless done in accordance with the contract provisions under Clause 12/15/2021 28

HANDLING OF CLAIMS Employer and Contracor’s Joint Actions: • • • Keep good record

HANDLING OF CLAIMS Employer and Contracor’s Joint Actions: • • • Keep good record systems and agree on facts Respond to challenges / issues promptly Monitor progress Establish claims systems and procedure Review resourcing Do not assume everything will come good at the end of the day • Settle amicably or go for adjudication 12/15/2021 29