CAPTIVE SPV PROJECT IN TELANGANA index • CONSUMPTION PATTERN • CAPTIVE OPEN ACCESS REQUIREMENTS

CAPTIVE SPV PROJECT IN TELANGANA index • CONSUMPTION PATTERN • CAPTIVE OPEN ACCESS REQUIREMENTS • POWER FLOW & KEY TRANSACTION COVENANTS • RFP TIMELINES • SPECIAL CONDITIONS OF CONTRACT • QUALIFICATION REQUIREMENT OF BIDDER

CONSUMPTION PATTERN • KRIT & INTIME BUILDINGS CONSUMPTION PATTERN HVAC+C Company Total Client A

CONSUMPTION PATTERN • KRIT & INTIME BUILDINGS CONSUMPTION PATTERN HVAC+C Company Total Client A KRIT 82. 63 53. 12 29. 50 Intime 38. 32 28. 38 9. 94 Total *- All figures in Million units (MUS), Data for FY 17 -18 120. 96 81. 51 39. 44 • Out of 39. 44 MUS which is consumed by HVAC & CA, around 19 -20 MUS is consumed in the day time when solar power can be generated. • Solar Plant of approx. 12 -13 MW (AC) would be required for sufficing this requirement.

Captive open access requirements • Electricity Act Framework • EA 2003 - Load having

Captive open access requirements • Electricity Act Framework • EA 2003 - Load having more than 1 MVA are eligible for Open access through third party or Captive mode • EA 2003 - Minimum 26% Equity in the SPV & Minimum 51% Consumption from the plant • Telangana Regulatory Framework • Regulations no. 3 of 2018 - Forecasting & Scheduling Regulations for Solar projects • Telangana Solar Policy 2015 - Wheeling charges & Transmission charges are waived off for Solar Projects upto the project commissioned till May-2020. • Draft Regulations published by TSERC for Single point Open Access. (Draft Amendment to Regulations no. 4 of 2013). Final Regulations expected by August-18 end.

POWER FLOW & KEY TRANSACTION COVENANTS Units consumed in B – Units generated in

POWER FLOW & KEY TRANSACTION COVENANTS Units consumed in B – Units generated in A = Units charged by DISCOM to KRC Solar Park A DISCO M B KRC / Intime Connections HVAC & Common Area C C Tenant 1 Tenant 2 Tenant 3 Tenant 4

POWER FLOW & KEY TRANSACTION COVENANTS • Key Transaction Covenants üBuy 60 -65 Acres

POWER FLOW & KEY TRANSACTION COVENANTS • Key Transaction Covenants üBuy 60 -65 Acres land üDeploy Solar Park assets with capacity of 13 MW generating 20 million units annually üEnergy generated will be used for KRIT & INTIME captive consumption i. e. Common Area & HVAC.

RFP TIMELINES # Activity Day Tentative Date 1 Day 1 15/10/2018 29/10/2018 3 Commencement

RFP TIMELINES # Activity Day Tentative Date 1 Day 1 15/10/2018 29/10/2018 3 Commencement of sale of RFP Pre- Bid Queries from interested bidders Pre-Bid Meeting Day 15 Day 20 4 Response to the Bidder’s queries Day 25 5 Submission of Technical & Price Bids 6 Opening of the Technical Bids 7 Declaration of Technically qualified bidders 8 Opening of the Price Bids 9 Award of Contract / WO/ LOI 10 Commissioning of Project 2 Day 40 3/11/2018 14/11/2018 23/11/2018 30/11/2018 Day 45 Day 50 10/12/2018 Day 55 Within 7 days of the Declaration of successful bidder, Issue of WO- within 15 days Day 295 8 months from date of execution of WO

SPECIAL CONDITIONS OF CONTRACT … 1 • Major Items in Solar PV Plant üSolar

SPECIAL CONDITIONS OF CONTRACT … 1 • Major Items in Solar PV Plant üSolar PV Modules üDC Cables, Inverters , AC Cables üTransformer, Control Room & SCADA Monitoring system üSuitable EHV / HV substation for Evacuation • Scope of Work- Contractor üIdentifying the adequate land parcel in Telangana üGeotechnical Study & Topographic Survey of the land üAll Land Approvals üAll Captive Open Access & Evacuation Approvals üSuccessful Commissioning of 13 MW Solar PV Plant ü 5 years O&M of the plant

