Building regulations Dr inż. Aleksandra Sambor
The building permit is issued by the starost at the investor's request. It is valid for 2 years from the date on which the decision became final. https: //kb. pl/porady/ile-czeka-sie-na-pozwolenie-na-budowe-w -roznych-regionach-polski/
The building permit can only be issued to those who: • submitted an application in this matter during the period of validity of the decision on building and land development conditions, if it is required pursuant to the provisions on spatial planning and development; • made a statement, under pain of criminal liability, about his right to dispose of the property for construction purposes.
The building permit The application for a building permit must include: • investor's identification data (name and surname or name of the institution and address) and proxy if acting on his behalf, • name and type of the entire construction intent, type of object or group of objects or construction works, as well as the address of the investment and geodetic marking of the area name of the precinct, number of the map sheet, plot number.
The building permit The application should be accompanied by: • declaration of having the right to dispose of the property for construction purposes, • construction design (in 4 copies) together with: designers' statement on the preparation of the construction design, in accordance with applicable regulations and the principles of technical knowledge, certificates on the belonging of designers to the relevant chamber of professional self-government as of the date of designing, opinions, arrangements, permits,
The building permit checks and others documents required by specific provisions regarding: carrying out works at the object entered in the register of monuments or in the area entered in the register of monuments, conducting archaeological research as part of the investment, exit and inclusion in the public road, location of the building in the road strip, water supply and sewage disposal, electricity supply,
The building permit connection to telecommunications networks, gas supply, heat energy supply, land exclusion from agricultural production, location of planned networks and connections, fire protection, safety occupational health and safety, sanitary and hygienic matters, the location of the building in the area of rivers and floodplains.
Construction works requiring a building permit Design documentation should include: 1. Construction project required by the provisions of the "Building Law" to the extent adapted to the specifics of the investment 2. Detailed designs supplementing the construction design to the extent necessary to perform the works, broken down into groups of works in accordance with the 'Common Procurement Vocabulary' 3. Bill of quantities 4. Information on safety and health protection
Construction works requiring a building permit Construction works that require a building permit: • construction of single-family houses that do not fit entirely on the one plot; • building a utility object - garage, shed, porch or winter garden - whose area exceeds 35 m²; • construction of a leisure or recreation facility larger than 35 m²; • building a garden arbor, whose area exceeds 35 m²; • construction of a pool or pond with an area exceeding 50 m²;
The building permit A complete building permit application and attachments are submitted to the appropriate poviat eldership. A state administration unit must review our documentation and provide an appropriate response.
The building permit The statutory waiting time for a response regarding a building permit is 65 days. This is the deadline within which the eldership must consider the document and provide a written answer. https: //kb. pl/porady/ile-czeka-sie-na-pozwolenie-na-budowe-w -roznych-regionach-polski/