Case Study Large Automotive OEM FMEA Managed Service













- Slides: 13
Case Study Large Automotive OEM – FMEA Managed Service
Failure Mode & Effects Methodology Process Flow Block Diagram Customer Requirements Design Inputs Process FMEA System FMEA Control Plans Shop Floor Checklists © 2010 Omnex Inc 2
Automotive OEM – FMEA Managed Service Design Failure Mode and Effects Analysis -- Distribution of Recommended Actions Before AQP © 2010 Omnex Inc After AQP 3
Initial Quality of U. S. and Import Brands 1999 -2010 Note: Import Brands Include Europe and Asia
Case Study Large Aerospace Engine Manufacturer
New Product Introduction & PPV Program Start Experimental Product & Process Planning Production PPV Activities Consolidation Planning Product Design and Dev. Ongoing Part & Process Control Process Design and Development Industrialization Product and Process Validation Production Corrective Action Board activity Plan & Define Program © 2010 Omnex Inc Product Design & Development Verification Process Design & Development Verification Product & Process Validation CAB Activity 6
Large Aerospace Engine Manufacturer • Conducting PPV (Product and Process Validation including FAI) training and facilitation for internal resources and 200 suppliers • Rollout PPV to ensure product and process conformance for all new products • Currently in initial stages – 10% to 30% improvement expected in RCNs
Case Study Truck – System Supplier
Operations Excellence MANUFACTURING Materials FUNCTIONAL EXCELLENCE Purchasing Quality 6 S/VISUAL WORKPLACE FOUNDATIONAL EXCELLENCE © 2010 Omnex Inc Team Skills QOS Global 8 D TS 16949/APQP/PPAP 9
Truck Industry Large Sub System Provider 187 DPM Improvement Before After Comments Quality Rejects measured in percentages 3 Years – 187 PPM Implementation of APQP and PPAP internally and with Supply Base
Semiconductor Industry Transition Semiconductor Assembly Council – Representing 95% of Chip Industry Outside Japan
Semiconductor Industry Methodology 8 -D Customer Involvement Similar to Aerospace Industry MSA, SPC, and Process Control ISO TS 16949 plus APQP and PPAP © 2010 Omnex Inc 12
Customer Driven Changes: 1998 to 2004 • Productivity improvements: 10% – 30% – Equipment – People • Yield improvement – Subcontractor yields improved to 99. 6% • Performance to schedule improvement – Consistently sustaining 100% • Number of customer complaints decreased – Up to 15 x reduction • PPM improved by over 100 times to under 30 PPM © 2010 Omnex Inc 13