CAAC ADSB Implementation Introduction Air Traffic Regulation Office
CAAC ADS-B Implementation Introduction Air Traffic Regulation Office (ATRO) April. 2012
Contents 1. CAAC ADS-B Implementation Preliminary Work 2. CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
Preliminary Work — Policy, Specification and Standards u 2010, CAAC ATRO Published CAAC Surveillance Technology Implementation Policy (AC-115 -TM-2010 -01), Includes ADS-B Application Strategy. u 2011, CAAC ATRO and ATMB Published ADS-B ATC Operation Specification (AC-93 -TM-2011 -01) u 2012, CAAC ATRO finished ADS-B 1090 MHz ES Ground Station(Receive) Technology Specification
Preliminary Work — Policy, Specification and Standards u 2008, CAAC Flight Standards Department Published ADS-B Flight Operation(IB-FS-2008 -002 ) u 2010, CAAC Aircraft Airworthiness and Flight Standards Department Published Airworthiness and Operational Approval of ADS-B Application in non-radar areas via 1090 MHz ES(AC-91 -FS/AA -2010 -14)
Preliminary Work — Policy, Specification and Standards u 2010, CAAC Aircraft Airworthiness Published ADS-B and TIS-B Airborne Equipment Standards (CTSO-C 166 b) u 2011, ATMB Began to Preparation of ADS-B Implementation Road Map.
Preliminary Work — ADS-B Equipment Certification Feb. 2012,CAAC ATRO Authorize TEDC. CO. LTD ADS-B Ground Station Lisence
Preliminary Work — ADS-B Route Surveillance Verification Oct. 2009,ATMB Cheng. Du—Jiu. Zhai Route Archive to ADS-B surveillance coverage, including 2 ADS-B Ground Station.
Preliminary Work — ADS-B Application and Trail Operation May, 2011, Cheng. Du—La. Sha Route ADS-B began Trail Operation,including 6 Ground Station.
Preliminary Work — ADS-B Route Surveillance Application July. 2011, Z 1 route archive to ADS-B aurveillance coverage, ATMB is in charge of ADS-B trail operation, CAACSRI responsble for the whole project build. The project includes six ADS-B ground station
Preliminary Work — ADS-B Application Seminar Aug. 2011,ADS-B Application Seminar held in Cheng. Du CAAC decides on ADS-B data link: Transport Aviation: 1090 MHz ES data link General Aviation: 1090 MHz ES data link
Contents 1. CAAC ADS-B Implementation Preliminary Work 2. CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
CAAC ADS-B Next Phase Work u Preparation of CAAC ADS-B Overall Planning and implementation of program u Standards, specifications and supporting polices of ADS-B application formulation and amendment. u ADS-B application problem research, includes: ü ADS-B anti-spoof and jamming studying ü ADS-B signal mixed fruit studying ü Compass 2 integrity impacts on ADS-B ü Data Fusion of ads-b and other surveillance source
CAAC ADS-B Next Phase Work Launch a series of ADS-B technology and function application verification projects, such as: ü air-air surveillance application based on ADS-B IN function. includes Commercial and General Aviation ü ADS-B ground station TIS-B/FIS-B function application verification. ü ADS-B airborne equipment application verification based on GNSS(GPS + Compass 2)
Contents 1. CAAC ADS-B Implementation Preliminary Work 2. CAAC Next Phase Work 3. “ADS-B General Plan and Implementation of CAAC” release schedules
CAAC ADS-B Implement Office & Work Group Feb. 2012, CAAC ADS-B implement office & workgroup established. The Organization includes members of unit: CAAC Flight Standards Department CAAC Aircraft Airworthiness CAAC Air Traffic Regulation Office (ATRO) CAAC Air Traffic Management Bureau (ATMB) The Second Research Institute of CAAC(CAACSRI)
ADS-B Implementation Task Division of CAAC department u ATRO and CAACSRI responsible for preparation of “ADS-B General Plan and implementation solution of CAAC” u CAAC Flight Standards Department responsible formulating airborne equipment updating plan and flight crew training u CAAC Aircraft Airworthiness and Flight Standards Department responsible for ADS-B airborne equipment airworthiness certification
Task Division of CAAC department in ADS-B implement u ATRO responsible for the promulgation of the ADS-B ground station standard and ADS-B ground station equipment certification u ATMB excutes CAAC ADS-B implement program and responsible for preparation of the specification of ATC operation, equipment operation and staff training.
Release Schedules u May. 2012 Complement the draft of “ADS-B General Plan and Implementation Solution of CAAC”. u June. 2012 Submit to the ADS-B Implement office the comments edition of “ADS-B General Plan and Implementation Solution of CAAC”. u July. 2012 CAAC authority release official version.
Thanks!