Bus Rapid Transit for Chennai February 2014 Chennai

Bus Rapid Transit for Chennai February 2014


Chennai city bus service GOOD PATRONAGE 50 lakh daily passenger trips 3650 buses Maximum flow of 14400 pphpd 5000 -10000 pphpd on many corridors BUT Buses are overcrowded Average speed is low ~16 kmph No integration with other modes

Demand for public transport by 2017 Population of CMA is expected to be 10. 5 million people Tamil Nadu government's stated goal for public transport mode share of 40% of all trips (incl. walk and cycle) To achieve this goal, public transport should have a capacity of 11 million trips per day. If this capacity is not build in the form of high-capacity highquality public transport, stated goal will not be achieved. • Rail systems will be able to serve only around 2. 5 million trips • Bus based transport would have to serve ~7 million trips • Paratransit and taxi services will account for the remaining trips


18000 lane-km of new roads! Investment: Rs. 36, 000 cr 3500 new buses 80 km BRT NMT MMI Parking Investment: Rs. 3, 000 cr

Mode Shift 2013 – 2018 Goal PT to achieve 60% motorized modes

Projects in Action





Chennai Street Revitalization Program

Chennai NMT Policy - Vision • Chennai will be a city with a general sense of well-being through the development of quality and dignified environment where people are free to walk and cycle; equitable allocation of public space and infrastructure; and access to opportunities and mobility for all residents.

Chennai Cycle Sharing • 158 cycle sharing stations sited near: – Rapid transit stations – Commercial centres, colleges, parks, cultural destinations – Areas without public transport access • 3 sizes: – Large: 60 docks or parking area – Medium: 30 docks – Small: 15 docks • 3, 090 cycles

Developing an Integrated, High Quality Bus & BRT Network OBJECTIVES 1. Expansion of the bus fleet to better serve existing demand expand public transport usage. 2. Implement BRT to expand the reach of mass rapid transit. 3. Provide better information to enhance public transport user experience. 4. Simplify fare collection and integrate it across modes

684 7000 6000 1 800 5000 4000 BUS FLEET REQUIREMENT: 1000 3 400 3000 2000 883 Enhancing City Bus Fleet & Quality Yr 2014: 5, 000 0 Existing For comfortable journey Due to Shift from share autos Reduction because of route rationalisation

26% 64%

Chennai BRT Phase-1 80 km network INR 11 billion investment 1. 5 million trips/day (2016)

High quality stations | Real-time information Smart electronic fare collection at stations

Rapid | Dependable Easy to access









Chennai BRT corridors Corridor Maduravoyal – CMBT Passengers per hour per direction Length (km) 14. 0 3, 300 7. 7 9, 200 CMBT – Madhavaram 12. 4 3, 100 Siruseri – Saidapet 24. 8 8, 200 Tambaram – Airport 10. 5 7, 900 GST Road Junction – Thoraipakkam 10. 6 1, 800 Total 80. 0 Ambattur – Thirumangalam

Implementation costs Corridor Maduravoyal – CMBT Length (km) Cost (crore Rs) 14. 0 196 7. 7 108 CMBT – Madhavaram 12. 4 149 Siruseri – Saidapet 24. 8 372 Tambaram – Airport 10. 5 158 GST Road Junction – Thoraipakkam 10. 6 127 Total 80. 0 1, 110 Ambattur – Thirumangalam

100 Feet Rd near Padi: existing

100 Feet Rd near Padi: proposed

OMR BRT corridor: existing

OMR BRT corridor: proposed Passing lanes increase system capacity

Integration with metro & MRTS From/to Metro Drop-off Link Bridge From/to street Drop-off From/to street BRT

Ensuring quality: The BRT Standard

Effective PPP structure Government (SPV) Private bus operator • Sets operating parameters • Monitors system performance • Receives all fare revenue • Reimburses operators for services performed (with penalties, where applicable) • Operates the buses • Carries out maintenance Fare collection operator • Issues tickets and collects revenue Other operators • Station maintenance, security, etc

SPV structure Board of Directors Managing Director Planning & design • Route planning • Infrastructure design • Business model • Financial analysis • Long-term vision • • Operations Admin & finance Scheduling Fleet monitoring Fare collection Quality control • Financial management • Contracting & payments • Human resources • Physical resources • Legal Communications and marketing • Public information strategy • User surveys • Corporate identity • Marketing • Media relations

Implementation timeline year 1 year 2 year 3 SPV formation Design consultants Infrastructure contract Bus operations contract Bus procurement IT contract IT procurement Testing Marketing

VISION 2023