Master Plan for Sevan • Since early 90 s, Armenian Government has been working

Master Plan for Sevan • Since early 90 s, Armenian Government has been working to prepare a master plan with the help of international organizations • Major objectives of the master plan: – – – Raising the water level Regulating and managing industrial waste Revitalizing the wetlands Increase public awareness Sewage treatment plants for 4 major towns around Lake Sevan (Sevan, Gavar, Martuni, Vardenis)

Recent Model In March 2008, the Civil Engineering Committee launched a project to provide

Recent Model In March 2008, the Civil Engineering Committee launched a project to provide proper sewer system designs and building guidelines for small villages in Armenia and Artsakh AESA provided plans that can be scaled up or down to accommodate each village according to its size, population, and topography

Tzitzernavank Project • Plans were implemented for a 50 person • • school in

Tzitzernavank Project • Plans were implemented for a 50 person • • school in Tzitzernavank in a village in Artsakh The design converts the sewer black water to grey water before it is disposed into the ground Contaminants in the outflow water of the sewer need to be brought down to comply with current standards in Armenia

Typical Sewage Disposal Design

Typical Sewage Disposal Design

Future Plans • AESA initially will select a few villages, provide plans, and help

Future Plans • AESA initially will select a few villages, provide plans, and help implement proper sewer disposal systems tailored to their specific needs • AESA will target villages in the Lake Sevan area to increase public awareness and help protect the environment • AESA will introduce local villages to modern methods of sewer and waste disposal systems, such as the waterless toilets and sewer treatment options

Funding • Initial funds will be used for a detailed case study and generating

Funding • Initial funds will be used for a detailed case study and generating proposals for grants • Funds will be secured from private sponsors, government agencies, and other institutions to implement the project on select villages • The success of the initial project will lead to more support and implementation on a larger scale