CATHI Marie Curie Initial Training Network Cryogenics Accelerators

  • Slides: 14
Download presentation
CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Guillaume KAUTZMANN

CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Guillaume KAUTZMANN (BE/ABP/SU)* WP 4, ESR 6 Mid Term Review Meeting, 26 September 2012 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010264330 -CATHI) Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 1

Outline Background Activities at CERN LINAC Other Training Contacts Publications Future Work and Trainings

Outline Background Activities at CERN LINAC Other Training Contacts Publications Future Work and Trainings Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 2

Background Previous Education: 2009: Masters of Science in Topography National Institute of Applied Science,

Background Previous Education: 2009: Masters of Science in Topography National Institute of Applied Science, Strasbourg, France Work Experience: 2010 -sep. 2011: Instrumentation Engineer on the construction of the french nuclear research facility “Laser Mega. Joule” Soldata, Bordeaux, France Jan. 2009 -Sep. 2009: Master Thesis and working in GPS and Airborne Surveying Methods Fugro Geoid, Montpellier, France Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 3

Activities at CERN LINAC – Alignment Specifications • • Alignment and monitoring of the

Activities at CERN LINAC – Alignment Specifications • • Alignment and monitoring of the Cavities and Solenoids in the Cryomodules Alignment w. r. to a common nominal beam line (NBL) along the Linac Permanent system Precision demanded along radial and height axis at 1 sigma level : Ø 300 microns for the Cavities Ø 150 microns for the Solenoids NBL ~16 m +/-150 micr +/-300 micr Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 4

Activities at CERN LINAC – Alignment Concept Proposed concept: Hardware: - BCAM based observation

Activities at CERN LINAC – Alignment Concept Proposed concept: Hardware: - BCAM based observation - Metrological tables - Targets - Viewport crossing Conditions: - Cryogenic - High Vacuum 3 D Reconstruction Software Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 5

Activities at CERN LINAC – Specific (1/2) BCAM Studies: Field of view issue Development

Activities at CERN LINAC – Specific (1/2) BCAM Studies: Field of view issue Development of a new BCAM called HBCAM Technical specification + Technical Visit to Brandeis (USA) Viewports studies: Tests to check the viewport qualities Tests to check and validate theoretical models in order to correct the effects on the optical measurements Deformation Liberec University (Czech Republic) + CERN TE/MSC-CMI Target studies: Studies of different target types Two types are going to detailed conception Cryotest with Mario Herrmann (TE/VSC) Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 6

Activities at CERN LINAC – Specific (2/2) Software: Participation on the reconstruction software done

Activities at CERN LINAC – Specific (2/2) Software: Participation on the reconstruction software done by S. Waniorek (BE/ABP/SU) Test bench: Needed to : - Validate theoretical foundation of the software - Test of the different hardware parts First results promising on the comparison reference measurement/ Reconstructed position by the software Integration: Implication in several decisions regarding the integration of the alignmnent system in the tunnel Integration of the alignment system to the Cryomodule design Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 7

Activities at CERN Other Cryomodules Assembly: Participation on the survey and alignment for: -

Activities at CERN Other Cryomodules Assembly: Participation on the survey and alignment for: - Assembly chain of the cryomodules - Clean room design Transfer lines: Participation on Transfer lines Working Group Special focus on the alignment of elements between magnets Inter Tank: Participation on Diag. Box Working Group Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 8

Training (1/2) First months: Familiarization phase with the survey methods and CERN administrative procedures

Training (1/2) First months: Familiarization phase with the survey methods and CERN administrative procedures Training courses: “Radiological Protection Course”@ CERN; “Self-Rescue Mask (Biocell)” @ CERN; “Post-induction training (HRT, EDH, EDMS, INDICO and CDS)” @ CERN; “Project Engineering” @ CERN; Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 9

Training (2/2) Technical Visit: ATLAS Experiment visit where a BCAM solution is implemented; Brandeis

Training (2/2) Technical Visit: ATLAS Experiment visit where a BCAM solution is implemented; Brandeis University (Waltham, Massachusetts, USA); Open Source Instrument (Waltham, Massachusetts, USA); Tevatron (Fermilab, Illinois, USA); Conference, Seminars, Workshop: “ 12 th International Workshop on Accelerator” @ Fermilab, Batavia, U. S. A (September 10 -14, 2012); Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 10

Contacts - with other MC Fellows - with other CERN Departments, principally TE -

Contacts - with other MC Fellows - with other CERN Departments, principally TE - outside CERN: Meca-Test (mechanical company, Switzerland) for the target development; STPS (mechanical company, France) for the test Bench; EREO (optics) for the development of tools for window adjustment; OSI for the development of new BCAM; Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 11

 Publications Technical specification: “HIE-ISOLDE Specification for the development Of HBCAM” EDMS N°: 1231567;

Publications Technical specification: “HIE-ISOLDE Specification for the development Of HBCAM” EDMS N°: 1231567; IWAA 2012: 1. “The HIE-ISOLDE Alignment and monitoring system Software and test mock up” (primary author + presentation); 2. “HIE-ISOLDE Alignment and Monitoring System Technical Design and Project Status” (primary author); Cryomodule design Working Group: 1. “HIE-ISOLDE Cryomodule Technical Review -The Alignment System - April 26 th, 2012”, EDMS N°: 1214768, (Participation on the presentation support); 2. “News on BCAM tests – December, 15 th, 2012”; Beam department newsletter: Article in the life section - September 2012 Several presentations for working groups, security, quality… Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 12

Future Work and Training Work: Extend the test Bench; HBCAM development; Participation on metrological

Future Work and Training Work: Extend the test Bench; HBCAM development; Participation on metrological table design; Survey for Cryomodule assembly, clean room, … Training: “Cern Accelerator School”@ Granada University (October 29 th to November 9 th, 2012); Secondment: - Brandeis University (Waltham, Massachusetts, USA); Presentation skills; Programming in C++; Travailler en salle propre… Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 13

Thanks for your attention Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 14

Thanks for your attention Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN 14