BUILDING CONSTRUCTION 1 ARC 1523 Assignment 2 Integrated
BUILDING CONSTRUCTION 1 – ARC 1523 Assignment 2 : Integrated Construction Detailing / Drawing Bevelled glazing cap 116 50 Construction Detail 1 : Curtain Wall Sheet metal Material used: 1. Laminated glass 2. Steel setting blocks 3. Mineral wool insulator Insulated façade panel Double glazing 116 Double glazing Clamping section Post section Floor plan Scale 1 : 100 30 69 28 Section A Scale 1: 20 Construction Detail 2 : Aluminium framed window /glass panel Detail 1 Material used: 1. Aluminium 2. Tempered glass 3. Rubber welding Connection of glass to glass (curtain wall), window glazing 28 Cover strip Construction Detail 3 : Strip foundation Setting block Weatherstripping Detail 1 Weatherstripping Screw Connection of glass roof to glass wall , ridge connection Insulating section Double glazing Material used: 1. Concrete 2. reinforcement bar 3. Welded mesh 4” cement floor slab 8” concrete block wall 28 Glazing bead Minimum 12” Ground level Section B Scale 1: 20 Weatherstripping Detail 2 Thermal break The connection of glass panel with aluminium frame. The section shows the connection from head to cill 20 77 91 2 no. of ½” diameter bars Window frame 7” 9” Setting block Edge tape Detail 3 The strip foundation is basically a strip, or ribbon, of inside concrete running under all the loadbearing walls Wall reinforcement 3/8” links at 12” ctrs. 8” 8” 8” Permanently elastic joint References: 1. Schittich, Staib, Balkow, Schuler & Sobek. (2008). Glass Construction Manual (2 nd ed). Edition Detail. 2. Foundation (http: //www. buildingregs 4 plans. co. uk/foundation_floor_wall_3 d_detail. php). 3. Australian Window association. (2006). Installation. Retrieved from http: //www. valleywindows. com. au/documents/win_guide_Print 2. pdf NAME : KHOO CHEE MEI ID : 0303125
- Slides: 1