SPECIAL CONDITIONS OF CONTRACT… 2 • Generation Guarantee ü 1. 6 Million units /

SPECIAL CONDITIONS OF CONTRACT… 2 • Generation Guarantee ü 1. 6 Million units / MW annually i. e. total of 20. 8 MUS / Annum (Tolerance band of +/- 5%) for the period of 5 years ü Variation in guaranteed units below tolerance shall be charged at Rs. 8 / unit or discom landed cost to the Contractor. The measurement of the generation shall be done on annual basis. • Scope of Work- Contractor Pre-Commencement of the project: ü 1. Captive Open Access approvals from all relevant authorities ü 2. All Evacuation approvals from relevant authorities ü 3. Land Clearances/approvals ü 4. PCB Clearances/approvals ü 5. All Gram panchayat / governing body clearances/approvals After Commissioning of the project: ü 6. Approvals of Chief Engineer Electrical from Government of Telangana ü 7. All approvals from relevant authorities for evacuation of power post commissioning

SPECIAL CONDITIONS OF CONTRACT… 3 • Defect Liability Period & Warranties ü 5 years

SPECIAL CONDITIONS OF CONTRACT… 3 • Defect Liability Period & Warranties ü 5 years of DLP ü 25 years of Warranty period for solar modules & 5 years for Inverters • Contract Performance Guarantee, Retention Money & Warranty Bond ü Contract Performance Guarantee of 10% of Contract Price shall be submitted by Contractor for Contract Period (8 months) +1 month. ü Warranty Bond for entire 5 years +1 month of O&M Period shall be submitted before expiry of Contract Performance Guarantee. ü Retention shall be of 10% of the Contract Price for guaranteed generation. Contract Period (8 months) Period DLP Period ( 5 years) Day Day Year Year 0 60 120 240 1 2 3 4 5 Contract Performance Guarantee @10% Risk Cover Retention @10% Warranty Bond @10%

SPECIAL CONDITIONS OF CONTRACT… 4 Terms of Payment for the Project 1) 1% of

SPECIAL CONDITIONS OF CONTRACT… 4 Terms of Payment for the Project 1) 1% of the Contract Price after the land is registered in the name of the Owner. 2) 5% of the Contract Price shall be paid against Proforma/Advance Invoice as advance against Advance Bank Guarantee in prescribed format having validity till completion of the project. These advances will be recovered by the Owner from each subsequent Tax Invoice raised by the Contractor. The 2 nd milestone payment shall be disbursed after 1 st milestone is completed 3) 4% of the Contract Price shall be paid against submission of approved final Design Documents / Drawings to the Owner for entire Scheme as well as Captive Open Access Approvals from all relevant authorities. 4) 50% of the Contract Price shall be paid on pro-rata basis against the receipt of materials at site & payment will be given as advance against Proforma/Advance Invoice. 5) 45% of the Contract Price shall be paid on the installation, testing, commissioning & taking over of the entire Electrical works and acceptance of SPV Plant by the Owner.

SPECIAL CONDITIONS OF CONTRACT… 5 # Company Voltage level of the Service no. service

SPECIAL CONDITIONS OF CONTRACT… 5 # Company Voltage level of the Service no. service connection BJH 1069 B#2 A 33 k. V BJH 1016 B#2 B BJH 1028 B#4 BJH 974 B#10 1 BJH 988 B#1 A KRIT BJH 906 B#1 B BJH 903 B#3 A 11 k. V BJH 1020 B#3 B BJH 844 B#5 A BJH 864 B#7 BJH 857 B#8 2 Intime 33 k. V BJH 1289 B#6 BJH 1353 B#9

APPROVED MAKES for major components Components PV Modules Inverters Preferred Make Canadian Solar Trina

APPROVED MAKES for major components Components PV Modules Inverters Preferred Make Canadian Solar Trina Solar JA Solar Astro Chint Jinko Solar Hanwah ABB TMEIC Schneider Ingeteam SMA

APPROVED MAKES for major components Components Preferred Make Transformers (LV/33 k. V) ABB Raychem

APPROVED MAKES for major components Components Preferred Make Transformers (LV/33 k. V) ABB Raychem SNR Crompton Kirloskar T&R Voltamp Universal

QUALIFICATION REQUIREMENT OF BIDDER • Technical ü The Contractor should have designed, supplied, erected/

QUALIFICATION REQUIREMENT OF BIDDER • Technical ü The Contractor should have designed, supplied, erected/ supervised erection and commissioned/ supervised commissioning of ground mounted Solar Photo Voltaic (SPV) based grid connected power plant(s) of cumulative installed capacity of atleast 20 MWp or above, out of which at least one plant should have been of 5 MWp capacity or above. The above plant mentioned of 5 MWp or above capacity must have been in successful operation for at least six (6) months prior to the bid date. ü The SPV based grid connected power plant of 5 MWp or above capacity should be at a single location developed by Contractor for itself or any other client. • Financial ü The Average Minimum Annual Turnover (MAT) of the Bidder during last three financial years shall not be less than Rs 25 Crore