Capital Facility Spill East Providence RI August 31

  • Slides: 21
Download presentation
Capital Facility Spill East Providence, RI August 31 - Present CDR Paul Lattanzi Sector

Capital Facility Spill East Providence, RI August 31 - Present CDR Paul Lattanzi Sector Southeastern New England Coast Guard Incident Commander

CAPITAL TANK FARM/FACILITY EPA USCG SITE OF SPILL PIPELINE OUTFALL LOCATED BENEATH I-195 BRIDGE

CAPITAL TANK FARM/FACILITY EPA USCG SITE OF SPILL PIPELINE OUTFALL LOCATED BENEATH I-195 BRIDGE PIPELINE USCG PIER TERMINAL Capital Terminal Facility and EPA/USCG OSC Boundary EPA

Oil loss while pipeline under pressure of oil transfer from barge to tank farm.

Oil loss while pipeline under pressure of oil transfer from barge to tank farm. Barge pumps ran approx 5 minutes.

Valley Street Railroad Tracks

Valley Street Railroad Tracks

Sp ray zo ne Ruptured pipeline Rail road 500 ft of containment boom (precautionary

Sp ray zo ne Ruptured pipeline Rail road 500 ft of containment boom (precautionary measure) trac k Command Post Staging Area

Puncture in pipeline 12 Feet

Puncture in pipeline 12 Feet

Affected Outfall Spill Site Affected Storm Drains Department of Public Works City Storm Drain

Affected Outfall Spill Site Affected Storm Drains Department of Public Works City Storm Drain Schematics

I-195 Eastbound Outfall under bridge Marina at Houlihan’s Tavern Storm drain outfall located below

I-195 Eastbound Outfall under bridge Marina at Houlihan’s Tavern Storm drain outfall located below the I-195 bridge.

Outfall under I-195 Bridge Containment Boom & Sorbent Boom (almost high tide) Outfall

Outfall under I-195 Bridge Containment Boom & Sorbent Boom (almost high tide) Outfall

Summary • Total volume spilled was unknown until volume required to repack pipeline was

Summary • Total volume spilled was unknown until volume required to repack pipeline was determined. Total spill (not accounting for amount recovered) estimated at approx 68 K gallons. • Mass balance of oil loss, recovery, and remaining in the environment being finalized and agreed to by UC. • Recovery wells in place and ground water contamination plume being mapped by RP’s contractors. • No further sheening from Valley Street outfall. Migration of oil in ground water has not resulted in a sheen in the river. • Shifted from emergency response (Unified Command) to long term remediation led by RI DEM

Placeholder Sunken Barge SUNKEN PAINT BARGE 11 NEWPORT BRIDGE

Placeholder Sunken Barge SUNKEN PAINT BARGE 11 NEWPORT BRIDGE

Placeholder Sunken Barge 12

Placeholder Sunken Barge 12

Placeholder Sunken Barge 13

Placeholder Sunken Barge 13

SUNKEN PAINT BARGE NEWPORT BRIDGE Unified Command: Sunken Placeholder Barge ØU. S. Coast Guard

SUNKEN PAINT BARGE NEWPORT BRIDGE Unified Command: Sunken Placeholder Barge ØU. S. Coast Guard ØR. I. Dept of Environmental Management ØAbhe & Svoboda ØR. I. Turnpike & Bridge Authority Assisted by: ØDonjon Marine ØSave The Bay ØClean Harbors 14

Placeholder Sunken Barge 15

Placeholder Sunken Barge 15

Placeholder Sunken Barge 16

Placeholder Sunken Barge 16

Placeholder Sunken Barge 17

Placeholder Sunken Barge 17

Placeholder Sunken Barge 18

Placeholder Sunken Barge 18

Placeholder Sunken Barge 19

Placeholder Sunken Barge 19

Placeholder Sunken Barge 20

Placeholder Sunken Barge 20

Placeholder Sunken Barge 21

Placeholder Sunken Barge 21