CAFE workplan CAFE WG TS PA 16 June 2004 http: //europa. eu. int/comm/environment/air/cafe/pdf/workplan_part_a. pdf

CAFE workplan CAFE WG TS PA 16 June 2004 http: //europa. eu. int/comm/environment/air/cafe/pdf/workplan_part_a. pdf André Zuber European Commission Environment Directorate-General Clean Air and Transport Unit Clean Air for Europe

Schematic outline of CAFE timeline Technical inputs of abatement potential and costs Development CBA

Schematic outline of CAFE timeline Technical inputs of abatement potential and costs Development CBA framework Accompanying legislation / measures Development of TREMOVE transport model Finalisation of RAINS model development Consultations with MS qnd industry CAFE Baseline ready & agreed Model runs of policy packages Definition of policy packages Advice on health and ecosystems effects 2003 Publish CAFE Baseline Data on NEC, AQ and own studies 2004 WHO summary report Clean Air for Europe Assessing policies qualitatively and quantitatively Thematic Strategy Revised NEC Drafting Integrated policy advice and Thematic Strategy Input from conferences 2005 2006

CAFE workplan Preparing the Thematic strategy on air pollution l November CAFE SG advice

CAFE workplan Preparing the Thematic strategy on air pollution l November CAFE SG advice on policy options l February 2005 CAFE SG integrated policy advice l 1 April 2005 – TS to Commission Interservice Consultation l May 2005 - CAFE SG and information on main policy packages l June 2005 – TS adopted by Commission with proposals for legislation Clean Air for Europe

CAFE workplan WG Target Setting and Policy assessment l l September 2004 – first

CAFE workplan WG Target Setting and Policy assessment l l September 2004 – first results of RAINS Pa. M scenarios and further advice from CAFE WG TSPA on Pa. Ms November 2004 – discussions of results in CAFE WGs and SG. Possibly further advice. Jan/Feb 2005 – Joint meeting with the WG PM. Discussion of IAM results and further final advice Mars 2005 Possible WG TS PA final adjustments Clean Air for Europe

CAFE workplan New contracts in 2004 l Analysis and design of local air quality

CAFE workplan New contracts in 2004 l Analysis and design of local air quality measurements l NEC review l l Analysis of synergies between air pollution and climate change policies + Review of CBA methodology Optimal control areas for eutrophication, acidification and tropospheric ozone in the enlarged EU l Adaptation of target load functions for RAINS l Technical support for development of Euro 5 and 6 Clean Air for Europe